5500 W 98TH ST QTA 90045

Certificate Information: 5500 W 98TH ST QTA 90045

Application / Permit
19010-10000-01552
Plan Check / Job No.
B19LA07486
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(9) Automobile Service Station
Work Description
LAX LAMP CONRAC QTA , 3 STORY TYPE I-A AUTO SERVICING & REPAIR BUILDING.
Permit Issued
Issued on 6/16/2020
Issuing Office
Metro
Current Status
Issued on 6/16/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/23/2019 APPLICANT
Assigned to Plan Check Engineer 5/16/2019 QUAN NGHIEM
Corrections Issued 5/24/2019 QUAN NGHIEM
Quality Review Completed 5/24/2019 MINYE PAK
Building Plans Picked Up 5/28/2019 APPLICANT
Applicant returned to address corrections 10/30/2019 GARO TELMI
Plan Check Approved 6/5/2020 GARO TELMI
Issued 6/16/2020 LADBS
TCO Issued (Expire Date: 01-08-2024) 7/12/2023 NICK LAROCCA
TCO Issued (Expire Date: 07-08-2024) 1/10/2024 NICK LAROCCA
TCO Issued (Expire Date: 01-05-2025) 7/9/2024 HENRY BAGHDASSARIAN
TCO Issued (Expire Date: 06-22-2025) 12/24/2024 NICK LAROCCA
TCO Issued (Expire Date: 12-08-2025) 6/11/2025 NICK LAROCCA
TCO Issued (Expire Date: 05-31-2026) 12/2/2025 NICK LAROCCA
TCO Issued (Expire Date: 11-04-2026) 5/8/2026 NICK LAROCCA

Permit Application Clearance Information

Tract Map conditions Cleared 10/3/2019 ANNA VIDAL
Tract Map conditions Cleared 10/3/2019 ANNA VIDAL
Tract Map conditions Cleared 10/3/2019 ANNA VIDAL
Tract Map conditions Cleared 10/3/2019 ANNA VIDAL
ZA Case Cleared 10/3/2019 ANNA VIDAL
City owned building/parcel Cleared 10/16/2019 HAROOT AVANESIAN
Eng Process Fee Ord 176,300 Cleared 10/18/2019 THOMAS LANG
Project Permit Cleared 11/8/2019 QUAN NGHIEM
Sewer availability Cleared 11/20/2019 THOMAS LANG
Trees in Parkway Cleared 11/25/2019 JOHN KIM
Construction within easement Cleared 2/10/2020 WALTER RAMIREZ
DAS Clearance Cleared 2/25/2020 QUAN NGHIEM
Green Code Cleared 3/17/2020 DONALD CRICHLOW
Internal circulation Cleared 4/20/2020 PEDRO AYALA
Specific Plan Cleared 4/20/2020 PEDRO AYALA
Permit Cleared 5/7/2020 MARYAM AZARBAYJANI
Low Impact Development Cleared 5/12/2020 AMMAR ELTAWIL
Hydrant and Access approval Cleared 5/20/2020 JOHN CONNEALLY
Airport buildings Cleared 5/21/2020 ANDREW KO
Fire Marshall Fire Life Safety Cleared 5/21/2020 ANDREW KO
Highway dedication Cleared 6/4/2020 MARYAM AZARBAYJANI
Roof/Waste drainage to street Cleared 6/4/2020 MARYAM AZARBAYJANI
Work Adjacent to Public Way Cleared 6/4/2020 MARYAM AZARBAYJANI
Building over 3-story or 36-ft Cleared 6/5/2020 CALOSHA APPROVED
Cleaning solvents Cleared 6/5/2020 SCAQMD APPROVED
Combustion equipment Cleared 6/5/2020 SCAQMD APPROVED
Excavation more than 5-ft deep Cleared 6/5/2020 CALOSHA APPROVED
Gasoline station Cleared 6/5/2020 SCAQMD APPROVED
Internal combustion engine Cleared 6/5/2020 SCAQMD APPROVED
Solvents/fuels Cleared 6/5/2020 SCAQMD APPROVED
Underground fuel tank Cleared 6/5/2020 GREGORY STEVENS

Contact Information

Architect Gerber,, Jeffrey P; Lic. No.: C27945 14 ESTANCIA PLACE      THE WOODLANDS, TX 77309
Architect Lee,, Millard A; Lic. No.: C9113 505 BIENVEIEDA AVENUE      PACIFIC PALISADES, CA 90272
Contractor Pcl Construction Services Inc; Lic. No.: 474555-A 655 N CENTERAL AVE STE 1600      GLENDALE, CA 91203
Engineer Baumgardner,, Jeffrey Ray; Lic. No.: C77759 525 N FRANCISCA AVE UNIT 8      REDONDO BEACH, CA 90277
Engineer Canta,, Marco Jay Cruz; Lic. No.: C69244 2386 E DEL MAR BL UNIT 207      PASADENA, CA 91107
Engineer Faghihi,, Mahmoud; Lic. No.: S5789 888 S FIGUEROA STREET 18TH FLOOR      LOS ANGELES, CA 90017
Engineer Harris,, James Edward; Lic. No.: GE2100 3072 BURNEY PLACE      LOS ALAMITOS, CA 90720

Inspector Information

NICK LAROCCA, (213) 473-2153 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 6/23/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/24/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/25/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/26/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/29/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/30/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/7/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/8/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/8/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/9/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/10/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/13/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/13/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/14/2020 Conditional Approval NICK LAROCCA
Deputy Reinf. Concrete 7/14/2020 Conditional Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/15/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/15/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/16/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/16/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/17/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/17/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/20/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/20/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/21/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/21/2020 Approved NICK LAROCCA
Footing/Foundation/Slab 7/21/2020 Partial Approval TED RIES
Pre-Inspection 7/21/2020 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 7/22/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/22/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/22/2020 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/22/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 7/23/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/23/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/23/2020 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 7/23/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 7/24/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/24/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 7/24/2020 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 7/24/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 7/27/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/27/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/27/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/27/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/27/2020 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 7/27/2020 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 7/28/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/28/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/28/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/28/2020 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/28/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 7/29/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/29/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/29/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/29/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/29/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 7/30/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/30/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/30/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/30/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/30/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/30/2020 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 7/30/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 7/31/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/31/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/31/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/31/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/31/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/31/2020 Partial Approval TED RIES
Pre-Inspection 7/31/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/3/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/3/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/3/2020 Partial Inspection TED RIES
Pre-Inspection 8/3/2020 Approved ALAN NOVAK
Deputy Pre-Stress Concrete 8/4/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/4/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/4/2020 Partial Approval TED RIES
Footing/Foundation/Slab 8/4/2020 Not Ready for Inspection ALAN NOVAK
Footing/Foundation/Slab 8/4/2020 Not Ready for Inspection TED RIES
Green Building Rough 8/4/2020 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/4/2020 Not Ready for Inspection TED RIES
Verify Sprinkler Sign Off 8/4/2020 Not Ready for Inspection TED RIES
Deputy Pre-Stress Concrete 8/5/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/5/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/5/2020 Not Ready for Inspection ALAN NOVAK
Reinforced Concrete Frame 8/5/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/6/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/6/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/6/2020 Partial Approval TED RIES
Pre-Inspection 8/6/2020 Not Ready for Inspection ALAN NOVAK
Deputy Pre-Stress Concrete 8/7/2020 Approved TED RIES
Deputy Reinf. Concrete 8/7/2020 Approved TED RIES
Excavation/Setback/Form/Re-Bar 8/7/2020 Partial Approval TED RIES
Pre-Inspection 8/7/2020 Approved TED RIES
Deputy Pre-Stress Concrete 8/10/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/10/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/10/2020 Partial Approval NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/10/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/11/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/11/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/11/2020 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 8/11/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/12/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/12/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/12/2020 Partial Approval NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/12/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/13/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/13/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/13/2020 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/14/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/14/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/14/2020 Partial Approval NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/14/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/17/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/17/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/17/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/17/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/17/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/17/2020 Not Ready for Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/17/2020 Not Ready for Inspection TED RIES
Deputy Pre-Stress Concrete 8/18/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/18/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/18/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/18/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/18/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/18/2020 Partial Approval TED RIES
Pre-Inspection 8/18/2020 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/19/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/19/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/19/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/19/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/19/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/19/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 8/19/2020 Approved TED RIES
Reinforced Concrete Frame 8/19/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/20/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/20/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/20/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/20/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/20/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/20/2020 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 8/20/2020 Not Ready for Inspection TED RIES
Deputy Pre-Stress Concrete 8/21/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/21/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/21/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/21/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/21/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/21/2020 Not Ready for Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/21/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/24/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/24/2020 Approved TED RIES
Deputy Reinf. Masonry 8/24/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/24/2020 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/25/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/25/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/25/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/25/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/25/2020 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/26/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/26/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/26/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/26/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/26/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/26/2020 Partial Approval TED RIES
Pre-Inspection 8/26/2020 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/27/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/27/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/27/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/27/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/27/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/27/2020 Partial Approval NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/27/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/28/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/28/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/28/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/28/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 8/28/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/28/2020 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 8/28/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 8/31/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 8/31/2020 Approved TED RIES
Deputy Reinf. Concrete 8/31/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/31/2020 Approved TED RIES
Excavation/Setback/Form/Re-Bar 8/31/2020 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 8/31/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 9/1/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/1/2020 Approved TED RIES
Deputy Reinf. Concrete 9/1/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/1/2020 Approved TED RIES
Excavation/Setback/Form/Re-Bar 9/1/2020 Partial Approval NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/1/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 9/2/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/2/2020 Approved TED RIES
Deputy Reinf. Concrete 9/2/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/2/2020 Approved TED RIES
Deputy Reinf. Masonry 9/2/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/2/2020 Partial Inspection TED RIES
Pre-Inspection 9/2/2020 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 9/3/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/3/2020 Approved TED RIES
Deputy Reinf. Concrete 9/3/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/3/2020 Approved TED RIES
Deputy Reinf. Masonry 9/3/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/3/2020 Partial Approval TED RIES
