Deputy Reinf. Concrete
|
3/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Other (see comments)
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
6/20/2023
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
6/20/2023
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
6/20/2023
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
6/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
6/20/2023
|
Partial Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
6/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
6/23/2023
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
6/23/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
6/23/2023
|
Partial Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
6/23/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
6/27/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
6/27/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Pre-Inspection
|
7/13/2023
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
7/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/27/2023
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
7/28/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
7/28/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
7/28/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Shotcrete
|
8/7/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/8/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
8/9/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
8/9/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/9/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Shotcrete
|
8/10/2023
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
8/10/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
8/11/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/14/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/15/2023
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
8/15/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/23/2023
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
8/23/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
8/24/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
8/24/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/24/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/6/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
9/6/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
9/8/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
9/8/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
9/11/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
9/21/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
9/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/21/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
9/28/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
9/28/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/28/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
10/6/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
10/6/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
10/6/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/10/2023
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
10/12/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
10/12/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
10/12/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/19/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
10/19/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/19/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
10/19/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/26/2023
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
10/26/2023
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/26/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/31/2023
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
11/28/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
11/28/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
11/28/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Shotcrete
|
11/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
12/7/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
12/7/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/7/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Special/Order Compliance
|
12/13/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
12/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
12/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
12/20/2023
|
No Access for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/20/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/5/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
1/5/2024
|
Partial Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
1/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/8/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/17/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/17/2024
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
1/17/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
1/17/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Shotcrete
|
1/18/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/26/2024
|
Conditional Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
1/26/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/30/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
1/31/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/31/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
1/31/2024
|
Partial Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
1/31/2024
|
Partial Inspection
|
JEROME BLACKWOOD
|
|
Verify Sprinkler Sign Off
|
1/31/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/8/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
2/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/9/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
2/9/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Other (see comments)
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
2/15/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
2/15/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/15/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/15/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Reinforced Masonry Frame
|
2/17/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Reinforced Masonry Frame
|
2/23/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/26/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Green Building Rough
|
2/26/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
2/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
2/26/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
2/28/2024
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
2/28/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/29/2024
|
Conditional Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
2/29/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
3/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
3/11/2024
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
3/11/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
3/11/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Shotcrete
|
3/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
3/21/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
3/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/21/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Structural Steel Frame
|
3/29/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
4/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/8/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
4/11/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/11/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/11/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/12/2024
|
Conditional Approval
|
RAMAZANALI ALMASI
|
|
Reinforced Masonry Frame
|
4/12/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Footing/Foundation/Slab
|
4/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/17/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/17/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/17/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/18/2024
|
Conditional Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
4/18/2024
|
Partial Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
4/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/26/2024
|
Conditional Approval
|
NICK DANERI
|
|
Wall Anchors
|
4/26/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Structural Steel Frame
|
4/29/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
5/3/2024
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/3/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/3/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
5/14/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/14/2024
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
5/14/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/14/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
5/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/20/2024
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/20/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/24/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
5/28/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
5/28/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/28/2024
|
Conditional Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
5/31/2024
|
Partial Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
6/11/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Shotcrete
|
6/12/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
6/12/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
6/12/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
6/12/2024
|
Partial Inspection
|
NICK DANERI
|
|
Structural Steel Frame
|
6/14/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
6/20/2024
|
Partial Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
6/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
6/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2024
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
6/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Deputy Reinf. Concrete
|
7/2/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
7/2/2024
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
7/3/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/5/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
7/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/12/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
7/18/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Reinforced Masonry Frame
|
7/18/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Verify Sprinkler Sign Off
|
7/18/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Reinforced Concrete Frame
|
7/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
7/29/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
8/5/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
8/6/2024
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
8/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
8/7/2024
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
8/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/7/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
8/9/2024
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
8/13/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/15/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
8/16/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
8/20/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
8/21/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/21/2024
|
Conditional Approval
|
NICK DANERI
|
|
Wood Frame
|
8/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
8/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
8/27/2024
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
8/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
8/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
9/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
9/10/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
9/10/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
9/10/2024
|
Conditional Approval
|
NICK DANERI
|
|
Wood Frame
|
9/10/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
9/17/2024
|
Partial Inspection
|
NICK DANERI
|
|
Wood Frame
|
9/20/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Wood Frame
|
9/24/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
10/2/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
10/7/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
