11848 W VANOWEN ST 91605

Certificate Information: 11848 W VANOWEN ST 91605

Application / Permit
19010-10000-01090
Plan Check / Job No.
B19LA05287
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 5 STORY, TYPE VA 35-UNIT APARTMENT BUILDING OVER 1 LEVEL OF TYPE IA BASEMENT GARAGE. ( 3 EXTREMELY LOW INCOME UNITS SHALL BE SET ASIDE PER TOC TIER 1.)
Permit Issued
Issued on 2/5/2021
Issuing Office
Metro
Current Status
CofO Issued on 5/12/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/18/2019 APPLICANT
Assigned to Plan Check Engineer 3/28/2019 JOHN VASQUEZ
Corrections Issued 4/4/2019 JOHN VASQUEZ
Quality Review Completed 4/9/2019 CHARLES CHANG
Building Plans Picked Up 4/16/2019 APPLICANT
Applicant returned to address corrections 8/25/2020 LARRY LEE
Applicant returned to address corrections 8/28/2020 LARRY LEE
Applicant returned to address corrections 12/4/2020 LARRY LEE
Applicant returned to address corrections 12/10/2020 LARRY LEE
Plan Check Approved 1/28/2021 LARRY LEE
Issued 2/5/2021 APPLICANT
TCO Issued (Expire Date: 09-12-2023) 3/16/2023 JEFFREY DURAN
CofO in Progress 4/17/2023 JOHN KITCKO
Permit Finaled 5/12/2023 JEFFREY DURAN
CofO Issued 5/12/2023 JEFFREY DURAN
Permit Finaled 5/12/2023 JEFFREY DURAN

Permit Application Clearance Information

Address approval Cleared 2/27/2020 EMIL KYUPELYAN
Green Code Cleared 2/27/2020 JOHN VASQUEZ
Trees in Parkway Cleared 2/27/2020 JOHN KIM
Low Impact Development Cleared 3/12/2020 JORGE MEJIA LEMUS
Stormwater Pollution Mitigatn Cleared 3/12/2020 JORGE MEJIA LEMUS
Highway dedication Cleared 4/13/2020 LEE GUILBEAUX
Permit Cleared 4/13/2020 LEE GUILBEAUX
Building over 3-story or 36-ft Cleared 4/15/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/15/2020 CALOSHA APPROVED
Hydrant and Access approval Cleared 5/20/2020 KURT CORRAL
Density Bonus 12.22.A.31 Cleared 5/26/2020 JACOB COMER
Driveway location Cleared 6/24/2020 ALBERT ISAGULIAN
Internal circulation Cleared 6/24/2020 ALBERT ISAGULIAN
Sewer availability Cleared 6/30/2020 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 7/1/2020 GABRIEL ROBLES
Frnt yard landscape/Water mgmt Cleared 9/15/2020 PABLO ESTRADA
Miscellaneous Cleared 9/15/2020 PABLO ESTRADA
Miscellaneous Cleared 9/15/2020 PABLO ESTRADA
Opn space landscape/Water mgmt Cleared 9/15/2020 PABLO ESTRADA
Roof/Waste drainage to street Cleared 10/13/2020 GABRIEL ROBLES
Fire Marshall Fire Life Safety Cleared 12/3/2020 WILLIAM JOHNS
Work Adjacent to Public Way Cleared 12/4/2020 LEE GUILBEAUX
DAS Clearance Cleared 1/8/2021 ELIZABETH TOMS

Contact Information

Architect Maly,, Farzin; Lic. No.: C33731 7136 HASKELL AVENUE # 320      VAN NUYS, CA 91406
Contractor Alpa Construction Inc; Lic. No.: 708299-B PO BOX 2548      VAN NUYS, CA 91404