Reinforced Masonry Frame 9/3/2020 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 9/4/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/4/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/4/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/4/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/4/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/4/2020 Not Ready for Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/4/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 9/8/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/8/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/8/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/8/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/8/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/8/2020 Partial Approval NICK LAROCCA
Pre-Inspection 9/8/2020 Approved TED RIES
Deputy Pre-Stress Concrete 9/9/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/9/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/9/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/9/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/9/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/9/2020 Partial Approval NICK LAROCCA
Pre-Inspection 9/9/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/10/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/10/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 9/10/2020 Not Ready for Inspection TED RIES
Deputy Pre-Stress Concrete 9/11/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/11/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/11/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/11/2020 Not Ready for Inspection ALAN NOVAK
Reinforced Concrete Frame 9/11/2020 Partial Inspection TED RIES
Deputy Pre-Stress Concrete 9/14/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/14/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/14/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/14/2020 Partial Approval ALAN NOVAK
Pre-Inspection 9/14/2020 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/15/2020 Approved TED RIES
Deputy Reinf. Concrete 9/15/2020 Approved TED RIES
Deputy Reinf. Masonry 9/15/2020 Approved TED RIES
Excavation/Setback/Form/Re-Bar 9/15/2020 Not Ready for Inspection TED RIES
Pre-Inspection 9/15/2020 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/16/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/16/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/16/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/16/2020 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 9/16/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 9/17/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/17/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/17/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/17/2020 Not Ready for Inspection TED RIES
Pre-Inspection 9/17/2020 Approved ALAN NOVAK
Deputy Pre-Stress Concrete 9/18/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/18/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/18/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/18/2020 Partial Approval ALAN NOVAK
Pre-Inspection 9/18/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 9/21/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/21/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/21/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/21/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/21/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/21/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/21/2020 Not Ready for Inspection TED RIES
Excavation/Setback/Form/Re-Bar 9/21/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 9/22/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/22/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/22/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/22/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/22/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/22/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/22/2020 Partial Approval NICK LAROCCA
Pre-Inspection 9/22/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 9/23/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/23/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/23/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/23/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/23/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/23/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/23/2020 Not Ready for Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/23/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 9/24/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/24/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/24/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/24/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/24/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/24/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/24/2020 Partial Approval NICK LAROCCA
Pre-Inspection 9/24/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 9/25/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/25/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/25/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/25/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/25/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/25/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/25/2020 Partial Approval NICK LAROCCA
Pre-Inspection 9/25/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 9/28/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/28/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/28/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/28/2020 Partial Approval TED RIES
Pre-Inspection 9/28/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 9/29/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/29/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/29/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/29/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/29/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/29/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/29/2020 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 9/29/2020 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 9/30/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/30/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/30/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/30/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/30/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 9/30/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/30/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 9/30/2020 Approved TED RIES
Deputy Drilled-In Anchors 10/1/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 10/1/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/1/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/1/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/1/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 10/1/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/1/2020 Partial Inspection TED RIES
Pre-Inspection 10/1/2020 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 10/2/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/2/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/2/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/2/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/2/2020 Partial Approval NICK LAROCCA
Pre-Inspection 10/2/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/5/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/5/2020 Approved TED RIES
Deputy Reinf. Concrete 10/5/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/5/2020 Approved TED RIES
Deputy Reinf. Masonry 10/5/2020 Approved TED RIES
Excavation/Setback/Form/Re-Bar 10/5/2020 Not Ready for Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/5/2020 Partial Approval TED RIES
Deputy Pre-Stress Concrete 10/6/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/6/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/6/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/6/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 10/6/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 10/6/2020 Not Ready for Inspection TED RIES
Deputy Pre-Stress Concrete 10/7/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/7/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/7/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/7/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 10/7/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/7/2020 Partial Approval NICK LAROCCA
Pre-Inspection 10/7/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/8/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/8/2020 Approved TED RIES
Deputy Reinf. Concrete 10/8/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/8/2020 Approved TED RIES
Deputy Reinf. Masonry 10/8/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/8/2020 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 10/9/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/9/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/9/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/13/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 10/13/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/13/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/13/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/13/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 10/13/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/13/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/13/2020 Partial Approval TED RIES
Pre-Inspection 10/13/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/14/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/14/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 10/14/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/14/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/14/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/14/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 10/14/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/14/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/14/2020 Partial Approval NICK LAROCCA
Pre-Inspection 10/14/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 10/15/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 10/15/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/15/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/15/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/15/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 10/15/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/15/2020 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 10/15/2020 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 10/15/2020 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 10/16/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/16/2020 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 10/16/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/16/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/16/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/16/2020 Conditional Approval TED RIES
Deputy Reinf. Masonry 10/16/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/16/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/16/2020 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 10/16/2020 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 10/19/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/19/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/19/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/19/2020 Approved NICK LAROCCA
Deputy Steel/Welding 10/19/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/19/2020 Partial Approval NICK LAROCCA
Pre-Inspection 10/19/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 10/20/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/20/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/20/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/20/2020 Approved NICK LAROCCA
Deputy Steel/Welding 10/20/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/20/2020 Partial Approval NICK LAROCCA
Masonry Wall/Backfill 10/20/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 10/21/2020 Approved TED RIES
Deputy Pre-Stress Concrete 10/21/2020 Approved TED RIES
Deputy Reinf. Concrete 10/21/2020 Approved TED RIES
Deputy Reinf. Masonry 10/21/2020 Approved TED RIES
Deputy Steel/Welding 10/21/2020 Approved TED RIES
Excavation/Setback/Form/Re-Bar 10/21/2020 Partial Approval ALAN NOVAK
Pre-Inspection 10/21/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 10/22/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/22/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/22/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/22/2020 Approved NICK LAROCCA
Deputy Steel/Welding 10/22/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/22/2020 Partial Approval NICK LAROCCA
Pre-Inspection 10/22/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/23/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/23/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/23/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/23/2020 Approved NICK LAROCCA
Deputy Steel/Welding 10/23/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/23/2020 Partial Approval NICK LAROCCA
Pre-Inspection 10/23/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/26/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/26/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/26/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/26/2020 Approved NICK LAROCCA
Deputy Steel/Welding 10/26/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/26/2020 Partial Approval NICK LAROCCA
Footing/Foundation/Slab 10/26/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 10/27/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/27/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 10/27/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/27/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 10/27/2020 Approved NICK LAROCCA
Pre-Inspection 10/27/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 10/28/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/28/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/28/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/28/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/28/2020 Partial Approval ALAN NOVAK
Pre-Inspection 10/28/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 10/29/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 10/29/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 10/29/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/29/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/29/2020 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 10/29/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 10/30/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 10/30/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/30/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 10/30/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/30/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 10/30/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 11/2/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/2/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/2/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 11/2/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/2/2020 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 11/2/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 11/4/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/4/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/4/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/4/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/4/2020 Partial Approval NICK LAROCCA