10/15/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
10/29/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
10/31/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/6/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
11/8/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
11/12/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
11/20/2024
|
Partial Inspection
|
NICK DANERI
|
|
Wood Frame
|
11/20/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
12/2/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
12/4/2024
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Insulation
|
12/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
12/11/2024
|
Corrections Issued
|
NICK DANERI
|
|
Wood Frame
|
12/11/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
12/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
12/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
12/23/2024
|
Partial Inspection
|
NICK DANERI
|
|
Wood Frame
|
12/27/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
1/7/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
1/10/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
1/10/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
1/14/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
1/17/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/17/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
1/24/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
1/24/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
1/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
2/6/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
2/7/2025
|
Partial Inspection
|
NICK DANERI
|
|
Wood Frame
|
2/7/2025
|
Partial Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
2/10/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
2/10/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/13/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/20/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/20/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/21/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/21/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
2/21/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/24/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/28/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
3/4/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/10/2025
|
Partial Inspection
|
NICK DANERI
|
|
Wood Frame
|
3/10/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/12/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/14/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
3/17/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
3/18/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
3/20/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
3/24/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
3/27/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/27/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
3/27/2025
|
Partial Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
4/1/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
4/1/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
4/1/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
4/2/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
4/2/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
4/2/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/4/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
4/4/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
4/9/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/15/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
4/15/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
4/17/2025
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/17/2025
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
4/17/2025
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
4/18/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
4/24/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/28/2025
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
4/28/2025
|
Partial Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
4/28/2025
|
Conditional Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
4/30/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
5/1/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/2/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Interior/Exterior Lathing
|
5/5/2025
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
5/7/2025
|
Partial Inspection
|
NICK DANERI
|
|
Special/Order Compliance
|
5/7/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
5/12/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
5/12/2025
|
Partial Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
5/13/2025
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
5/16/2025
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Drywall Nailing
|
5/20/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
5/21/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
5/22/2025
|
Approved
|
EDWIN GREGORYONA
|
|
Wood Frame
|
5/22/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/23/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/28/2025
|
Partial Approval
|
NICK DANERI
|
|
Structural Steel Frame
|
5/29/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
5/29/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
6/3/2025
|
Corrections Issued
|
LARRY ARNICK
|
|
Insulation
|
6/6/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
6/9/2025
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
6/13/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
6/23/2025
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/27/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
6/27/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
6/30/2025
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/2/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/7/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
7/8/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
7/9/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
7/14/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
7/17/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
7/22/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
7/24/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
7/28/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
7/30/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
7/30/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
7/31/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/1/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/4/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/5/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
8/6/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
8/12/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
8/12/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/15/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
8/18/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
8/21/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
8/21/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
8/22/2025
|
Partial Inspection
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
8/22/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
8/25/2025
|
No Result Entered
|
NICK DANERI
|
|
Drywall Nailing
|
8/26/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/27/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/28/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Green Building Rough
|
9/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
9/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
9/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
9/4/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
9/4/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
9/8/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
9/10/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
9/15/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
9/15/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
9/17/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Masonry Wall/Backfill
|
9/17/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Green Building Rough
|
9/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
9/18/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
9/18/2025
|
Approved
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
9/22/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
9/24/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
9/25/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
9/26/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
9/26/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
10/1/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
10/3/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Light Gage Steel Frame
|
10/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
10/14/2025
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
10/14/2025
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/17/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
10/20/2025
|
No Result Entered
|
NICK DANERI
|
|
Drywall Nailing
|
10/22/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
10/24/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
10/28/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Wood Frame
|
10/31/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
11/10/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
11/13/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
11/24/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
11/25/2025
|
No Result Entered
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
12/1/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/11/2025
|
No Result Entered
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
12/11/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
12/18/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/23/2025
|
No Result Entered
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
1/8/2026
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
1/8/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/23/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Masonry Wall/Backfill
|
1/23/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
1/26/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
1/26/2026
|
Approved
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
2/10/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/18/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
2/18/2026
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
2/19/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Insulation
|
2/20/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Final
|
2/23/2026
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
2/23/2026
|
Approved
|
JOEY BUCHANAN
|
|
Green Building Final
|
2/23/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
2/23/2026
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
2/23/2026
|
Approved
|
JOEY BUCHANAN
|
|
SGSOV-Seismic Gas S/O Valve
|
2/23/2026
|
SGSOV Approved
|
JOEY BUCHANAN
|
|
Smoke Detectors
|
2/23/2026
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
3/3/2026
|
Approved
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
3/5/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/16/2026
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/27/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Wood Frame
|
3/27/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Wood Frame
|
3/31/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/6/2026
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Wood Frame
|
4/6/2026
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
4/8/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Final
|
4/17/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Green Building Final
|
4/17/2026
|
Approved
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/21/2026
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
4/23/2026
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
4/27/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
4/29/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
5/1/2026
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
5/6/2026
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
5/20/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
5/28/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Final
|
5/29/2026
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
6/3/2026
|
Approved
|
JOEY BUCHANAN
|