4800 E VALLEY BLVD 90032

Certificate Information: 4800 E VALLEY BLVD 90032

Application / Permit
19010-10000-01320
Plan Check / Job No.
B19LA06503
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(22) Storage Building
Work Description
ePlan Supplmental. New 3-story type IIB fully sprinklered storage building per ZA 2018-3114-ZV-SPR
Permit Issued
Issued on 12/10/2019
Issuing Office
Metro
Current Status
CofO Issued on 12/2/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/1/2019 APPLICANT
Green Plans Picked Up 4/10/2019 APPLICANT
Disabled Access Plans Picked Up 4/11/2019 APPLICANT
Assigned to Plan Check Engineer 4/18/2019 TU HUA
Corrections Issued 5/20/2019 TU HUA
Quality Review Completed 5/24/2019 MINYE PAK
Building Plans Picked Up 5/28/2019 APPLICANT
Applicant returned to address corrections 6/26/2019 TU HUA
Applicant returned to address corrections 7/31/2019 TU HUA
Applicant returned to address corrections 8/8/2019 TU HUA
Applicant returned to address corrections 8/28/2019 TU HUA
Applicant returned to address corrections 9/11/2019 TU HUA
Applicant returned to address corrections 9/12/2019 TU HUA
Applicant returned to address corrections 11/13/2019 TU HUA
Plan Check Approved 11/27/2019 TU HUA
Issued 12/10/2019 LADBS
CofO in Progress 11/29/2021 ERNESTO CORRAL
CofO Issued 12/2/2021 TERRY HERR
Permit Finaled 12/2/2021 TERRY HERR

Permit Application Clearance Information

Address approval Cleared 5/30/2019 ELAINE LEI
Permit Cleared 5/30/2019 ELAINE LEI
Project located in CRA area Cleared 5/30/2019 JIM URQUHART
Driveway location Cleared 6/3/2019 COLLINS ALLAN
Driveway location Cleared 6/3/2019 COLLINS ALLAN
Eng Process Fee Ord 176,300 Cleared 6/5/2019 ERIK BEASLEY
Highway dedication Cleared 6/5/2019 ERIK BEASLEY
Trees in Parkway Cleared 6/5/2019 ADRIAN SANCHEZ
Hydrant and Access approval Cleared 6/11/2019 GILBERT URREA
Sewer availability Cleared 6/24/2019 JAMES MORALEZ
Work Adjacent to Public Way Cleared 9/18/2019 CHIU TAM
Green Code Cleared 9/24/2019 NEGAR NEJAD
Low Impact Development Cleared 10/2/2019 MARTIN FRAGOSO
DAS Clearance Cleared 10/24/2019 SHINE LIN
Frnt yard landscape/Water mgmt Cleared 11/12/2019 JOE LUCKEY
Prkng lot landscape/Water mgmt Cleared 11/12/2019 JOE LUCKEY
Site Plan review Cleared 11/12/2019 JOE LUCKEY
ZA Case Cleared 11/12/2019 JOE LUCKEY
Building over 3-story or 36-ft Cleared 11/13/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/13/2019 CALOSHA APPROVED
GPI Written Notices Cleared 11/13/2019 TU HUA
Grading Pre-Inspection Cleared 11/13/2019 TU HUA
Roof/Waste drainage to street Cleared 11/26/2019 ARMEN MEHRABIAN

Contact Information

Architect Vakili,, Shabnam; Lic. No.: C26298 KSP STUDIO   23 ORCHARD STE 200    LAKE FOREST, CA 92630
Contractor Damato Associates Inc; Lic. No.: 861151-B 15 HAMMOND SUITE 307      IRVINE, CA 92618
Engineer Shakerin,, Kayvon; Lic. No.: C46202 23 ORCHARD ROAD      LAKE FOREST, CA 92630

