1011 N EVERETT ST Building A 90026

Certificate Information: 1011 N EVERETT ST Building A 90026

Application / Permit
19010-10000-00882
Plan Check / Job No.
B19LA04148
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New -3-story 11 unit multi residential building, building A over 1 level of subterranean parking. The project utilizes the city of Los Angeles affordable housing/denisty bonus provisions and have 2 designated affordable housing units DIR 2016-1039-DB
Permit Issued
Issued on 6/4/2021
Issuing Office
Current Status
CofO Issued on 9/10/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/28/2019 APPLICANT
Assigned to Plan Check Engineer 3/8/2019 QUAN NGHIEM
Green Plans Picked Up 3/14/2019 APPLICANT
Disabled Access Plans Picked Up 3/21/2019 APPLICANT
Corrections Issued 4/12/2019 QUAN NGHIEM
Building Plans Picked Up 4/23/2019 APPLICANT
Quality Review Completed 4/30/2019 SIAVOSH POURSABAHIAN
Applicant returned to address corrections 1/24/2020 QUAN NGHIEM
Applicant returned to address corrections 3/4/2020 QUAN NGHIEM
Applicant returned to address corrections 8/4/2020 QUAN NGHIEM
Applicant returned to address corrections 8/6/2020 QUAN NGHIEM
Applicant returned to address corrections 8/13/2020 QUAN NGHIEM
Applicant returned to address corrections 9/23/2020 QUAN NGHIEM
Applicant returned to address corrections 9/24/2020 QUAN NGHIEM
Plan Check Approved 3/12/2021 QUAN NGHIEM
Issued 6/4/2021 APPLICANT
TCO Issued (Expire Date: 08-27-2025) 2/28/2025 ADAM BURGESS
CofO Issued 9/10/2025 ERNESTO CORRAL
Permit Finaled 9/10/2025 ERNESTO CORRAL

Permit Application Clearance Information

Highway dedication Cleared 4/9/2019 JEANETTE VONG
Permit Cleared 4/9/2019 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 5/7/2019 CELINA MORENO
Site Plan review Cleared 6/13/2019 ANNA VAN
Sewer availability Cleared 7/22/2019 ELENA LOPEZ
Address approval Cleared 11/1/2019 ELAINE LEI
Hydrant and Access approval Cleared 1/14/2020 ROBERT DUFF
Green Code Cleared 1/16/2020 COLIN LOREDO
Trees in Parkway Cleared 1/17/2020 ADRIAN SANCHEZ
Density Bonus 12.22.A.25 Cleared 1/23/2020 JACOB COMER
Building over 3-story or 36-ft Cleared 3/4/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/4/2020 CALOSHA APPROVED
DAS Clearance Cleared 3/11/2020 WAI LAU
Low Impact Development Cleared 4/15/2020 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 4/16/2020 CECILIO NAVARRO
Fire Marshall Fire Life Safety Cleared 7/23/2020 OSCAR SALGADO JR
"Q" conditions Cleared 8/4/2020 PABLO ESTRADA
Frnt yard landscape/Water mgmt Cleared 8/4/2020 PABLO ESTRADA
Miscellaneous Cleared 8/4/2020 PABLO ESTRADA
Opn space landscape/Water mgmt Cleared 8/4/2020 PABLO ESTRADA

Contact Information

Architect Epstein,, Matthew D; Lic. No.: C29433 18100 BURBANK BLVD #22      TARZANA, CA 91356
Contractor Dynamic Design Build Inc; Lic. No.: 747205-B 11777 SAN VICENTE BLVD STE 800      LOS ANGELES, CA 90049
Engineer Garcia,, Ramon; Lic. No.: S4595 732 HOLBERTSON COURT      SIMI VALLEY, CA 93065

