1441 W 5TH ST 90017

Certificate Information: 1441 W 5TH ST 90017

Application / Permit
19010-10000-01491
Plan Check / Job No.
B19LA07283
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 7 STORY 218 UNIT APARTMENT (4 STORY OF TYPE IIIA OVER 3-STORY OF ON-GRADE TYPE 1A) OVER 2 LEVELS OF TYPE 1A SUBTERANEAN PAKRING.
Permit Issued
Issued on 2/7/2023
Issuing Office
Metro
Current Status
Issued on 2/7/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/16/2019 APPLICANT
Assigned to Plan Check Engineer 5/9/2019 LARRY LEE
Corrections Issued 5/21/2019 LARRY LEE
Quality Review Completed 5/24/2019 CHARLES CHANG
Building Plans Picked Up 5/29/2019 APPLICANT
Applicant returned to address corrections 6/10/2019 LARRY LEE
Applicant returned to address corrections 9/30/2020 LARRY LEE
Applicant returned to address corrections 3/5/2021 LARRY LEE
Applicant returned to address corrections 3/26/2021 LARRY LEE
Applicant returned to address corrections 4/12/2021 LARRY LEE
Applicant returned to address corrections 10/14/2021 LARRY LEE
Applicant returned to address corrections 7/15/2022 LARRY LEE
Applicant returned to address corrections 9/20/2022 QUAN NGHIEM
Applicant returned to address corrections 9/29/2022 QUAN NGHIEM
Applicant returned to address corrections 10/4/2022 QUAN NGHIEM
Applicant returned to address corrections 10/5/2022 QUAN NGHIEM
Applicant returned to address corrections 10/6/2022 QUAN NGHIEM
Applicant returned to address corrections 10/14/2022 QUAN NGHIEM
Applicant returned to address corrections 2/1/2023 QUAN NGHIEM
Plan Check Approved 2/7/2023 QUAN NGHIEM
Issued 2/7/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 7/1/2019 ERIK BEASLEY
Highway dedication Cleared 11/16/2021 KHOUNG LE
Eng Process Fee Ord 176,300 Cleared 12/15/2021 WALLIE JONG
Sewer availability Cleared 1/18/2022 JEANIE LAM
Density Bonus 12.22.A.25 Cleared 2/10/2022 LOUIE MILLER
Work Adjacent to Public Way Cleared 5/16/2022 JOSE RODRIGUEZ
Specific Plan Cleared 6/21/2022 WESTON PRINGLE
Permit Cleared 6/28/2022 LINDA MARGARET
Roof/Waste drainage to street Cleared 6/28/2022 LINDA MARGARET
Trees in Parkway Cleared 7/8/2022 ADALBERTO VERA
Green Code Cleared 7/11/2022 AARON COSTA
Building over 3-story or 36-ft Cleared 7/21/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/22/2022 CALOSHA APPROVED
Hydrant and Access approval Cleared 8/1/2022 KURT CORRAL
Frnt yard landscape/Water mgmt Cleared 10/25/2022 RYAN LY
Low Impact Development Cleared 11/2/2022 MARTIN FRAGOSO
Fire Marshall Fire Life Safety Cleared 1/20/2023 MENOA AGHAJANI
DAS Clearance Cleared 1/24/2023 LARRY LEE
Miscellaneous Cleared 2/1/2023 RYAN LY
Miscellaneous Cleared 2/1/2023 RYAN LY
Opn space landscape/Water mgmt Cleared 2/1/2023 RYAN LY
Site Plan review Cleared 2/1/2023 RYAN LY
Specific Plan Cleared 2/1/2023 RYAN LY

Contact Information

Architect Clayton,, Charles Yancey; Lic. No.: C35502 3006 11TH AVENUE      LOS ANGELES, CA 90018
Contractor Fassberg Construction Company; Lic. No.: 470049-B 17000 VENTURA BLVD #200      ENCINO, CA 91316
Engineer Markulin,, John Andrew; Lic. No.: S4964 501 510 BURRARD ST      VANCOUVER BC, V6C 3A8

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/20/2023 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/20/2023 Partial Approval NICK DANERI
Footing/Foundation/Slab 6/20/2023 Partial Approval NICK DANERI
Green Building Rough 6/20/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 6/20/2023 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 6/20/2023 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 6/23/2023 Partial Approval NICK DANERI
Green Building Rough 6/23/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 6/23/2023 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 6/23/2023 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 6/27/2023 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 6/27/2023 Not Ready for Inspection NICK DANERI
Pre-Inspection 7/13/2023 Partial Approval NICK DANERI
Footing/Foundation/Slab 7/20/2023 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 7/27/2023 Partial Approval NICK DANERI
Green Building Rough 7/28/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 7/28/2023 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 7/28/2023 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 8/7/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/8/2023 Conditional Approval GREGORY POMISH
Green Building Rough 8/9/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 8/9/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 8/9/2023 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 8/10/2023 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/10/2023 Partial Approval NICK DANERI
