1260 S FIGUEROA ST 90015

Certificate Information: 1260 S FIGUEROA ST 90015

Application / Permit
19010-10000-01188
Plan Check / Job No.
B19LA05793
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
PROPOSED 38-STORY HOTEL, RESTAURANT/AMENITY SPACE (APPROVED AS CORE AND SHELL) WITH REQUIRED PARKING GARAGE. STAIRS, GUARDRAILS AND CURTAIN WALL SYSTEMS (INCLUDING FIRE STOP DETAIL), POOLS, TENANT IMPROVEMENTS ARE DEFERRED.
Permit Issued
Issued on 8/4/2020
Issuing Office
Metro
Current Status
CofO Corrected on 4/15/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/3/2019 APPLICANT
Assigned to Plan Check Engineer 4/25/2019 JOHN VASQUEZ
Corrections Issued 5/21/2019 JOHN VASQUEZ
Quality Review Completed 5/24/2019 CHARLES CHANG
Building Plans Picked Up 5/28/2019 APPLICANT
Applicant returned to address corrections 7/22/2019 JOHN VASQUEZ
Applicant returned to address corrections 7/29/2019 JOHN VASQUEZ
Applicant returned to address corrections 8/6/2019 JOHN VASQUEZ
Applicant returned to address corrections 8/14/2019 JOHN VASQUEZ
Applicant returned to address corrections 8/28/2019 JOHN VASQUEZ
Applicant returned to address corrections 9/4/2019 JOHN VASQUEZ
Applicant returned to address corrections 10/1/2019 JOHN VASQUEZ
Applicant returned to address corrections 10/18/2019 JOHN VASQUEZ
Applicant returned to address corrections 12/9/2019 JOHN VASQUEZ
Applicant returned to address corrections 12/13/2019 JOHN VASQUEZ
Applicant returned to address corrections 1/6/2020 JOHN VASQUEZ
Applicant returned to address corrections 1/14/2020 JOHN VASQUEZ
Applicant returned to address corrections 2/5/2020 JOHN VASQUEZ
Applicant returned to address corrections 2/12/2020 JOHN VASQUEZ
Applicant returned to address corrections 2/28/2020 JOHN VASQUEZ
Applicant returned to address corrections 3/6/2020 JOHN VASQUEZ
Applicant returned to address corrections 6/30/2020 JOHN VASQUEZ
Applicant returned to address corrections 7/6/2020 JOHN VASQUEZ
Plan Check Approved 8/4/2020 ERWIN PASCUA
Issued 8/4/2020 APPLICANT
Permit Closed-Status Void 11/10/2021 JAMES POWERS
Re-Activate Permit 11/12/2021 JAMES POWERS
TCO Issued (Expire Date: 09-20-2023) 3/24/2023 ERNESTO CORRAL
TCO Issued (Expire Date: 03-17-2024) 9/19/2023 ERNESTO CORRAL
CofO Issued-Status Void 3/20/2024 ADAM BURGESS
Permit Finaled-Status Void 3/20/2024 ADAM BURGESS
Re-Activate Permit 4/11/2024 ADAM BURGESS
Permit Finaled 4/15/2024 ADAM BURGESS
CofO Corrected 4/15/2024 ADAM BURGESS
Permit Finaled 4/15/2024 ADAM BURGESS

Permit Application Clearance Information

City owned building/parcel Cleared 7/22/2019 HAROOT AVANESIAN
City owned building/parcel Cleared 7/22/2019 HAROOT AVANESIAN
Abandoned oil well Cleared 7/30/2019 GEORGE SUCHAND
Abandoned oil well approval Cleared 7/30/2019 GEORGE SUCHAND
Address approval Cleared 8/1/2019 JEANIE LAM
Driveway location Cleared 8/19/2019 WESTON PRINGLE
Driveway location Cleared 8/19/2019 WESTON PRINGLE
Trees in Parkway Cleared 8/20/2019 STEPHEN DUPREY
Low Impact Development Cleared 11/22/2019 ORVAL HERNANDEZ-MARCI
Stormwater Pollution Mitigatn Cleared 11/22/2019 ORVAL HERNANDEZ-MARCI
Highway dedication Cleared 1/21/2020 THOMAS LANG
Sewer availability Cleared 2/26/2020 JEANIE LAM
Food Service Establishment Cleared 6/5/2020 RAMESHBHAIR PATEL
Work Adjacent to Public Way Cleared 6/16/2020 BOK GOH
Bicycle Parking Cleared 6/19/2020 ELENA LOPEZ
Eng Process Fee Ord 176,300 Cleared 6/19/2020 ELENA LOPEZ
Permit Cleared 6/22/2020 SAM NAVID
Roof/Waste drainage to street Cleared 6/22/2020 SAM NAVID
Watercourse Cleared 6/22/2020 SAM NAVID
"T" removal Cleared 7/1/2020 ERIN STRELICH
Miscellaneous Cleared 7/1/2020 ERIN STRELICH
Miscellaneous Cleared 7/1/2020 ERIN STRELICH
Miscellaneous Cleared 7/1/2020 ERIN STRELICH
Miscellaneous Cleared 7/1/2020 ERIN STRELICH
Project located in CRA area Cleared 7/1/2020 GISELLE CORELLA
ZA Case Cleared 7/1/2020 ERIN STRELICH
ZA Case Cleared 7/1/2020 ERIN STRELICH
Encroachment in public way Cleared 7/2/2020 ELENA LOPEZ
DAS Clearance Cleared 7/17/2020 JOHN VASQUEZ
Green Code Cleared 7/21/2020 DONALD CRICHLOW
Hydrant and Access approval Cleared 7/23/2020 KURT CORRAL
"D" conditions Cleared 7/29/2020 ERIN STRELICH
"Q" conditions Cleared 7/29/2020 ERIN STRELICH
CPC Cleared 7/29/2020 ERIN STRELICH
Site Plan review Cleared 7/29/2020 ERIN STRELICH
Tract Map conditions Cleared 7/29/2020 ERIN STRELICH
ZI Cleared 7/29/2020 ERIN STRELICH
Fire Marshall Fire Life Safety Cleared 7/30/2020 DOMINIQUE MEDINA
Building over 3-story or 36-ft Cleared 7/31/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/31/2020 CALOSHA APPROVED

Contact Information

Architect Wicksman,, Warwick Ian; Lic. No.: C23350 22844 DOLOROSA ST      WOODLAND HILLS, CA 91367
Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 525 MARKET ST STE 2850      SAN FRANCISCO, CA 94105
Engineer Islam,, Mohammed Saiful; Lic. No.: S4083 155 N LAKE AVE SUITE 600      PASADENA, CA 91101
Engineer Lew,, Marshall; Lic. No.: GE522 700 FLORES DE ORO      SOUTH PASADENA, CA 910303635
Engineer Murphy,, Mark Andrew; Lic. No.: GE2777 5313 DUNROBIN AVE      LAKEWOOD, CA 90713

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/13/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/13/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/13/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/13/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 5/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/17/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/17/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/17/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/17/2021 Conditional Approval NICK DANERI
Drywall Nailing 5/17/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/17/2021 Partial Approval NICK DANERI
Green Building Rough 5/17/2021 Not Ready for Inspection NICK DANERI
Deputy Drilled-In Anchors 5/18/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/18/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/18/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/18/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/18/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 5/18/2021 Partial Approval NICK DANERI
METHANE-Barrier 5/18/2021 Conditional Approval NICK DANERI