Pre-Inspection 11/4/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/5/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/5/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/5/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/5/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/5/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/5/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/5/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/5/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/5/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 11/5/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 11/6/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/6/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/6/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/6/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/6/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/6/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/6/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/6/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/6/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 11/6/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 11/9/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/9/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/9/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/9/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/9/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/9/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/9/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/9/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/9/2020 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/9/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 11/10/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/10/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/10/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/10/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/10/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/10/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/10/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/10/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/10/2020 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 11/10/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 11/12/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/12/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/12/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 11/12/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/12/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/12/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 11/12/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/13/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/13/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/13/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 11/13/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/13/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 11/13/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/16/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/16/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/16/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 11/16/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/16/2020 Partial Approval NICK LAROCCA
Pre-Inspection 11/16/2020 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 11/17/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/17/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/17/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/17/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/17/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/17/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/17/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/17/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/17/2020 Partial Approval ALAN NOVAK
Pre-Inspection 11/17/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 11/18/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/18/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/18/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/18/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/18/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/18/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/18/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/18/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/18/2020 Partial Approval NICK LAROCCA
Pre-Inspection 11/18/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 11/19/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/19/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/19/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/19/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/19/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/19/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 11/19/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/19/2020 Partial Approval ALAN NOVAK
Pre-Inspection 11/19/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/20/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/20/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/20/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/20/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/20/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/20/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/20/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/20/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/20/2020 Partial Approval NICK LAROCCA
Pre-Inspection 11/20/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 11/23/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 11/23/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/23/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/23/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/23/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/23/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/23/2020 Approved NICK LAROCCA
Deputy Steel/Welding 11/23/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/23/2020 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 11/23/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 11/24/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/24/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/24/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/24/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 11/24/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/24/2020 Partial Approval ALAN NOVAK
Pre-Inspection 11/24/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/25/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 11/25/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/25/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 11/25/2020 Approved ALAN NOVAK
Deputy Pre-Stress Concrete 11/30/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/30/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/30/2020 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/30/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/1/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/1/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/1/2020 Approved NICK LAROCCA
Deputy Steel/Welding 12/1/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/1/2020 Partial Approval NICK LAROCCA
Pre-Inspection 12/1/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 12/2/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/2/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/2/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/2/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/2/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/2/2020 Partial Approval ALAN NOVAK
Pre-Inspection 12/2/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/3/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/3/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/3/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/3/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/3/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/3/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/3/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/3/2020 Partial Approval ALAN NOVAK
Pre-Inspection 12/3/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/4/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/4/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/4/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/4/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/4/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/4/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/4/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/4/2020 Partial Approval ALAN NOVAK
Pre-Inspection 12/4/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/7/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/7/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/7/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/7/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/7/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/7/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/7/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/7/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/7/2020 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/7/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/8/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/8/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/8/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/8/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/8/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/8/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/8/2020 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 12/8/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/9/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/9/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/9/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 12/9/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/9/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 12/9/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 12/10/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/10/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/10/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/10/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/10/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/10/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/10/2020 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/10/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/11/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/11/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/11/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/11/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/11/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/11/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/11/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/11/2020 Partial Approval NICK LAROCCA
Pre-Inspection 12/11/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 12/14/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/14/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/14/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/14/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/14/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/14/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/14/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/14/2020 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 12/14/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/15/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/15/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/15/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/15/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/15/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 12/15/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/15/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/15/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 12/15/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 12/15/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 12/16/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/16/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/16/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/16/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 12/16/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/16/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/16/2020 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/16/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/17/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/17/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/17/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/17/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/17/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/17/2020 Approved NICK LAROCCA
Deputy Steel/Welding 12/17/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/17/2020 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/17/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/18/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/18/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/18/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/18/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/18/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/18/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 12/18/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/18/2020 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 12/18/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/21/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/21/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/21/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/21/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/21/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/21/2020 Approved NICK LAROCCA
Deputy Steel/Welding 12/21/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/21/2020 Partial Approval NICK LAROCCA
Pre-Inspection 12/21/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 12/22/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/22/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/22/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/22/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/22/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/22/2020 Approved NICK LAROCCA
Deputy Steel/Welding 12/22/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/22/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 12/22/2020 Partial Inspection NICK LAROCCA
Pre-Inspection 12/22/2020 Approved ALAN NOVAK
Deputy Drilled-In Anchors 12/23/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/23/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/23/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/23/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 12/23/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/23/2020 Partial Approval ALAN NOVAK
Pre-Inspection 12/23/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/24/2020 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/24/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/24/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 12/24/2020 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/24/2020 Partial Approval ALAN NOVAK