Deputy Shotcrete 8/11/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/14/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/15/2023 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/15/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/23/2023 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/23/2023 Not Ready for Inspection NICK DANERI
Green Building Rough 8/24/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 8/24/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 8/24/2023 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 9/6/2023 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 9/6/2023 Partial Approval NICK DANERI
Deputy Shotcrete 9/8/2023 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/8/2023 Partial Approval NICK DANERI
Deputy Shotcrete 9/11/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 9/21/2023 Conditional Approval GREGORY POMISH
Green Building Rough 9/21/2023 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 9/21/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/21/2023 Not Ready for Inspection GREGORY POMISH
Green Building Rough 9/28/2023 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 9/28/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/28/2023 Not Ready for Inspection GREGORY POMISH
Green Building Rough 10/6/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 10/6/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 10/6/2023 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 10/10/2023 Conditional Approval NICK DANERI
Green Building Rough 10/12/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 10/12/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 10/12/2023 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 10/19/2023 Conditional Approval GREGORY POMISH
Green Building Rough 10/19/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 10/19/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/19/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/26/2023 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/26/2023 Partial Approval NICK DANERI
Footing/Foundation/Slab 10/26/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 10/31/2023 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/31/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 11/28/2023 Conditional Approval LARRY ARNICK
Green Building Rough 11/28/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/28/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/28/2023 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 11/30/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/7/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/7/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 12/7/2023 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 12/8/2023 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 12/13/2023 Partial Approval NICK DANERI
Deputy Shotcrete 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/20/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/20/2023 No Access for Inspection NICK DANERI
Verify Sprinkler Sign Off 12/20/2023 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 1/5/2024 Conditional Approval NICK DANERI
Green Building Rough 1/5/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 1/5/2024 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 1/5/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 1/8/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/17/2024 Conditional Approval NICK DANERI
Green Building Rough 1/17/2024 Partial Approval NICK DANERI
Reinforced Concrete Frame 1/17/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 1/17/2024 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 1/18/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/26/2024 Conditional Approval NICK DANERI
Special/Order Compliance 1/26/2024 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/30/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/31/2024 Conditional Approval NICK DANERI
Green Building Rough 1/31/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 1/31/2024 Partial Approval NICK DANERI
Special/Order Compliance 1/31/2024 Partial Inspection JEROME BLACKWOOD
Verify Sprinkler Sign Off 1/31/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 2/8/2024 Conditional Approval NICK DANERI
Green Building Rough 2/8/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/8/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 2/8/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 2/9/2024 Conditional Approval NICK DANERI
Footing/Foundation/Slab 2/9/2024 Partial Approval NICK DANERI
Deputy Other (see comments) 2/13/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/14/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/15/2024 Conditional Approval NICK DANERI
Green Building Rough 2/15/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/15/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 2/15/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 2/16/2024 Conditional Approval MICHAEL ROSENBERG