METHANE-Subgrade 5/18/2021 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 5/19/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/19/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/19/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/19/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/19/2021 Conditional Approval NICK DANERI
Insulation 5/19/2021 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 5/20/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/20/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/20/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/20/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/20/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 5/21/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/21/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/21/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/21/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/21/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 5/21/2021 Partial Approval NICK DANERI
METHANE-Barrier 5/21/2021 Partial Inspection NICK DANERI
METHANE-Subgrade 5/21/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/24/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/24/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/24/2021 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/24/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/24/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/24/2021 Partial Approval NICK DANERI
Drywall Nailing 5/25/2021 Partial Approval NICK DANERI
Green Building Rough 5/25/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/28/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/1/2021 Partial Approval NICK DANERI
METHANE-Barrier 6/1/2021 Partial Approval NICK DANERI
METHANE-Subgrade 6/1/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/7/2021 Partial Approval NICK DANERI
Footing/Foundation/Slab 6/8/2021 Partial Approval NICK DANERI
METHANE-Barrier 6/8/2021 Approved NICK DANERI
METHANE-Subgrade 6/8/2021 Approved NICK DANERI
Excavation/Setback/Form/Re-Bar 6/9/2021 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 6/10/2021 Not Ready for Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/11/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 6/14/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/15/2021 Partial Approval JAMES POWERS
Insulation 6/16/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/23/2021 Partial Approval JAMES POWERS
Drywall Nailing 6/23/2021 Partial Approval JAMES POWERS
Green Building Rough 6/23/2021 Approved JAMES POWERS
Deputy Reinf. Concrete 6/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/25/2021 Conditional Approval JONATHAN QUACH
Light Gage Steel Frame 6/25/2021 Approved JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 6/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/28/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/28/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/29/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/30/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/1/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/2/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/6/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/6/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/7/2021 Partial Approval JAMES POWERS
Drywall Nailing 7/7/2021 Partial Approval JAMES POWERS
Insulation 7/7/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/7/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/8/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 7/12/2021 Conditional Approval DAVID TSAU
Deputy Pre-Stress Concrete 7/13/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/13/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/14/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/14/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/15/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/15/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/16/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 7/16/2021 Partial Approval RAFAEL ESPINOZA
Insulation 7/16/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/19/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/19/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/20/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/20/2021 Partial Approval JAMES POWERS
Drywall Nailing 7/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/23/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/23/2021 Partial Approval JAMES POWERS
Drywall Nailing 7/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/26/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/27/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/27/2021 Partial Approval JAMES POWERS
Drywall Nailing 7/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/28/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/28/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/28/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/29/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/29/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/2/2021 Partial Approval JAMES POWERS
Drywall Nailing 8/2/2021 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 8/2/2021 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 8/3/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/4/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/4/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/4/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/5/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/5/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/6/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/6/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/11/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/12/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/12/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/12/2021 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 