Pre-Inspection
|
7/19/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Pre-Inspection
|
7/29/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Piling/Pier/Caisson
|
8/1/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Steel/Welding
|
8/26/2019
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
1/30/2020
|
No Access for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
2/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/7/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/15/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/16/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/20/2020
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/21/2020
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/21/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
4/21/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/22/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/22/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/23/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/27/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/28/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/29/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/30/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/1/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/4/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
5/4/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/4/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/5/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Structural Steel Frame
|
5/5/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/6/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/7/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/7/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/8/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/11/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/11/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/12/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/13/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/14/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/14/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/15/2020
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
5/22/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
5/22/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/27/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/27/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/28/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
6/1/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/1/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
6/2/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/2/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
6/2/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/3/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
6/15/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/18/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/19/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/24/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
6/24/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/25/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
6/30/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/1/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/1/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/2/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
7/6/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Masonry
|
7/10/2020
|
Conditional Approval
|
TED RIES
|
|
Masonry Wall/Backfill
|
7/10/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Masonry
|
7/13/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/14/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
7/14/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/15/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/16/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
7/16/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/17/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
7/20/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/21/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/28/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/29/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/30/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/31/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/10/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/11/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
8/17/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
8/18/2020
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Reinforced Masonry Frame
|
8/18/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
8/19/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
8/19/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
8/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
8/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
8/20/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
8/21/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
8/21/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
9/10/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/11/2020
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
9/17/2020
|
Off-Hour Fees Due
|
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/22/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
9/23/2020
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/25/2020
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2020
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Shotcrete
|
9/29/2020
|
Conditional Approval
|
ALAN NOVAK
|
|
Reinforced Masonry Frame
|
10/1/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/13/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/19/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
10/28/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/30/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/4/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2020
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
11/13/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/13/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/25/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/30/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/1/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/7/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/14/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/17/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
12/17/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/21/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/5/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/15/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
1/20/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
1/21/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
1/25/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
1/27/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
2/3/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
2/5/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
2/5/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/10/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Insulation
|
2/16/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
2/22/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
2/23/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Wood Frame
|
2/26/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
3/2/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
3/4/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/4/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Insulation
|
3/8/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/10/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/16/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
3/19/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
3/24/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
3/31/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/5/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
4/7/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/13/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
4/13/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/14/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/22/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
5/3/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/4/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
5/6/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/7/2021
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
5/13/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
5/14/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/21/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
5/26/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
5/27/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
6/1/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
6/3/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
6/4/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/16/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/18/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/23/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
7/7/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
7/15/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Structural Steel Frame
|
7/20/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
8/11/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/27/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
9/13/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
9/15/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
10/6/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
10/25/2021
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
11/5/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
11/30/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
12/15/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
2/3/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
2/3/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Final
|
2/3/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/3/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
2/3/2022
|
Approved
|
JEFF BYTHEWAY
|
|
SGSOV-Seismic Gas S/O Valve
|
2/3/2022
|
SGSOV Approved
|
JEFF BYTHEWAY
|
|
Smoke Detectors
|
2/3/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
2/3/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
4/18/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Green Building Final
|
4/18/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Final
|
4/20/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Final
|
4/20/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
4/22/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Final
|
4/27/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Final
|
5/23/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Final
|
5/24/2022
|
OK for TCO
|
JEFF BYTHEWAY
|
|
Insulation
|
5/24/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
11/4/2022
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
5/17/2023
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
11/8/2023
|
Approved
|
DERRICK SPENCER
|
|
Final
|
1/18/2024
|
No Access for Inspection
|
DERRICK SPENCER
|
|
Final
|
2/1/2024
|
OK to Issue CofO
|
DERRICK SPENCER
|