Pre-Inspection 12/24/2020 Approved ALAN NOVAK
Excavation/Setback/Form/Re-Bar 12/28/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 12/28/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/29/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/29/2020 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 12/29/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/30/2020 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/30/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/30/2020 Approved NICK LAROCCA
Deputy Steel/Welding 12/30/2020 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 12/30/2020 Partial Approval NICK LAROCCA
Pre-Inspection 12/30/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/31/2020 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 12/31/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 12/31/2020 Approved JONATHAN ALLEN
Deputy Steel/Welding 12/31/2020 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 12/31/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 12/31/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 1/4/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 1/4/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 1/4/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/4/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 1/4/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/4/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/4/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/4/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 1/5/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/5/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/5/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 1/5/2021 Approved NICK LAROCCA
Deputy Steel/Welding 1/5/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 1/5/2021 Partial Approval NICK LAROCCA
Pre-Inspection 1/5/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 1/6/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 1/6/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 1/6/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/6/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/6/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/6/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 1/6/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/6/2021 Partial Approval ALAN NOVAK
Pre-Inspection 1/6/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 1/7/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/7/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/7/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 1/7/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/7/2021 Partial Approval ALAN NOVAK
Pre-Inspection 1/7/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/8/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/8/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/8/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 1/8/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/8/2021 Partial Approval NICK LAROCCA
Pre-Inspection 1/8/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 1/11/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/11/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/11/2021 Approved NICK LAROCCA
Deputy Steel/Welding 1/11/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/11/2021 Partial Approval NICK LAROCCA
Pre-Inspection 1/11/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 1/12/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/12/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/12/2021 Approved NICK LAROCCA
Deputy Steel/Welding 1/12/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/12/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/12/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 1/13/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/13/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/13/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 1/13/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 1/13/2021 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 1/13/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 1/14/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/14/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/14/2021 Approved NICK LAROCCA
Deputy Steel/Welding 1/14/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/14/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/14/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 1/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/15/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/15/2021 Approved NICK LAROCCA
Deputy Steel/Welding 1/15/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 1/15/2021 Partial Approval NICK LAROCCA
Pre-Inspection 1/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/19/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/19/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 1/19/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/19/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/19/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 1/20/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/20/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/20/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 1/20/2021 Approved NICK LAROCCA
Deputy Steel/Welding 1/20/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/20/2021 Partial Approval NICK LAROCCA
Pre-Inspection 1/20/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 1/21/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/21/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/21/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/21/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 1/21/2021 Approved NICK LAROCCA
Deputy Steel/Welding 1/21/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 1/21/2021 Partial Approval NICK LAROCCA
Pre-Inspection 1/21/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 1/22/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/22/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/22/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/22/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/22/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/22/2021 Partial Approval TED RIES
Pre-Inspection 1/22/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 1/25/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 1/25/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 1/25/2021 Approved DERRICK SPENCER
Deputy Steel/Welding 1/25/2021 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 1/25/2021 Partial Approval DERRICK SPENCER
Pre-Inspection 1/25/2021 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 1/26/2021 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 1/26/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/26/2021 Approved JEFF BYTHEWAY
Deputy Steel/Welding 1/26/2021 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 1/26/2021 Not Ready for Inspection JEFF BYTHEWAY
Pre-Inspection 1/26/2021 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 1/27/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/27/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/27/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/27/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 1/27/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/27/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 1/28/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/28/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 1/28/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/28/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/28/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 1/28/2021 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 1/28/2021 Partial Approval ALAN NOVAK
Pre-Inspection 1/28/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 1/29/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 1/29/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/29/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/29/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/29/2021 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 1/29/2021 Partial Inspection TED RIES
Pre-Inspection 1/29/2021 Partial Inspection TED RIES
Deputy Drilled-In Anchors 2/1/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/1/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/1/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/1/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/1/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/2/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/2/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/2/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/2/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/2/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/2/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/2/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 2/2/2021 Conditional Approval TED RIES
Pre-Inspection 2/2/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 2/3/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/3/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/3/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/3/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/3/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/3/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 2/3/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 2/3/2021 Partial Approval ALAN NOVAK
Pre-Inspection 2/3/2021 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 2/4/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/4/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/4/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/4/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/4/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/4/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/4/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 2/4/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 2/4/2021 Partial Approval ALAN NOVAK
Pre-Inspection 2/4/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/5/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/5/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/5/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/5/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/5/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/5/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/5/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 2/5/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/8/2021 Approved TED RIES
Deputy Drilled-In Anchors 2/8/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/8/2021 Approved TED RIES
Deputy Reinf. Concrete 2/8/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 2/8/2021 Approved TED RIES
Deputy Steel/Welding 2/8/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 2/8/2021 Partial Approval TED RIES
Pre-Inspection 2/8/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 2/9/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/9/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/9/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/9/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/9/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/9/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/9/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 2/9/2021 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 2/9/2021 Partial Inspection ALAN NOVAK
Pre-Inspection 2/9/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 2/10/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/10/2021 Approved TED RIES
Deputy Pre-Stress Concrete 2/10/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/10/2021 Approved TED RIES
Deputy Reinf. Concrete 2/10/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 2/10/2021 Approved TED RIES
Deputy Steel/Welding 2/10/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 2/10/2021 Partial Approval TED RIES
Pre-Inspection 2/10/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 2/11/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/11/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/11/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/11/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/11/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/11/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/11/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/11/2021 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 2/11/2021 Partial Approval TED RIES
Pre-Inspection 2/11/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 2/12/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/12/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/12/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/12/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/12/2021 Conditional Approval TED RIES
Masonry Wall/Backfill 2/12/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 2/16/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/16/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/16/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/16/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/16/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/16/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/16/2021 Approved TED RIES
Deputy Steel/Welding 2/16/2021 Conditional Approval TED RIES
Pre-Inspection 2/16/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 2/17/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/17/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/17/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 2/17/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 2/17/2021 Conditional Approval ALAN NOVAK
Pre-Inspection 2/17/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 2/18/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/18/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/18/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/18/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/18/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/18/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/18/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/18/2021 Conditional Approval ALAN NOVAK
Pre-Inspection 2/18/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 2/19/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 2/19/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 2/19/2021 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 2/19/2021 Approved JONATHAN ALLEN
Deputy Steel/Welding 2/19/2021 Approved JONATHAN ALLEN
Pre-Inspection 2/19/2021 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 2/22/2021 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 2/22/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 2/22/2021 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 2/22/2021 Approved JONATHAN ALLEN
Deputy Steel/Welding 2/22/2021 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 2/22/2021 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 2/22/2021 Partial Approval JONATHAN ALLEN
Green Building Rough 2/22/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 2/22/2021 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 2/22/2021 Not Ready for Inspection JONATHAN ALLEN
Deputy Drilled-In Anchors 2/23/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/23/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/23/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 2/23/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 2/23/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 2/23/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/24/2021 Approved TED RIES