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/8/2020 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 1/27/2020 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 2/24/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 3/2/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/15/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 4/16/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 4/27/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 5/4/2020 No Access for Inspection DANIEL COLLINS
Reinforced Concrete Frame 5/5/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 5/11/2020 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/11/2020 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 5/11/2020 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/11/2020 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 5/18/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 5/19/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 5/20/2020 Partial Approval DANIEL COLLINS
Green Building Rough 6/9/2020 Approved DANIEL COLLINS
Reinforced Masonry Frame 6/9/2020 Partial Approval DANIEL COLLINS
Verify Sprinkler Sign Off 6/9/2020 Not Ready for Inspection DANIEL COLLINS
Deputy Reinf. Masonry 6/11/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/12/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/15/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 6/15/2020 Partial Approval DANIEL COLLINS
Verify Sprinkler Sign Off 6/15/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/16/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/17/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 6/19/2020 Partial Approval DANIEL COLLINS
Verify Sprinkler Sign Off 6/19/2020 Approved DANIEL COLLINS
Reinforced Masonry Frame 6/22/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 6/24/2020 Partial Approval NICK DANERI
Deputy Reinf. Masonry 6/25/2020 Conditional Approval NICK DANERI
Reinforced Concrete Frame 6/25/2020 Partial Approval NICK DANERI
Deputy Reinf. Masonry 6/26/2020 Conditional Approval RONALD PACHECO
Deputy Reinf. Masonry 6/29/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 6/29/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/30/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/1/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/2/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 7/7/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/7/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 7/7/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/8/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/8/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 7/8/2020 Not Ready for Inspection DANIEL COLLINS
Deputy Reinf. Masonry 7/9/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/9/2020 Conditional Approval DANIEL COLLINS
Masonry Wall/Backfill 7/9/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/10/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/10/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 7/10/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/13/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/13/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 7/14/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/15/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 7/16/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/17/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 7/17/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/20/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/21/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 7/22/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 7/22/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/23/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/24/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 7/24/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/27/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 7/28/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/29/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 7/29/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/29/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/30/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 7/30/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/30/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/31/2020 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Masonry 7/31/2020 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 7/31/2020 Conditional Approval TIMOTHY BUXTON
Reinforced Masonry Frame 7/31/2020 Partial Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 8/3/2020 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Masonry 8/3/2020 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 8/3/2020 Conditional Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 8/4/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 8/4/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/4/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 8/4/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 8/7/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 8/14/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/18/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/18/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/19/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/19/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/20/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/20/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/21/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/21/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/24/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/24/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 8/28/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 8/28/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 9/1/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 9/2/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 9/16/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/16/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 9/17/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/17/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 9/18/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/18/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 9/21/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/21/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 9/22/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/22/2020 Conditional Approval NICK DANERI
Light Gage Steel Frame 9/29/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 9/29/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/30/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 10/8/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 10/9/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 10/19/2020 Partial Approval LANNY MERRICK
Deputy Reinf. Masonry 10/20/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Masonry 10/21/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Masonry 10/22/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 10/22/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 10/22/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 10/23/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 10/26/2020 Conditional Approval DANIEL COLLINS
Reinforced Masonry Frame 10/27/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 10/29/2020 Partial Approval LANNY MERRICK
Reinforced Masonry Frame 11/2/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 11/10/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 11/10/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 11/13/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 11/19/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 11/23/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 1/21/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 2/16/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 2/16/2021 Partial Approval DANIEL COLLINS
Insulation 2/18/2021 Partial Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 2/22/2021 Approved DANIEL COLLINS
Reinforced Concrete Frame 2/23/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 4/8/2021 Approved DANIEL COLLINS
Light Gage Steel Frame 4/8/2021 Approved DANIEL COLLINS
Footing/Foundation/Slab 6/1/2021 Partial Inspection DANIEL COLLINS
Reinforced Concrete Frame 6/1/2021 Partial Inspection DANIEL COLLINS
Pre-Inspection 6/3/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 6/3/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 6/24/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 7/15/2021 Approved DANIEL COLLINS
Pre-Inspection 9/10/2021 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 10/6/2021 Approved DANIEL COLLINS
T-Bar Ceiling 10/6/2021 Approved DANIEL COLLINS
Reinforced Masonry Frame 10/13/2021 Approved DANIEL COLLINS
Reinforced Concrete Frame 10/20/2021 Approved DANIEL COLLINS
Deputy Other (see comments) 10/22/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/22/2021 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 10/22/2021 Approved DANIEL COLLINS
Deputy Other (see comments) 10/26/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 10/26/2021 Conditional Approval DANIEL COLLINS
Final 11/16/2021 Conditional Approval DANIEL COLLINS
Green Building Final 11/16/2021 Approved DANIEL COLLINS
SGSOV-Seismic Gas S/O Valve 11/16/2021 SGSOV Approved DANIEL COLLINS
Smoke Detectors 11/16/2021 Approved DANIEL COLLINS
Structural Steel Frame 11/16/2021 Approved DANIEL COLLINS
Final 11/17/2021 Partial Inspection DANIEL COLLINS
Final 11/18/2021 Partial Inspection DANIEL COLLINS
Final 11/23/2021 Not Ready for Inspection SORIN CIRSTOIU