8/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/13/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/13/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/13/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/16/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/17/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/17/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/18/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/18/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/18/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/18/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/19/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/20/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/23/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/23/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/25/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/26/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/26/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/27/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/30/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/30/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/31/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/31/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/31/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/31/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/1/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/2/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/2/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/3/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/7/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/9/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 9/9/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/16/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/16/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/17/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/17/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/18/2021 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/20/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/20/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/20/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/21/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/21/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/22/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/22/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/22/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/22/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/23/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 9/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/23/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/23/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/24/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 9/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/24/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/24/2021 Partial Approval JAMES POWERS
Drywall Nailing 9/27/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 9/28/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/28/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 9/30/2021 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/6/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/6/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/7/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/8/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/12/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/12/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/13/2021 Partial Approval JAMES POWERS
Insulation 10/13/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/14/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/14/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/19/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/19/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 10/19/2021 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 10/21/2021 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 10/22/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/22/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/25/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/27/2021 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 10/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/28/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/2/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/2/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/3/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/3/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/4/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/5/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/5/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/8/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 11/8/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/9/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/10/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/10/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/15/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/16/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/16/2021 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/18/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/18/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/19/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 11/19/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/22/2021 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Concrete 11/22/2021 Conditional Approval BRUCE CAMPBELL
Deputy Steel/Welding 11/22/2021 Conditional Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 11/23/2021 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/23/2021 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 11/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/23/2021 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/29/2021 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/30/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/30/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/30/2021 Conditional Approval NICK DANERI
Drywall Nailing 11/30/2021 Partial Approval NICK DANERI
Insulation 11/30/2021 Partial Approval NICK DANERI
Light Gage Steel Frame 11/30/2021 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 12/1/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/1/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/2/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/2/2021 Conditional Approval NICK DANERI
Pre-Inspection 12/2/2021 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 12/3/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/3/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/6/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/6/2021 Conditional Approval NICK DANERI