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/10/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/17/2021 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 3/30/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 3/31/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/6/2021 Corrections Issued JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/7/2021 Approved HAMID PISHEHVAR
Deputy Shotcrete 4/12/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/12/2021 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/16/2021 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/21/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/22/2021 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 5/7/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/10/2021 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/13/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 6/8/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/8/2021 Not Ready for Inspection JOHN KITCKO
Green Building Rough 6/8/2021 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 6/8/2021 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 6/8/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/10/2021 Partial Approval JOHN KITCKO
Green Building Rough 6/10/2021 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 6/10/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 6/14/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 6/21/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/21/2021 Partial Approval JOHN KITCKO
Deputy Shotcrete 7/1/2021 Approved JOHN KITCKO
Green Building Rough 7/1/2021 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 7/1/2021 Partial Approval JOHN KITCKO
Deputy Shotcrete 7/2/2021 Approved JOHN KITCKO
Deputy Drilled-In Anchors 7/30/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/30/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 8/5/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/5/2021 Conditional Approval JOHN KITCKO
Deputy Drilled-In Anchors 8/11/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/13/2021 Partial Approval JOHN KITCKO
Deputy Wood Construction 9/2/2021 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/2/2021 Not Ready for Inspection JOHN KITCKO
Green Building Rough 9/10/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 9/10/2021 Partial Approval JOHN KITCKO
Deputy Drilled-In Anchors 9/16/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/16/2021 Partial Approval JOHN KITCKO
Deputy Wood Construction 9/20/2021 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/20/2021 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/22/2021 Partial Approval JOHN KITCKO
Pre-Inspection 10/5/2021 Corrections Issued JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/13/2021 Partial Approval JOHN KITCKO
Deputy Wood Construction 10/28/2021 Conditional Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 10/28/2021 Partial Approval DANIEL VARNUM
Deputy Wood Construction 11/3/2021 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/3/2021 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 11/4/2021 Partial Approval KENNETH ROBERTS
Floor/Roof Diaphrgm/Shear Wall 11/4/2021 Partial Approval KENNETH ROBERTS
Deputy Wood Construction 11/5/2021 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/5/2021 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/8/2021 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 11/12/2021 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 11/15/2021 Approved JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 11/16/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/1/2021 Partial Approval JOHN KITCKO
Green Building Rough 12/2/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/2/2021 Partial Approval JOHN KITCKO
Insulation 12/3/2021 Partial Approval JOHN KITCKO
Green Building Rough 12/6/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/6/2021 Partial Approval JOHN KITCKO
Insulation 12/7/2021 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/10/2021 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/13/2021 Partial Approval JOHN KITCKO
Insulation 12/15/2021 Partial Approval JOHN KITCKO
Drywall Nailing 12/21/2021 Partial Approval JOHN KITCKO
Insulation 12/27/2021 Partial Approval JOHN KITCKO
Insulation 1/7/2022 Partial Inspection JOHN KITCKO
Drywall Nailing 1/21/2022 Partial Approval DANIEL VARNUM
Green Building Rough 1/28/2022 Partial Approval JOHN KITCKO
Wood Frame 1/28/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 2/1/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/1/2022 Partial Approval JOHN KITCKO
Insulation 2/4/2022 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 2/7/2022 Partial Inspection JOHN KITCKO
Green Building Rough 2/8/2022 Partial Approval JOHN KITCKO
Wood Frame 2/8/2022 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/9/2022 Partial Approval JOHN KITCKO
Insulation 2/14/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 2/15/2022 Partial Approval JOHN KITCKO
Wood Frame 2/15/2022 Partial Approval JOHN KITCKO
Pre-Inspection 2/17/2022 Partial Inspection JOHN KITCKO
Drywall Nailing 2/18/2022 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 2/23/2022 Conditional Approval CAMERON CHABAN
Green Building Rough 2/24/2022 Approved JOHN KITCKO
Interior/Exterior Lathing 2/24/2022 Partial Approval JOHN KITCKO
Wood Frame 2/25/2022 Partial Approval JOHN KITCKO
Pre-Inspection 2/28/2022 Partial Approval JOHN KITCKO
Drywall Nailing 3/1/2022 Partial Inspection JOHN KITCKO
Pre-Inspection 3/2/2022 Partial Approval JOHN KITCKO
Drywall Nailing 3/3/2022 Partial Approval JOHN KITCKO
Drywall Nailing 3/4/2022 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 3/15/2022 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 3/18/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 3/30/2022 Partial Approval JOHN KITCKO
Light Gage Steel Frame 4/19/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 4/21/2022 Partial Approval JOHN KITCKO
Pre-Inspection 5/19/2022 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 5/25/2022 Partial Approval JOHN KITCKO
Insulation 6/6/2022 Partial Inspection JOHN KITCKO
Drywall Nailing 6/14/2022 Partial Approval JOHN KITCKO
Pre-Inspection 11/15/2022 Partial Inspection JOHN KITCKO
Insulation 12/22/2022 Partial Approval JOHN KITCKO
Drywall Nailing 12/28/2022 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 1/3/2023 Partial Inspection JOHN KITCKO
Drywall Nailing 1/4/2023 Partial Inspection JEFFREY FULTON
Pre-Inspection 1/26/2023 Partial Inspection JOHN KITCKO
Final 3/9/2023 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 3/9/2023 Approved JOHN KITCKO
Green Building Final 3/9/2023 Approved JOHN KITCKO
Reinforced Concrete Frame 3/9/2023 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 3/9/2023 SGSOV Approved JOHN KITCKO
SUSMP-Std. Urban Storm Water 3/9/2023 Approved JOHN KITCKO
Smoke Detectors 3/9/2023 Approved JOHN KITCKO
Wood Frame 3/9/2023 Approved JOHN KITCKO
Final 4/11/2023 Conditional Approval JOHN KITCKO
Final 4/17/2023 OK to Issue CofO JOHN KITCKO