Deputy Drilled-In Anchors 2/24/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/24/2021 Approved TED RIES
Deputy Pre-Stress Concrete 2/24/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/24/2021 Approved TED RIES
Deputy Reinf. Concrete 2/24/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 2/24/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 2/24/2021 Approved TED RIES
Excavation/Setback/Form/Re-Bar 2/24/2021 Partial Approval ALAN NOVAK
Piling/Pier/Caisson 2/24/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 2/25/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/25/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/25/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 2/25/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/25/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 2/25/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/25/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/25/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 2/26/2021 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 2/26/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/26/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/26/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/26/2021 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 2/26/2021 Partial Approval TED RIES
Pre-Inspection 2/26/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 3/1/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/1/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/1/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/1/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 3/1/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/1/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/1/2021 Partial Approval NICK LAROCCA
Pre-Inspection 3/1/2021 Approved ALAN NOVAK
Deputy Drilled-In Anchors 3/2/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/2/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/2/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/2/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/2/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/2/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/2/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/2/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/2/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/3/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/3/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/3/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/3/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/3/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/3/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 3/3/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/3/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 3/3/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 3/4/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/4/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/4/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/4/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/4/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/4/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 3/4/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/4/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/4/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/5/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/5/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/5/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/5/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/5/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 3/5/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/5/2021 Partial Approval ALAN NOVAK
Reinforced Masonry Frame 3/5/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/8/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/8/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/8/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/8/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/8/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/8/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/8/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/8/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 3/8/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/9/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/9/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/9/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/9/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/9/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/9/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/9/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/9/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 3/9/2021 Not Ready for Inspection ALAN NOVAK
Deputy Drilled-In Anchors 3/10/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/10/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/10/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/10/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/10/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/10/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/10/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 3/10/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/10/2021 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 3/10/2021 Not Ready for Inspection NICK LAROCCA
Verify Sprinkler Sign Off 3/10/2021 Approved ALAN NOVAK
Wood Frame 3/10/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 3/11/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/11/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/11/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/11/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/11/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/11/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 3/11/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/11/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 3/11/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/12/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/12/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/12/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/12/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/12/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/12/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 3/12/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/12/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 3/12/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/15/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/15/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/15/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/15/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/15/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/15/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 3/15/2021 Not Ready for Inspection ALAN NOVAK
Deputy Drilled-In Anchors 3/16/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/16/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/16/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/16/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/16/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/16/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/16/2021 Approved NICK LAROCCA
Drywall Nailing 3/16/2021 Partial Approval ALAN NOVAK
Footing/Foundation/Slab 3/16/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 3/16/2021 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 3/16/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 3/16/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 3/17/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/17/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/17/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/17/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/17/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/17/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/17/2021 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 3/17/2021 Partial Approval NICK LAROCCA
Wood Frame 3/17/2021 Not Ready for Inspection ALAN NOVAK
Deputy Drilled-In Anchors 3/18/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/18/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/18/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/18/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/18/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/18/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/18/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/18/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 3/18/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/19/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/19/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/19/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/19/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/19/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/19/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/19/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/19/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/19/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/22/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/22/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/22/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/22/2021 Approved NICK LAROCCA
Drywall Nailing 3/22/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/22/2021 Partial Approval NICK LAROCCA
Pre-Inspection 3/22/2021 Approved NICK LAROCCA
Wood Frame 3/22/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 3/23/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/23/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/23/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/23/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/23/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 3/23/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 3/23/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 3/24/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/24/2021 Approved JOEY BUCHANAN
Deputy Pre-Stress Concrete 3/24/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/24/2021 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 3/24/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 3/24/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/24/2021 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 3/24/2021 Not Ready for Inspection JOEY BUCHANAN
Reinforced Masonry Frame 3/24/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/25/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/25/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/25/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/25/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/25/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 3/25/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/25/2021 Approved NICK LAROCCA
Footing/Foundation/Slab 3/25/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 3/25/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/26/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/26/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/26/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 3/26/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/26/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/26/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 3/26/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 3/30/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/30/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/30/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/30/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/30/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/30/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 3/30/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 3/30/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 3/31/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 3/31/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 3/31/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/31/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 3/31/2021 Approved NICK LAROCCA
Deputy Steel/Welding 3/31/2021 Conditional Approval ALAN NOVAK
Reinforced Masonry Frame 3/31/2021 Partial Approval NICK LAROCCA
Wood Frame 3/31/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/1/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/1/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/1/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/1/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/1/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 4/1/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/1/2021 Partial Approval NICK LAROCCA
Wood Frame 4/1/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/5/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/5/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/5/2021 Approved NICK LAROCCA
Deputy Steel/Welding 4/5/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/5/2021 Partial Approval NICK LAROCCA
Wood Frame 4/5/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 4/6/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/6/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/6/2021 Approved NICK LAROCCA
Deputy Steel/Welding 4/6/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/6/2021 Partial Approval ALAN NOVAK
Reinforced Masonry Frame 4/6/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 4/7/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/7/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/7/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/7/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/7/2021 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 4/7/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/7/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 4/7/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 4/8/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/8/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 4/8/2021 Partial Approval NICK LAROCCA
Wood Frame 4/8/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/9/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/9/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/9/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/9/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/9/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/9/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 4/9/2021 Partial Approval ALAN NOVAK
Wood Frame 4/9/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/12/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/12/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/12/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/12/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/12/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/12/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/12/2021 Not Ready for Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/12/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/13/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/13/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 4/13/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/13/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/13/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/13/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 4/13/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/14/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/14/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/14/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/14/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/14/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/14/2021 Partial Approval ALAN NOVAK