Light Gage Steel Frame 12/7/2021 Partial Approval NICK DANERI
Deputy Fireproofing 12/8/2021 Conditional Approval NICK DANERI
Deputy Fireproofing 12/9/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 12/9/2021 Partial Approval NICK DANERI
Light Gage Steel Frame 12/9/2021 Partial Approval NICK DANERI
Deputy Fireproofing 12/10/2021 Conditional Approval NICK DANERI
Light Gage Steel Frame 12/13/2021 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 12/15/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/15/2021 Conditional Approval NICK DANERI
Light Gage Steel Frame 12/15/2021 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 12/16/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/16/2021 Conditional Approval NICK DANERI
Structural Steel Frame 12/16/2021 Not Ready for Inspection NICK DANERI
Deputy Drilled-In Anchors 12/17/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/17/2021 Partial Approval JAMES POWERS
Drywall Nailing 12/17/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/17/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/20/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/20/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/21/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/21/2021 Conditional Approval NICK DANERI
Interior/Exterior Lathing 12/22/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/28/2021 Partial Approval NICK DANERI
Deputy Steel/Welding 1/3/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/5/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/6/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 1/6/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 1/7/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 1/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/12/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/13/2022 Partial Approval JAMES POWERS
Deputy Fireproofing 1/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 1/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 1/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/19/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/19/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/21/2022 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/21/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/21/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/24/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 1/24/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/24/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 1/24/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 1/25/2022 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 1/25/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/25/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 1/27/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 2/3/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 2/10/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 2/11/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/14/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/15/2022 Conditional Approval NICK DANERI
Special/Order Compliance 2/15/2022 Partial Inspection NICK DANERI
T-Bar Ceiling 2/15/2022 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 2/17/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 2/18/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/18/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 2/22/2022 Conditional Approval TED RIES
Deputy Steel/Welding 2/22/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/23/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/23/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 2/24/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/24/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 2/24/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 2/25/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/25/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 2/28/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 2/28/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/1/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 3/1/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/2/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 3/2/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 3/2/2022 Partial Approval NICK DANERI
Deputy Fireproofing 3/8/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 3/9/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/14/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/14/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/15/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/15/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/17/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 3/17/2022 Partial Approval NICK DANERI
Deputy Fireproofing 3/18/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/21/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/22/2022 Conditional Approval NICK DANERI
Special/Order Compliance 3/22/2022 Partial Approval NICK DANERI
Deputy Fireproofing 3/23/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/24/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 3/24/2022 Partial Approval NICK DANERI
Deputy Fireproofing 3/25/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/29/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/29/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/30/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/30/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/31/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 3/31/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/1/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 4/1/2022 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/1/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 4/4/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/4/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/5/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/5/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/6/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/6/2022 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/7/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/7/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 4/7/2022 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 4/8/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/8/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 4/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 4/13/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/13/2022 Conditional Approval NICK DANERI