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/21/2021 Approved RAFAEL ESPINOZA
Pre-Inspection 7/26/2021 Approved JONATHAN QUACH
Deputy Reinf. Concrete 7/29/2021 Conditional Approval JONATHAN QUACH
Piling/Pier/Caisson 7/29/2021 Partial Approval JONATHAN QUACH
Piling/Pier/Caisson 7/30/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Reinf. Concrete 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 8/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 8/6/2021 Conditional Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 8/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Grading 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Grading 9/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Grading 9/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 9/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/4/2021 Conditional Approval ERNESTO CORRAL
Deputy Grading 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 10/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/20/2021 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 1/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Grading 1/26/2022 Conditional Approval ERNESTO CORRAL
Green Building Rough 3/21/2022 Approved RAFAEL ESPINOZA
METHANE-Rough 3/21/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 3/21/2022 Partial Approval RAFAEL ESPINOZA
METHANE-Rough 4/4/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/4/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/4/2022 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 4/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 4/20/2022 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 4/27/2022 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 4/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 4/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/28/2022 Conditional Approval RAFAEL ESPINOZA
METHANE-Rough 5/3/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/3/2022 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/4/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 5/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/6/2022 Conditional Approval RAFAEL ESPINOZA
METHANE-Rough 5/9/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/9/2022 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/9/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/10/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/18/2022 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/7/2022 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 6/7/2022 Approved RAFAEL ESPINOZA
METHANE-Subgrade 6/7/2022 Approved RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/16/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 8/23/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/24/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/24/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 1/20/2023 No Access for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/23/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/24/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 1/24/2023 Conditional Approval RAFAEL ESPINOZA
METHANE-Rough 1/24/2023 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/24/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/24/2023 Partial Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/21/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/23/2023 Partial Approval GREGORY POMISH
METHANE-Rough 4/13/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 4/13/2023 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 4/13/2023 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/14/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/10/2023 Partial Approval LARRY ARNICK
METHANE-Rough 6/16/2023 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 6/16/2023 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 6/16/2023 Not Ready for Inspection LARRY ARNICK
Wall Anchors 8/21/2023 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/23/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/28/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/31/2023 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 9/28/2023 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 12/27/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/7/2024 Not Ready for Inspection LARRY ARNICK
Insulation 2/7/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 2/7/2024 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 2/7/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 2/7/2024 Not Ready for Inspection LARRY ARNICK
Insulation 2/9/2024 Partial Approval LARRY ARNICK
Insulation 3/15/2024 Partial Approval LARRY ARNICK
Drywall Nailing 3/29/2024 Partial Approval LARRY ARNICK
Insulation 3/29/2024 Partial Approval LARRY ARNICK
Drywall Nailing 4/10/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 4/11/2024 Corrections Issued JEFFREY FULTON
Drywall Nailing 5/8/2024 Corrections Issued JEFFREY FULTON
Drywall Nailing 5/9/2024 Partial Approval LARRY ARNICK
Special/Order Compliance 8/13/2024 Partial Inspection LARRY ARNICK
Footing/Foundation/Slab 8/16/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 8/21/2024 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 8/22/2024 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 8/26/2024 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 8/28/2024 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 8/30/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 9/30/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 10/17/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 10/29/2024 Partial Approval LARRY ARNICK
Special/Order Compliance 10/31/2024 Corrections Issued LARRY ARNICK
Interior/Exterior Lathing 11/7/2024 Partial Approval RAMAZANALI ALMASI
Final 12/10/2024 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 12/10/2024 Approved LARRY ARNICK
Green Building Final 12/10/2024 Approved LARRY ARNICK
METHANE-Final 12/10/2024 Approved LARRY ARNICK
METHANE-Rough 12/10/2024 Approved LARRY ARNICK
Reinforced Concrete Frame 12/10/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 12/10/2024 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 12/10/2024 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 12/10/2024 Approved LARRY ARNICK
Verify Sprinkler Sign Off 12/10/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 12/10/2024 Not Ready for Inspection LARRY ARNICK
Final 12/13/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/13/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 12/13/2024 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 12/13/2024 SGSOV Not Ready LARRY ARNICK
Verify Sprinkler Sign Off 12/13/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 12/13/2024 Not Ready for Inspection LARRY ARNICK
Final 12/17/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/17/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 12/17/2024 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 12/17/2024 SGSOV Approved LARRY ARNICK
Verify Sprinkler Sign Off 12/17/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 12/17/2024 Not Ready for Inspection LARRY ARNICK
Final 1/2/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/2/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 1/2/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 1/2/2025 Partial Inspection LARRY ARNICK
Wood Frame 1/2/2025 Not Ready for Inspection LARRY ARNICK
Final 1/7/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/7/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 1/7/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 1/7/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 1/7/2025 Not Ready for Inspection LARRY ARNICK
Final 1/14/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/14/2025 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 1/14/2025 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 1/14/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 1/14/2025 Not Ready for Inspection LARRY ARNICK
Final 1/22/2025 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/22/2025 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 1/22/2025 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/22/2025 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 1/22/2025 Not Ready for Inspection RAFAEL ESPINOZA
Final 2/7/2025 Partial Inspection RONALD JIMENEZ
Reinforced Concrete Frame 2/7/2025 Not Ready for Inspection RONALD JIMENEZ
Reinforced Masonry Frame 2/7/2025 Not Ready for Inspection RONALD JIMENEZ
Verify Sprinkler Sign Off 2/7/2025 Not Ready for Inspection RONALD JIMENEZ
Wood Frame 2/7/2025 Not Ready for Inspection RONALD JIMENEZ
Final 2/26/2025 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 2/26/2025 Approved LARRY ARNICK
Reinforced Masonry Frame 2/26/2025 Approved LARRY ARNICK
Verify Sprinkler Sign Off 2/26/2025 Approved LARRY ARNICK
Wood Frame 2/26/2025 Approved LARRY ARNICK
Special/Order Compliance 7/29/2025 No Access for Inspection LARRY ARNICK