Reinforced Masonry Frame 2/17/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/21/2024 Conditional Approval MICHAEL ROSENBERG
Reinforced Masonry Frame 2/23/2024 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/26/2024 Conditional Approval JEFFREY FULTON
Green Building Rough 2/26/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 2/26/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 2/26/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 2/28/2024 Conditional Approval NICK DANERI
Reinforced Masonry Frame 2/28/2024 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/29/2024 Conditional Approval NICK DANERI
Structural Steel Frame 2/29/2024 Partial Approval NICK DANERI
Green Building Rough 3/5/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/5/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/5/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 3/11/2024 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/11/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 3/13/2024 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 3/21/2024 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 3/21/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/21/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/22/2024 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/26/2024 Conditional Approval MICHAEL ROSENBERG
Structural Steel Frame 3/29/2024 Partial Approval NICK DANERI
Green Building Rough 4/8/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 4/8/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/8/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 4/11/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/11/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/11/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/12/2024 Conditional Approval RAMAZANALI ALMASI
Reinforced Masonry Frame 4/12/2024 Not Ready for Inspection RAMAZANALI ALMASI
Footing/Foundation/Slab 4/15/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 4/17/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 4/17/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 4/17/2024 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 4/18/2024 Conditional Approval NICK DANERI
Structural Steel Frame 4/18/2024 Partial Approval NICK DANERI
Structural Steel Frame 4/19/2024 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/26/2024 Conditional Approval NICK DANERI
Wall Anchors 4/26/2024 Not Ready for Inspection NICK DANERI
Structural Steel Frame 4/29/2024 Partial Approval NICK DANERI
Green Building Rough 5/3/2024 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/3/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/3/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 5/14/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/14/2024 Conditional Approval NICK DANERI
Reinforced Masonry Frame 5/14/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/14/2024 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 5/16/2024 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/20/2024 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/20/2024 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/24/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/28/2024 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 5/28/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 5/28/2024 Conditional Approval NICK DANERI
Structural Steel Frame 5/31/2024 Partial Approval NICK DANERI
Structural Steel Frame 6/11/2024 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 6/12/2024 Conditional Approval NICK DANERI
Green Building Rough 6/12/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 6/12/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 6/12/2024 Partial Inspection NICK DANERI
Structural Steel Frame 6/14/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 6/20/2024 Partial Approval NICK DANERI
Structural Steel Frame 6/21/2024 Partial Approval NICK DANERI
Drywall Nailing 6/22/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/24/2024 Partial Approval NICK DANERI
Interior/Exterior Lathing 6/25/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/27/2024 Partial Approval RAMAZANALI ALMASI
Deputy Reinf. Concrete 7/2/2024 Conditional Approval NICK DANERI
Deputy Wood Construction 7/2/2024 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/2/2024 Partial Approval NICK DANERI
Drywall Nailing 7/3/2024 Partial Approval LARRY ARNICK
Insulation 7/5/2024 Partial Approval LUIS CCAMACHO
Drywall Nailing 7/9/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/9/2024 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/10/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 7/12/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 7/18/2024 Not Ready for Inspection LUIS CCAMACHO
Reinforced Masonry Frame 7/18/2024 Partial Approval LUIS CCAMACHO