Structural Steel Frame 4/13/2022 Corrections Issued NICK DANERI
Deputy Fireproofing 4/14/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/14/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 4/15/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/15/2022 Partial Approval JAMES POWERS
Deputy Fireproofing 4/21/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 4/22/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 4/25/2022 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 4/26/2022 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/9/2022 Not Ready for Inspection NICK DANERI
Interior/Exterior Lathing 5/11/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 5/18/2022 Partial Approval JAMES POWERS
METHANE-Rough 6/14/2022 Approved NICK DANERI
Reinforced Concrete Frame 6/14/2022 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 6/14/2022 Partial Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 6/15/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/1/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 7/5/2022 Not Ready for Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 7/8/2022 Partial Approval NICK DANERI
Insulation 7/14/2022 Partial Inspection NICK DANERI
Light Gage Steel Frame 7/15/2022 Partial Approval NICK DANERI
Reinforced Concrete Frame 7/26/2022 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 7/26/2022 Not Ready for Inspection NICK DANERI
T-Bar Ceiling 8/3/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/8/2022 Partial Approval NICK DANERI
Insulation 8/18/2022 Partial Approval NICK DANERI
Special/Order Compliance 8/24/2022 Not Ready for Inspection JAMES POWERS
Deputy Grading 8/31/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/31/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/31/2022 Partial Approval JAMES POWERS
Deputy Grading 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Grading 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Grading 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 9/13/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/13/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 9/13/2022 Partial Approval NICK DANERI
Pre-Inspection 9/13/2022 Partial Inspection NICK DANERI
Deputy Grading 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 9/16/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/16/2022 Conditional Approval NICK DANERI
Light Gage Steel Frame 9/16/2022 Partial Approval NICK DANERI
Deputy Grading 9/19/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/19/2022 Conditional Approval NICK DANERI
Deputy Grading 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/23/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 9/26/2022 Conditional Approval NICK DANERI
Deputy Fireproofing 9/27/2022 Conditional Approval NICK DANERI
Deputy Grading 9/27/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/27/2022 Conditional Approval NICK DANERI
Deputy Grading 9/29/2022 Conditional Approval DANIEL VARNUM
Special/Order Compliance 9/29/2022 Partial Inspection DANIEL VARNUM
Deputy Grading 10/3/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/3/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Pre-Inspection 10/28/2022 No Access for Inspection GREGORY POMISH
Deputy Fireproofing 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
SGSOV-Seismic Gas S/O Valve 11/7/2022 SGSOV Not Ready NICK DANERI
Deputy Grading 11/9/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/9/2022 Conditional Approval NICK DANERI
Special/Order Compliance 11/9/2022 Partial Inspection NICK DANERI
Deputy Grading 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Pre-Inspection 11/18/2022 Partial Inspection NICK DANERI
Special/Order Compliance 11/30/2022 Partial Inspection NICK DANERI
Drywall Nailing 12/12/2022 Approved JAMES POWERS
Final 12/12/2022 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 12/12/2022 Approved JAMES POWERS
Green Building Final 12/12/2022 Approved JAMES POWERS
Reinforced Concrete Frame 12/12/2022 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 12/12/2022 SGSOV Not Required JAMES POWERS
SUSMP-Std. Urban Storm Water 12/12/2022 Approved JAMES POWERS
Smoke Detectors 12/12/2022 Approved JAMES POWERS
Verify Sprinkler Sign Off 12/12/2022 Not Ready for Inspection JAMES POWERS
Pre-Inspection 12/14/2022 Partial Approval JAMES POWERS
Pre-Inspection 12/15/2022 Not Ready for Inspection NICK DANERI
Pre-Inspection 12/16/2022 Not Ready for Inspection NICK DANERI
Special/Order Compliance 1/30/2023 Partial Inspection NICK DANERI
Pre-Inspection 2/7/2023 Partial Approval JAMES POWERS
Pre-Inspection 2/8/2023 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 2/14/2023 Partial Inspection NICK DANERI
Deputy Steel/Welding 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Special/Order Compliance 2/16/2023 Partial Inspection NICK DANERI
Pre-Inspection 2/27/2023 Partial Approval NICK DANERI
Pre-Inspection 2/28/2023 Partial Approval NICK DANERI
Pre-Inspection 3/1/2023 Partial Approval NICK DANERI
Pre-Inspection 3/2/2023 Partial Approval NICK DANERI
Pre-Inspection 3/3/2023 Partial Approval NICK DANERI
Final 3/16/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/16/2023 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 3/16/2023 Not Ready for Inspection NICK DANERI
Special/Order Compliance 3/24/2023 Conditional Approval NICK DANERI
Special/Order Compliance 4/7/2023 Conditional Approval NICK DANERI
Final 6/30/2023 Conditional Approval NICK DANERI
Reinforced Concrete Frame 6/30/2023 Approved NICK DANERI
Verify Sprinkler Sign Off 6/30/2023 Approved NICK DANERI
Final 7/7/2023 Partial Approval GREGORY POMISH
Special/Order Compliance 8/9/2023 Partial Inspection NICK DANERI
Deputy Steel/Welding 8/10/2023 Conditional Approval NICK DANERI
Special/Order Compliance 8/23/2023 Conditional Approval NICK DANERI
Final 9/19/2023 OK for TCO NICK DANERI
Final 10/24/2023 Conditional Approval NICK DANERI
Special/Order Compliance 2/28/2024 Conditional Approval NICK DANERI