9108 N DE SOTO AVE 91311

Certificate Information: 9108 N DE SOTO AVE 91311

Application / Permit
19010-10000-01587
Plan Check / Job No.
B19LA07601
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
NEW 49'10" X 49'10" ( 2500 sq ft) TYPE VB 1 STORY RETAIL BUILDING
Permit Issued
Issued on 11/5/2020
Issuing Office
Metro
Current Status
CofO Issued on 5/5/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/16/2019 APPLICANT
Assigned to Plan Check Engineer 5/2/2019 MICHAEL PEREZ
Disabled Access Plans Picked Up 5/6/2019 APPLICANT
Corrections Issued 5/9/2019 MICHAEL PEREZ
Quality Review Completed 5/22/2019 QUAN NGHIEM
Building Plans Picked Up 5/29/2019 APPLICANT
Plan Check Approved 10/31/2019 MICHAEL PEREZ
Green Plans Picked Up 9/21/2020 APPLICANT
Issued 11/5/2020 APPLICANT
CofO in Progress 5/4/2022 JEFFREY DURAN
Permit Finaled 5/5/2022 RICKEY JACKSON
CofO Issued 5/5/2022 RICKEY JACKSON
Permit Finaled 5/5/2022 RICKEY JACKSON

Permit Application Clearance Information

Highway dedication Cleared 5/15/2019 MARKOS PEREZ-BRAN
Low Impact Development Cleared 6/19/2019 ANDRES COVARRUBIAS
Eng Process Fee Ord 176,300 Cleared 6/25/2019 GUILLERMO PETRA
Hydrant and Access approval Cleared 6/25/2019 GILBERT URREA
Sewer availability Cleared 6/25/2019 GUILLERMO PETRA
Roof/Waste drainage to street Cleared 8/13/2019 LEE GUILBEAUX
Food Service Establishment Cleared 8/14/2019 RAMESHBHAIR PATEL
DAS Clearance Cleared 9/9/2019 MICHAEL PEREZ
"Q" conditions Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
"T" removal Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
CPC Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
Comm Cor/Mini-Mall Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
Comm Cor/Mini-Mall Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
Frnt yard landscape/Water mgmt Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
Prkng lot landscape/Water mgmt Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
Trees in Parkway Cleared 10/7/2019 ADRIAN SANCHEZ
ZI Cleared 10/7/2019 SOPHIE GABEL-SCHEINBAU
Green Code Cleared 10/18/2019 KHEDER ALRAZAA
Food establishment approval Cleared 10/30/2019 LACDHS APPROVED
Permit Cleared 10/31/2019 ERIK BEASLEY

Contact Information

Contractor P R Construction Inc; Lic. No.: 673267-B 1995 BATAVIA STREET      ORANGE, CA 92865
Engineer Lalonde,, Philippe Jean; Lic. No.: C68927 6617 RED BUD RD      FORT WORTH, TX 76135
Engineer Peyton,, David E; Lic. No.: S3288 5722 E THE TOLEDO      LONG BEACH, CA 90803

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/6/2021 Approved HAMID PISHEHVAR
Footing/Foundation/Slab 5/18/2021 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 5/21/2021 Approved ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/30/2021 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 8/4/2021 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 8/9/2021 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 8/17/2021 Not Ready for Inspection GRANT WOODS
Verify Sprinkler Sign Off 8/17/2021 Approved GRANT WOODS
Wood Frame 8/17/2021 Partial Inspection GRANT WOODS
Green Building Rough 8/19/2021 Not Ready for Inspection KENNETH ROBERTS
Interior/Exterior Lathing 8/19/2021 Partial Approval KENNETH ROBERTS
Wood Frame 8/19/2021 Partial Approval KENNETH ROBERTS
Insulation 8/20/2021 Approved CAMERON CHABAN
Light Gage Steel Frame 8/26/2021 Corrections Issued DANNY RODRIGUEZ
Green Building Rough 8/30/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/30/2021 Corrections Issued ROBERT DAVIS
Wood Frame 8/30/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 9/2/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/2/2021 Approved ROBERT DAVIS
Drywall Nailing 9/7/2021 Approved ROBERT DAVIS
T-Bar Ceiling 9/27/2021 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 10/22/2021 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 10/22/2021 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 10/22/2021 Partial Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/22/2021 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 10/22/2021 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 10/22/2021 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 11/9/2021 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 12/23/2021 Not Ready for Inspection JEFFREY FULTON
T-Bar Ceiling 1/11/2022 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 1/18/2022 Partial Approval DANNY RODRIGUEZ
Final 2/14/2022 Partial Inspection DANNY RODRIGUEZ
Green Building Final 2/14/2022 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 2/14/2022 Approved DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 2/14/2022 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 2/14/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 2/14/2022 Not Ready for Inspection DANNY RODRIGUEZ
Final 3/3/2022 Partial Inspection DANNY RODRIGUEZ
Green Building Final 3/3/2022 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 3/3/2022 SGSOV Approved DANNY RODRIGUEZ
Smoke Detectors 3/3/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 3/3/2022 Not Ready for Inspection DANNY RODRIGUEZ
Final 3/18/2022 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 3/18/2022 Not Ready for Inspection DANNY RODRIGUEZ
Smoke Detectors 3/18/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 3/18/2022 Not Ready for Inspection DANNY RODRIGUEZ
Final 4/15/2022 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 4/15/2022 Approved DANNY RODRIGUEZ
Smoke Detectors 4/15/2022 Approved DANNY RODRIGUEZ
Wood Frame 4/15/2022 Approved DANNY RODRIGUEZ
Final 4/25/2022 Partial Approval DANNY RODRIGUEZ
Final 5/3/2022 OK to Issue CofO JEFFREY DURAN
Special/Order Compliance 5/3/2022 Approved JEFFREY DURAN
Final 5/4/2022 No Result Entered JEFFREY DURAN