Verify Sprinkler Sign Off 7/18/2024 Not Ready for Inspection LUIS CCAMACHO
Reinforced Concrete Frame 7/19/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/25/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/26/2024 Partial Approval LARRY ARNICK
Wood Frame 7/29/2024 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 8/5/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/5/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 8/6/2024 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/7/2024 Partial Approval NICK DANERI
Green Building Rough 8/7/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 8/7/2024 Partial Inspection NICK DANERI
Reinforced Masonry Frame 8/7/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 8/7/2024 Conditional Approval NICK DANERI
Deputy Wood Construction 8/9/2024 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/9/2024 Partial Approval NICK DANERI
Drywall Nailing 8/13/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/15/2024 Partial Approval NICK DANERI
Wood Frame 8/16/2024 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/19/2024 Partial Approval NICK DANERI
Deputy Wood Construction 8/20/2024 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 8/21/2024 Partial Approval NICK DANERI
Green Building Rough 8/21/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 8/21/2024 Conditional Approval NICK DANERI
Wood Frame 8/21/2024 Partial Approval NICK DANERI
Green Building Rough 8/27/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 8/27/2024 Partial Approval NICK DANERI
Reinforced Masonry Frame 8/27/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 8/27/2024 Not Ready for Inspection NICK DANERI
Wood Frame 8/27/2024 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/4/2024 Partial Approval LARRY ARNICK
Wood Frame 9/5/2024 Partial Approval NICK DANERI
Green Building Rough 9/10/2024 Not Ready for Inspection NICK DANERI
Insulation 9/10/2024 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 9/10/2024 Conditional Approval NICK DANERI
Wood Frame 9/10/2024 Partial Approval NICK DANERI
Wood Frame 9/17/2024 Partial Inspection NICK DANERI
Wood Frame 9/20/2024 Partial Approval TIMOTHY POWELL
Wood Frame 9/24/2024 Partial Approval NICK DANERI
Wood Frame 10/2/2024 Partial Approval NICK DANERI
Wood Frame 10/7/2024 Partial Approval RAFAEL CORTES
Wood Frame 10/15/2024 Partial Approval NICK DANERI
Wood Frame 10/29/2024 Partial Approval DAVID BURKHEAD
Wood Frame 10/31/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/6/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 11/8/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/12/2024 Partial Approval NICK DANERI
Drywall Nailing 11/20/2024 Partial Inspection NICK DANERI
Wood Frame 11/20/2024 Partial Approval NICK DANERI
Wood Frame 12/2/2024 Partial Approval EDWIN GREGORYONA
Insulation 12/4/2024 Partial Approval PAUL BAZERKANIAN
Insulation 12/5/2024 Partial Approval NICK DANERI
Insulation 12/11/2024 Corrections Issued NICK DANERI
Wood Frame 12/11/2024 Partial Approval NICK DANERI
Light Gage Steel Frame 12/16/2024 Partial Approval NICK DANERI
Wood Frame 12/16/2024 Partial Approval NICK DANERI
Wood Frame 12/23/2024 Partial Inspection NICK DANERI
Wood Frame 12/27/2024 Partial Approval NICK DANERI
Wood Frame 1/7/2025 Partial Approval NICK DANERI
Insulation 1/10/2025 Partial Approval NICK DANERI
Wood Frame 1/10/2025 Partial Approval NICK DANERI
Wood Frame 1/14/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 1/17/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 1/17/2025 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 1/24/2025 Partial Approval NICK DANERI
Wood Frame 1/24/2025 Partial Approval NICK DANERI
Drywall Nailing 1/29/2025 Partial Approval LARRY ARNICK
Insulation 1/29/2025 Partial Approval LARRY ARNICK
Insulation 2/6/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 2/7/2025 Partial Inspection NICK DANERI
Wood Frame 2/7/2025 Partial Inspection NICK DANERI
Drywall Nailing 2/10/2025 Not Ready for Inspection NICK DANERI
Wood Frame 2/10/2025 Partial Approval NICK DANERI
Drywall Nailing 2/13/2025 Partial Approval NICK DANERI
Drywall Nailing 2/20/2025 Partial Approval EDWIN GREGORYONA
Insulation 2/20/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/21/2025 Partial Approval EDWIN GREGORYONA
Insulation 2/21/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 2/21/2025 Partial Approval EDWIN GREGORYONA
Insulation 2/24/2025 Partial Approval NICK DANERI
Insulation 2/28/2025 Partial Approval NICK DANERI
Wood Frame 3/4/2025 Partial Approval NICK DANERI
Insulation 3/10/2025 Partial Inspection NICK DANERI
Wood Frame 3/10/2025 Partial Approval NICK DANERI
Insulation 3/12/2025 Partial Approval NICK DANERI
Insulation 3/14/2025 Partial Approval LARRY ARNICK
Insulation 3/17/2025 Not Ready for Inspection LARRY ARNICK
