Pre-Inspection
|
6/21/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
7/26/2021
|
Approved
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
7/29/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Piling/Pier/Caisson
|
7/29/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Piling/Pier/Caisson
|
7/30/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
8/3/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
8/4/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
8/6/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
8/6/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/9/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
8/27/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/7/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/8/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/9/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/10/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/20/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/21/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/22/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/23/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Grading
|
9/24/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Grading
|
9/27/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Grading
|
9/28/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/29/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
9/30/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/1/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/4/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Grading
|
10/5/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/6/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/7/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/8/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/12/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/13/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/15/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/18/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/19/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/20/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/21/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/22/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/26/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/27/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/28/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
10/29/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/20/2021
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
1/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
1/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Green Building Rough
|
3/21/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
3/21/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
4/4/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/4/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/4/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
4/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/20/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
4/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
4/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/27/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
4/27/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
4/27/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/3/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/4/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
5/6/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/9/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/9/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/9/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
6/7/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
6/7/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
8/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/24/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/20/2023
|
No Access for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/24/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
1/24/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
1/24/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/24/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/24/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/21/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/23/2023
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Rough
|
4/13/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
4/13/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
4/13/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/14/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/10/2023
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Rough
|
6/16/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
6/16/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/16/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wall Anchors
|
8/21/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/23/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/28/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/31/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
9/28/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/27/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
2/7/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
METHANE-Rough
|
2/7/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
2/7/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
2/7/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
2/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
3/15/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/29/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
3/29/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
4/10/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/11/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/8/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
8/13/2024
|
Partial Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/16/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/22/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/28/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Masonry Wall/Backfill
|
8/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
9/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
10/17/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
10/29/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
10/31/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
11/7/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Final
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
12/10/2024
|
Approved
|
LARRY ARNICK
|
|
Green Building Final
|
12/10/2024
|
Approved
|
LARRY ARNICK
|
|
METHANE-Final
|
12/10/2024
|
Approved
|
LARRY ARNICK
|
|
METHANE-Rough
|
12/10/2024
|
Approved
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
12/10/2024
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
12/10/2024
|
Approved
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
12/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
12/13/2024
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
12/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
12/17/2024
|
SGSOV Approved
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
12/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
1/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
1/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
1/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
1/2/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/2/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
1/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
1/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
1/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
1/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/7/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
1/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
1/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
1/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
1/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
1/22/2025
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/22/2025
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
1/22/2025
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/22/2025
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
1/22/2025
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
2/7/2025
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
2/7/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Reinforced Masonry Frame
|
2/7/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Verify Sprinkler Sign Off
|
2/7/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Wood Frame
|
2/7/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Final
|
2/26/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
2/26/2025
|
Approved
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
2/26/2025
|
Approved
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
2/26/2025
|
Approved
|
LARRY ARNICK
|
|
Wood Frame
|
2/26/2025
|
Approved
|
LARRY ARNICK
|
|
Special/Order Compliance
|
7/29/2025
|
No Access for Inspection
|
LARRY ARNICK
|