Wood Frame 4/14/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 4/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/15/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/15/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/15/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/15/2021 Partial Approval NICK LAROCCA
Wood Frame 4/15/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/16/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/16/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/16/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 4/16/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 4/16/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/19/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/19/2021 Partial Approval ALAN NOVAK
Reinforced Masonry Frame 4/19/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 4/20/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/20/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/20/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/20/2021 Partial Approval NICK LAROCCA
Wood Frame 4/20/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/21/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/21/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 4/21/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/21/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/21/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/21/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/21/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/21/2021 Conditional Approval ALAN NOVAK
Wood Frame 4/21/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 4/22/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 4/22/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 4/22/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/22/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/22/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/22/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/22/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/22/2021 Partial Approval NICK LAROCCA
Wood Frame 4/22/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 4/23/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/23/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/23/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/23/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 4/23/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 4/26/2021 Approved NICK LAROCCA
Deputy Fireproofing 4/26/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/26/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/26/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/26/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 4/26/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/26/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 4/26/2021 Partial Approval NICK LAROCCA
Deputy Fireproofing 4/27/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/27/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/27/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/27/2021 Partial Approval NICK LAROCCA
Wood Frame 4/27/2021 Approved ALAN NOVAK
Deputy Fireproofing 4/28/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/28/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 4/28/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 4/28/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 4/28/2021 Partial Approval NICK LAROCCA
Deputy Fireproofing 4/29/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 4/29/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/29/2021 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 4/29/2021 Partial Approval NICK LAROCCA
Wood Frame 4/29/2021 Partial Approval ALAN NOVAK
Deputy Fireproofing 4/30/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 4/30/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 4/30/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/30/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 4/30/2021 Approved NICK LAROCCA
Deputy Fireproofing 5/3/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 5/3/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/3/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/3/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/3/2021 Partial Approval ALAN NOVAK
Wood Frame 5/3/2021 Partial Approval ALAN NOVAK
Deputy Fireproofing 5/4/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 5/4/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/4/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/4/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/4/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 5/4/2021 Partial Approval NICK LAROCCA
Deputy Fireproofing 5/5/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/5/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 5/5/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 5/5/2021 Partial Approval ALAN NOVAK
Deputy Fireproofing 5/6/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 5/6/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/6/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/6/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/6/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 5/6/2021 Partial Approval ALAN NOVAK
Deputy Fireproofing 5/7/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/7/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/7/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/7/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/7/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/7/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 5/10/2021 Conditional Approval ALAN NOVAK
Deputy Fireproofing 5/10/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 5/10/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/10/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/10/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 5/10/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 5/10/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/11/2021 Conditional Approval ALAN NOVAK
Deputy Fireproofing 5/11/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/11/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/11/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/11/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 5/11/2021 Partial Approval NICK LAROCCA
Wood Frame 5/11/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/12/2021 Conditional Approval ALAN NOVAK
Deputy Fireproofing 5/12/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/12/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/12/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/12/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 5/12/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 5/12/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/13/2021 Conditional Approval ALAN NOVAK
Deputy Fireproofing 5/13/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/13/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/13/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/13/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 5/13/2021 Partial Approval ALAN NOVAK
Reinforced Masonry Frame 5/13/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 5/14/2021 Conditional Approval ALAN NOVAK
Deputy Fireproofing 5/14/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/14/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/14/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/14/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 5/14/2021 Partial Approval NICK LAROCCA
Wood Frame 5/14/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/17/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/17/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/17/2021 Partial Approval ALAN NOVAK
Wood Frame 5/17/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/18/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/18/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/18/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/18/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 5/18/2021 Partial Approval ALAN NOVAK
Wood Frame 5/18/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/19/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 5/19/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/19/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/19/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 5/19/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 5/19/2021 Not Ready for Inspection NICK LAROCCA
Structural Steel Frame 5/19/2021 Not Ready for Inspection NICK LAROCCA
Wood Frame 5/19/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 5/20/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/20/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/20/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/20/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 5/20/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 5/21/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/21/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/21/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/21/2021 Approved NICK LAROCCA
Light Gage Steel Frame 5/21/2021 Partial Approval ALAN NOVAK
Reinforced Masonry Frame 5/21/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 5/24/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 5/24/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/24/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/24/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/25/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/25/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/25/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/25/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/26/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 5/26/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/26/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/26/2021 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/27/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/27/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/27/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/27/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 5/28/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 5/28/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 5/28/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 5/28/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/1/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/2/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 6/2/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/3/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 6/3/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/4/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/4/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/7/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 6/7/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/7/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/8/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/8/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/8/2021 Approved NICK LAROCCA
Reinforced Masonry Frame 6/8/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 6/9/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/9/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/9/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 6/9/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 6/10/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/10/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/10/2021 Approved NICK LAROCCA
Reinforced Masonry Frame 6/10/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 6/11/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/11/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/11/2021 Approved NICK LAROCCA
Reinforced Masonry Frame 6/11/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 6/14/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/14/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/14/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/14/2021 Approved NICK LAROCCA
Deputy Drilled-In Anchors 6/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/15/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/15/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/15/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 6/15/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 6/16/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/16/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 6/16/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/16/2021 Conditional Approval ALAN NOVAK
Footing/Foundation/Slab 6/16/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 6/16/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 6/17/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/17/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/17/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/17/2021 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 6/17/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 6/18/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 6/18/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/18/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/18/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 6/18/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 6/21/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/21/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/21/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/21/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 6/21/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 6/22/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 6/22/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 6/22/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/22/2021 Approved NICK LAROCCA
Light Gage Steel Frame 6/22/2021 Not Ready for Inspection ALAN NOVAK
Masonry Wall/Backfill 6/22/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 6/23/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/23/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/23/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 6/23/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 6/24/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/24/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/24/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/24/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 6/24/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 6/25/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 6/25/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 6/25/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 6/25/2021 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 6/25/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 6/28/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 6/28/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 6/28/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 6/28/2021 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 6/28/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 6/29/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/29/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/29/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/29/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 6/29/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 6/30/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 6/30/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 6/30/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 6/30/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 6/30/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 7/1/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/1/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/1/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/1/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/1/2021 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 7/2/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/2/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/2/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/2/2021 Approved NICK LAROCCA