Insulation 3/18/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 3/20/2025 Partial Approval NICK DANERI
Wood Frame 3/24/2025 Partial Approval NICK DANERI
Drywall Nailing 3/27/2025 Partial Approval NICK DANERI
Insulation 3/27/2025 Partial Approval NICK DANERI
Wood Frame 3/27/2025 Partial Inspection NICK DANERI
Drywall Nailing 4/1/2025 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/1/2025 Partial Approval LARRY ARNICK
Insulation 4/1/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 4/1/2025 Partial Approval LARRY ARNICK
Drywall Nailing 4/2/2025 Not Ready for Inspection NICK DANERI
Insulation 4/2/2025 Partial Approval NICK DANERI
Wood Frame 4/2/2025 Partial Approval NICK DANERI
Drywall Nailing 4/4/2025 Partial Approval NICK DANERI
Insulation 4/4/2025 Partial Approval NICK DANERI
Insulation 4/9/2025 Partial Approval NICK DANERI
Drywall Nailing 4/15/2025 Partial Approval LARRY ARNICK
Insulation 4/15/2025 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 4/17/2025 Conditional Approval NICK DANERI
Drywall Nailing 4/17/2025 Partial Approval NICK DANERI
Insulation 4/17/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 4/18/2025 Not Ready for Inspection NICK DANERI
Drywall Nailing 4/24/2025 Partial Approval NICK DANERI
Drywall Nailing 4/28/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 4/28/2025 Partial Approval NICK DANERI
Structural Steel Frame 4/28/2025 Conditional Approval NICK DANERI
Interior/Exterior Lathing 4/30/2025 Not Ready for Inspection NICK DANERI
Interior/Exterior Lathing 5/1/2025 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 5/2/2025 Partial Approval LUIS CCAMACHO
Interior/Exterior Lathing 5/5/2025 Partial Approval NICK DANERI
Interior/Exterior Lathing 5/7/2025 Partial Inspection NICK DANERI
Special/Order Compliance 5/7/2025 Partial Approval NICK DANERI
Drywall Nailing 5/12/2025 Partial Approval NICK DANERI
Wood Frame 5/12/2025 Partial Inspection NICK DANERI
Drywall Nailing 5/13/2025 Partial Approval NICK DANERI
Wood Frame 5/16/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 5/20/2025 Not Ready for Inspection NICK DANERI
Wood Frame 5/21/2025 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 5/22/2025 Approved EDWIN GREGORYONA
Wood Frame 5/22/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/23/2025 Partial Approval LARRY ARNICK
Drywall Nailing 5/28/2025 Partial Approval NICK DANERI
Structural Steel Frame 5/29/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 5/29/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/2/2025 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 6/3/2025 Corrections Issued LARRY ARNICK
Insulation 6/6/2025 Partial Approval JOEY BUCHANAN
Insulation 6/9/2025 Corrections Issued JOEY BUCHANAN
Drywall Nailing 6/13/2025 Partial Approval JOEY BUCHANAN
Special/Order Compliance 6/23/2025 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/27/2025 Conditional Approval JOEY BUCHANAN
Light Gage Steel Frame 6/27/2025 Partial Approval JOEY BUCHANAN
Wood Frame 6/30/2025 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 7/2/2025 Partial Inspection LARRY ARNICK
Light Gage Steel Frame 7/7/2025 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 7/8/2025 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 7/9/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 7/14/2025 Partial Approval JOEY BUCHANAN
Wood Frame 7/17/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 7/22/2025 Partial Approval JOEY BUCHANAN
Wood Frame 7/24/2025 Not Ready for Inspection JOEY BUCHANAN
Interior/Exterior Lathing 7/28/2025 Not Ready for Inspection JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/29/2025 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 7/30/2025 Conditional Approval JOEY BUCHANAN
Interior/Exterior Lathing 7/30/2025 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 7/31/2025 Conditional Approval JOEY BUCHANAN
Wood Frame 8/1/2025 Partial Approval JOEY BUCHANAN
Wood Frame 8/4/2025 Partial Approval JOEY BUCHANAN
Wood Frame 8/5/2025 Not Ready for Inspection JOEY BUCHANAN
Drywall Nailing 8/6/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 8/12/2025 Partial Approval JOEY BUCHANAN
Insulation 8/12/2025 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 8/15/2025 Partial Approval JOEY BUCHANAN
Wood Frame 8/15/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 8/18/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 8/21/2025 Partial Approval JOEY BUCHANAN
Wood Frame 8/21/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 8/22/2025 Partial Inspection JOEY BUCHANAN
Interior/Exterior Lathing 8/22/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 8/25/2025 No Result Entered NICK DANERI
Drywall Nailing 8/26/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 8/27/2025 Partial Approval LARRY ARNICK
Drywall Nailing 8/28/2025 Partial Approval PAUL BAZERKANIAN