Light Gage Steel Frame 7/2/2021 Partial Approval JONATHAN ALLEN
Masonry Wall/Backfill 7/2/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 7/6/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/6/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/6/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/6/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/7/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/7/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/7/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 7/8/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/8/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/8/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/8/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 7/9/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/9/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/9/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/9/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/12/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/12/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/12/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/12/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/13/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/13/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/13/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/13/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 7/14/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/14/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/14/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/14/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/15/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 7/15/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/15/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/15/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 7/15/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 7/15/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 7/16/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 7/16/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/16/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/16/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 7/16/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 7/16/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/19/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 7/19/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/19/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/19/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 7/19/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 7/19/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 7/20/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/20/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/20/2021 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 7/20/2021 Partial Approval ALAN NOVAK
Reinforced Masonry Frame 7/20/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/21/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/21/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 7/21/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/21/2021 Conditional Approval ALAN NOVAK
Masonry Wall/Backfill 7/21/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 7/21/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 7/22/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 7/22/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 7/22/2021 Approved NICK LAROCCA
Light Gage Steel Frame 7/22/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 7/22/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 7/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 7/23/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/23/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/26/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/27/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/27/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 7/27/2021 Partial Approval NICK LAROCCA
Masonry Wall/Backfill 7/27/2021 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 7/27/2021 Partial Approval ALAN NOVAK
Deputy Reinf. Masonry 7/28/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 7/28/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 7/28/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 7/28/2021 Not Ready for Inspection NICK LAROCCA
Deputy Reinf. Masonry 7/29/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 7/29/2021 Partial Approval NICK LAROCCA
Masonry Wall/Backfill 7/29/2021 Not Ready for Inspection NICK LAROCCA
Deputy Reinf. Masonry 7/30/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 7/30/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 7/30/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/2/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/2/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/2/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/2/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 8/2/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 8/2/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 8/3/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/3/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/3/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/3/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 8/3/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/3/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/4/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/4/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/4/2021 Approved NICK LAROCCA
Light Gage Steel Frame 8/4/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 8/4/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 8/5/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 8/5/2021 Approved NICK LAROCCA
Masonry Wall/Backfill 8/5/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/5/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/6/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/6/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/6/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/6/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 8/6/2021 Partial Approval NICK LAROCCA
Masonry Wall/Backfill 8/6/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 8/9/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/9/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/9/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/9/2021 Partial Approval NICK LAROCCA
T-Bar Ceiling 8/9/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 8/10/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/10/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/10/2021 Approved NICK LAROCCA
Light Gage Steel Frame 8/10/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/10/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/11/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/11/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/11/2021 Approved NICK LAROCCA
Footing/Foundation/Slab 8/11/2021 Off-Hour Fees Due
Footing/Foundation/Slab 8/11/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 8/11/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/11/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/12/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/12/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/12/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 8/12/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 8/12/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/13/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/13/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 8/13/2021 Approved NICK LAROCCA
Light Gage Steel Frame 8/13/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/13/2021 Partial Approval NICK LAROCCA
Deputy Reinf. Masonry 8/16/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/16/2021 Partial Approval NICK LAROCCA
Masonry Wall/Backfill 8/16/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 8/17/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/17/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/17/2021 Approved NICK LAROCCA
Light Gage Steel Frame 8/17/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/17/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/18/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/18/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 8/18/2021 Approved NICK LAROCCA
Light Gage Steel Frame 8/18/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/18/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/19/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/19/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 8/19/2021 Approved NICK LAROCCA
Light Gage Steel Frame 8/19/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 8/19/2021 Partial Approval ALAN NOVAK
Reinforced Masonry Frame 8/19/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/20/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 8/20/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 8/20/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/20/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 8/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/23/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/23/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/23/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 8/23/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 8/23/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/24/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/24/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/24/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/24/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/25/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/25/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/25/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 8/25/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 8/25/2021 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 8/25/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 8/25/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/25/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/26/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/26/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 8/26/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 8/26/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 8/26/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 8/26/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 8/26/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 8/27/2021 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/27/2021 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 8/27/2021 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/27/2021 Partial Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 8/27/2021 Partial Approval JONATHAN ALLEN
Light Gage Steel Frame 8/27/2021 Partial Approval JONATHAN ALLEN
Masonry Wall/Backfill 8/27/2021 Partial Approval JONATHAN ALLEN
Deputy Reinf. Masonry 8/30/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 8/30/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 8/30/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 8/30/2021 Partial Approval ALAN NOVAK
Masonry Wall/Backfill 8/30/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 8/31/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/31/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 8/31/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 8/31/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 8/31/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/1/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/1/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 9/1/2021 Approved NICK LAROCCA
Drywall Nailing 9/1/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/1/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 9/2/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/2/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 9/2/2021 Conditional Approval ALAN NOVAK
Drywall Nailing 9/2/2021 Not Ready for Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/2/2021 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/2/2021 Partial Approval ALAN NOVAK
Footing/Foundation/Slab 9/2/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 9/2/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 9/3/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/3/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 9/3/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/3/2021 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/3/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/3/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 9/3/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 9/7/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/7/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/7/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/7/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 9/7/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/8/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/8/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/8/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/8/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/8/2021 Partial Approval ALAN NOVAK
Footing/Foundation/Slab 9/8/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/8/2021 Not Ready for Inspection NICK LAROCCA
T-Bar Ceiling 9/8/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 9/9/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/9/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/9/2021 Approved NICK LAROCCA
Drywall Nailing 9/9/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 9/9/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 9/10/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/10/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 9/10/2021 Conditional Approval ALAN NOVAK
Light Gage Steel Frame 9/10/2021 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 9/10/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 9/13/2021 Conditional Approval ALAN NOVAK
Drywall Nailing 9/13/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/13/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/14/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/14/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/14/2021 Conditional Approval ALAN NOVAK
Drywall Nailing 9/14/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/14/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/15/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/15/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/15/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/15/2021 Partial Approval ALAN NOVAK
Floor/Roof Diaphrgm/Shear Wall 9/15/2021 Partial Approval ALAN NOVAK
Footing/Foundation/Slab 9/15/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/16/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/16/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/16/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/16/2021 Partial Approval ALAN NOVAK
Floor/Roof Diaphrgm/Shear Wall 9/16/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/16/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/17/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/17/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/17/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/17/2021 Partial Approval ALAN NOVAK
Floor/Roof Diaphrgm/Shear Wall 9/17/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/17/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/20/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/20/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/20/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/20/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/20/2021 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 9/20/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 9/20/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/21/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/21/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/21/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/21/2021 Partial Approval ALAN NOVAK
Floor/Roof Diaphrgm/Shear Wall 9/21/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/21/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/22/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/22/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/22/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/22/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/22/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/22/2021 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 9/23/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/23/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/23/2021 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/23/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 9/23/2021 Partial Approval ALAN NOVAK
Deputy Drilled-In Anchors 9/24/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 9/24/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/24/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/24/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/24/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 9/24/2021 Not Ready for Inspection NICK LAROCCA
Deputy Reinf. Masonry 9/27/2021 Approved NICK LAROCCA
Light Gage Steel Frame 9/27/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 9/28/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/28/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/28/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/28/2021 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/28/2021 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 9/28/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 9/28/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 9/29/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/29/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 9/29/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/29/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 9/29/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 9/29/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 9/30/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 9/30/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 9/30/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/30/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 9/30/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 9/30/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 10/1/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/1/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/1/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/1/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/1/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 10/1/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 10/4/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/4/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/4/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/4/2021 Partial Approval ALAN NOVAK
Floor/Roof Diaphrgm/Shear Wall 10/4/2021 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 10/4/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 10/4/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 10/5/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/5/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/5/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/5/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 10/5/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 10/6/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/6/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/6/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/6/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/6/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 10/6/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 10/7/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/7/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/7/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/7/2021 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 10/7/2021 Partial Approval ALAN NOVAK
Footing/Foundation/Slab 10/7/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 10/7/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 10/8/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/8/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/8/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/8/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 10/8/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 10/8/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 10/12/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/12/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/12/2021 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 10/12/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 10/12/2021 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 10/12/2021 Partial Approval JONATHAN ALLEN
Deputy Pre-Stress Concrete 10/13/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 10/13/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/13/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/13/2021 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 10/13/2021 Partial Approval ALAN NOVAK
Light Gage Steel Frame 10/13/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 10/14/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/14/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/14/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/14/2021 Partial Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 10/14/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 10/14/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 10/15/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/15/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/15/2021 Conditional Approval ALAN NOVAK
Drywall Nailing 10/15/2021 Not Ready for Inspection NICK LAROCCA
Deputy Pre-Stress Concrete 10/18/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 10/18/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/18/2021 Approved NICK LAROCCA
Light Gage Steel Frame 10/18/2021 Not Ready for Inspection NICK LAROCCA
Deputy Reinf. Masonry 10/19/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/19/2021 Partial Approval NICK LAROCCA
Deputy Reinf. Masonry 10/20/2021 Approved NICK LAROCCA
Light Gage Steel Frame 10/20/2021 Not Ready for Inspection NICK LAROCCA
Deputy Other (see comments) 10/21/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/21/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/21/2021 Partial Approval NICK LAROCCA
Light Gage Steel Frame 10/21/2021 Partial Approval ALAN NOVAK
Deputy Other (see comments) 10/22/2021 Approved NICK LAROCCA
Deputy Reinf. Masonry 10/22/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 10/22/2021 Partial Approval NICK LAROCCA
Deputy Other (see comments) 10/25/2021 Conditional Approval ALAN NOVAK
Deputy Other (see comments) 10/26/2021 Approved NICK LAROCCA
Deputy Other (see comments) 10/27/2021 Approved NICK LAROCCA
Deputy Other (see comments) 10/28/2021 Approved NICK LAROCCA
Deputy Other (see comments) 10/29/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/1/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/3/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/4/2021 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 11/4/2021 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 11/4/2021 Not Ready for Inspection NICK LAROCCA
Deputy Other (see comments) 11/5/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/8/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/8/2021 Conditional Approval ALAN NOVAK
Excavation/Setback/Form/Re-Bar 11/8/2021 Partial Approval ALAN NOVAK
Deputy Other (see comments) 11/9/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/10/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/12/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/15/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/16/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/16/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/16/2021 Approved NICK LAROCCA
Deputy Other (see comments) 11/17/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/17/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/17/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/17/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 11/18/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/18/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/19/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/19/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/19/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 11/22/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/22/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 11/23/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/23/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/23/2021 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 11/23/2021 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 11/23/2021 Partial Approval ALAN NOVAK
Deputy Pre-Stress Concrete 11/24/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 11/24/2021 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 11/24/2021 Partial Approval NICK LAROCCA
Deputy Pre-Stress Concrete 12/1/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/1/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/2/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/2/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/3/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/3/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/6/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/6/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/7/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/7/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/8/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/8/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/9/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/9/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/10/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 12/10/2021 Conditional Approval ALAN NOVAK
Deputy Pre-Stress Concrete 12/14/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/14/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/15/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/15/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/16/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/16/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/17/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/17/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/20/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/20/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/21/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/21/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/22/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/22/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 12/23/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 12/23/2021 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 12/27/2021 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/27/2021 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/12/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/12/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/13/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/13/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/14/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/14/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/24/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/24/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/25/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/25/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/26/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/26/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/27/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/27/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 1/28/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/28/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/8/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/8/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/9/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/9/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/10/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/10/2022 Approved NICK LAROCCA
Deputy Pre-Stress Concrete 3/11/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 3/11/2022 Approved NICK LAROCCA
Light Gage Steel Frame 6/6/2022 Approved NICK LAROCCA
Final 7/26/2022 Partial Inspection NICK LAROCCA
Footing/Foundation/Slab 7/26/2022 Approved NICK LAROCCA
Green Building Final 7/26/2022 Approved NICK LAROCCA
Reinforced Concrete Frame 7/26/2022 Approved NICK LAROCCA
SGSOV-Seismic Gas S/O Valve 7/26/2022 SGSOV Approved NICK LAROCCA
Smoke Detectors 7/26/2022 Approved NICK LAROCCA
Light Gage Steel Frame 7/28/2022 Partial Approval NICK LAROCCA
Final 8/2/2022 Partial Inspection NICK LAROCCA
Final 8/9/2022 Partial Approval NICK LAROCCA
Light Gage Steel Frame 8/11/2022 Approved NICK LAROCCA
Drywall Nailing 8/19/2022 Partial Approval NICK LAROCCA
Deputy Steel/Welding 11/29/2022 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 11/30/2022 Approved NICK LAROCCA
Deputy Steel/Welding 12/1/2022 Approved NICK LAROCCA
Deputy Steel/Welding 12/14/2022 Approved NICK LAROCCA
Deputy Steel/Welding 12/15/2022 Approved NICK LAROCCA
Deputy Steel/Welding 12/16/2022 Approved NICK LAROCCA
Deputy Steel/Welding 12/20/2022 Approved NICK LAROCCA
Special/Order Compliance 12/29/2023 Approved NICK LAROCCA
Special/Order Compliance 6/26/2024 Approved NICK LAROCCA
Special/Order Compliance 12/23/2024 Approved NICK LAROCCA
Special/Order Compliance 6/10/2025 Approved NICK LAROCCA
Special/Order Compliance 12/1/2025 Approved NICK LAROCCA
Special/Order Compliance 5/8/2026 Approved NICK LAROCCA