Green Building Rough 9/3/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 9/3/2025 Partial Approval LARRY ARNICK
Reinforced Masonry Frame 9/3/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/3/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 9/4/2025 Not Ready for Inspection LARRY ARNICK
Special/Order Compliance 9/4/2025 Conditional Approval LARRY ARNICK
Special/Order Compliance 9/8/2025 Approved JOEY BUCHANAN
Reinforced Concrete Frame 9/10/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 9/15/2025 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 9/15/2025 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 9/17/2025 Partial Approval JOEY BUCHANAN
Masonry Wall/Backfill 9/17/2025 Not Ready for Inspection JOEY BUCHANAN
Green Building Rough 9/18/2025 Approved JOEY BUCHANAN
Reinforced Masonry Frame 9/18/2025 Partial Approval JOEY BUCHANAN
Verify Sprinkler Sign Off 9/18/2025 Approved JOEY BUCHANAN
Drywall Nailing 9/22/2025 Partial Approval JOEY BUCHANAN
Reinforced Masonry Frame 9/24/2025 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 9/25/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 9/26/2025 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 9/26/2025 Partial Approval JOEY BUCHANAN
Wood Frame 10/1/2025 Not Ready for Inspection JOEY BUCHANAN
Interior/Exterior Lathing 10/3/2025 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 10/10/2025 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 10/14/2025 Approved JOEY BUCHANAN
Interior/Exterior Lathing 10/14/2025 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 10/17/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 10/20/2025 No Result Entered NICK DANERI
Drywall Nailing 10/22/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 10/24/2025 Partial Approval JOEY BUCHANAN
Wood Frame 10/28/2025 Partial Approval JOEY BUCHANAN
Wood Frame 10/31/2025 Not Ready for Inspection JOEY BUCHANAN
Drywall Nailing 11/10/2025 Partial Approval JOEY BUCHANAN
Insulation 11/13/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 11/24/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 11/25/2025 No Result Entered NICK DANERI
Excavation/Setback/Form/Re-Bar 12/1/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 12/11/2025 No Result Entered NICK DANERI
Masonry Wall/Backfill 12/11/2025 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 12/18/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 12/23/2025 No Result Entered NICK DANERI
Masonry Wall/Backfill 1/8/2026 Conditional Approval JOEY BUCHANAN
Reinforced Masonry Frame 1/8/2026 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 1/23/2026 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 1/23/2026 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/26/2026 Partial Approval JOEY BUCHANAN
Special/Order Compliance 1/26/2026 Approved JOEY BUCHANAN
Footing/Foundation/Slab 2/10/2026 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 2/18/2026 Partial Approval JOEY BUCHANAN
Special/Order Compliance 2/18/2026 Approved JOEY BUCHANAN
Special/Order Compliance 2/19/2026 Not Ready for Inspection JOEY BUCHANAN
Insulation 2/20/2026 Partial Approval JOEY BUCHANAN
Final 2/23/2026 Corrections Issued JOEY BUCHANAN
Footing/Foundation/Slab 2/23/2026 Approved JOEY BUCHANAN
Green Building Final 2/23/2026 Not Ready for Inspection JOEY BUCHANAN
Reinforced Concrete Frame 2/23/2026 Approved JOEY BUCHANAN
Reinforced Masonry Frame 2/23/2026 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 2/23/2026 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 2/23/2026 Approved JOEY BUCHANAN
Special/Order Compliance 3/3/2026 Approved JOEY BUCHANAN
Drywall Nailing 3/5/2026 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 3/16/2026 Partial Approval ALFREDO LOPEZ
Floor/Roof Diaphrgm/Shear Wall 3/27/2026 Not Ready for Inspection JOEY BUCHANAN
Wood Frame 3/27/2026 Not Ready for Inspection JOEY BUCHANAN
Wood Frame 3/31/2026 Partial Approval JOEY BUCHANAN
Floor/Roof Diaphrgm/Shear Wall 4/6/2026 Partial Approval PAUL BAZERKANIAN
Wood Frame 4/6/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 4/8/2026 Partial Approval JOEY BUCHANAN
Final 4/17/2026 Not Ready for Inspection JOEY BUCHANAN
Green Building Final 4/17/2026 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 4/21/2026 Partial Approval JOEY BUCHANAN
Drywall Nailing 4/23/2026 Approved JOEY BUCHANAN
Interior/Exterior Lathing 4/27/2026 Not Ready for Inspection JOEY BUCHANAN
Interior/Exterior Lathing 4/29/2026 Partial Approval RONALD JIMENEZ
Excavation/Setback/Form/Re-Bar 5/1/2026 Approved JOEY BUCHANAN
Special/Order Compliance 5/6/2026 Approved JOEY BUCHANAN
Special/Order Compliance 5/20/2026 Not Ready for Inspection JOEY BUCHANAN
Special/Order Compliance 5/28/2026 Not Ready for Inspection JOEY BUCHANAN
Final 5/29/2026 Corrections Issued JOEY BUCHANAN
Special/Order Compliance 6/3/2026 Approved JOEY BUCHANAN