6576 S WEST BLVD 90043

Certificate Information: 6576 S WEST BLVD 90043

Application / Permit
19010-10000-00714
Plan Check / Job No.
B19LA03431
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SB-35, New Construction of One 4-story Type V-A Affordable Residential Building with Ground Floor Common Spaces.
Permit Issued
Issued on 3/25/2021
Issuing Office
Metro
Current Status
CofO Issued on 11/2/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/6/2019 APPLICANT
Assigned to Plan Check Engineer 11/14/2019 QUAN NGHIEM
Corrections Issued 12/12/2019 QUAN NGHIEM
Quality Review Completed 12/13/2019 TIEN JEN WANG
Building Plans Picked Up 12/18/2019 APPLICANT
Applicant returned to address corrections 7/20/2020 QUAN NGHIEM
Plan Check Approved 3/12/2021 QUAN NGHIEM
Issued 3/25/2021 APPLICANT
TCO Issued (Expire Date: 11-26-2023) 5/30/2023 ERNESTO CORRAL
CofO in Progress 11/2/2023 JAMES POWERS
CofO Issued 11/2/2023 TED RIES
Permit Finaled 11/2/2023 TED RIES

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 7/8/2020 SAM NAVID
Eng Process Fee Ord 176,300 Cleared 7/16/2020 PAMELA TENEZA
Community Plan Implem. Overlay Cleared 7/22/2020 WESTON PRINGLE
Address approval Cleared 8/5/2020 JEANIE LAM
Opn space landscape/Water mgmt Cleared 9/14/2020 KENTON TRINH
Green Code Cleared 11/5/2020 QUAN NGHIEM
Site Plan review Cleared 11/6/2020 KENTON TRINH
Highway dedication Cleared 11/10/2020 THAN WIN
Low Impact Development Cleared 11/13/2020 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 11/13/2020 AVALYN KAMACHI
Bicycle Parking Cleared 11/24/2020 ELAINE LEI
Building over 36-ft Cleared 1/7/2021 CALOSHA APPROVED
Hydrant and Access approval Cleared 1/11/2021 MATTHEW CRAIG
Sewer availability Cleared 1/19/2021 AVALYN KAMACHI
Density Bonus 12.22.A.25 Cleared 2/2/2021 NICHOLAS KAWAZOE
Fire Marshall Fire Life Safety Cleared 2/18/2021 DOMINIQUE MEDINA
Redevelopment Project Area Cleared 2/18/2021 GISELLE CORELLA
Public Housing Cleared 2/22/2021 THOMAS ANTONIO
DAS Clearance Cleared 3/2/2021 QUAN NGHIEM
CPC Cleared 3/11/2021 KENTON TRINH
Community Plan Implem. Overlay Cleared 3/11/2021 KYLE WINSTON
Senate Bill 35 Cleared 3/11/2021 KENTON TRINH

Contact Information

Architect Yanez,, Arturo; Lic. No.: C24019 4061 BEVERLY GLEN BL      SHERMAN OAKS, CA 91423
Contractor Olson R D Construction Inc; Lic. No.: 953845-B 400 SPECTRUM CENTER DR   STE 1200    IRVINE, CA 92618
Engineer Krief,, Dan Dov; Lic. No.: C76041 6420 WILSHIRE BLVD STE 1000      LOS ANGELES, CA 90048

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/7/2021 Approved JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/6/2021 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 8/10/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 8/13/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 8/25/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/25/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/25/2021 Partial Approval JAMES POWERS
Wall Anchors 8/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2021 Partial Approval JAMES POWERS
Deputy Other (see comments) 9/7/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/7/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/7/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/7/2021 Partial Approval JAMES POWERS
Wall Anchors 9/7/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/10/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/10/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/28/2021 Not Ready for Inspection JAMES POWERS
Masonry Wall/Backfill 9/28/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 10/14/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/15/2021 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/15/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/18/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/20/2021 Conditional Approval BRUCE CAMPBELL
Excavation/Setback/Form/Re-Bar 10/21/2021 Partial Approval JONATHAN QUACH
Footing/Foundation/Slab 10/21/2021 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 10/22/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/25/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/26/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/27/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 10/27/2021 Not Ready for Inspection JAMES POWERS
Masonry Wall/Backfill 10/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/28/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/28/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/29/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Pre-Stress Concrete 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 11/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 11/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/3/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/3/2021 Not Ready for Inspection JAMES POWERS
Masonry Wall/Backfill 11/3/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/4/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/5/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/5/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/8/2021 Partial Approval TED RIES
Masonry Wall/Backfill 11/8/2021 Partial Approval TED RIES
Deputy Reinf. Concrete 11/9/2021 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 11/12/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/15/2021 Not Ready for Inspection JAMES POWERS
Masonry Wall/Backfill 11/15/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 11/17/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/22/2021 Partial Approval TED RIES
Footing/Foundation/Slab 11/22/2021 Partial Approval TED RIES
Deputy Reinf. Concrete 11/23/2021 Conditional Approval TED RIES
Deputy Steel/Welding 11/24/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 12/7/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/8/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/30/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/3/2022 Partial Approval JAMES POWERS
Green Building Rough 1/3/2022 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 1/3/2022 Not Ready for Inspection JAMES POWERS
Wood Frame 1/3/2022 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 1/4/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/4/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/5/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/5/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/7/2022 Approved TED RIES
Deputy Steel/Welding 1/7/2022 Approved TED RIES
Deputy Wood Construction 1/7/2022 Approved TED RIES
Deputy Drilled-In Anchors 1/10/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/10/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/10/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/11/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/11/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/12/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/12/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/12/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/13/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/13/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/14/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/14/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/18/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/18/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/18/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/19/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/19/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 1/19/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/24/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/4/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/7/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 2/7/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/7/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/16/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 2/22/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/23/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2022 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/3/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/10/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/24/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 3/25/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/30/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 3/30/2022 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 3/31/2022 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/6/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 4/7/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 5/2/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 5/2/2022 Partial Approval JAMES POWERS
Insulation 5/2/2022 Partial Approval JAMES POWERS
Drywall Nailing 5/5/2022 Partial Approval JAMES POWERS
Insulation 5/6/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/11/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/12/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/13/2022 Partial Approval JAMES POWERS
Insulation 5/13/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/25/2022 Conditional Approval TERRY HERR
Deputy Steel/Welding 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/3/2022 Conditional Approval ERNESTO CORRAL
Insulation 6/6/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/7/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/8/2022 Conditional Approval ERNESTO CORRAL
Insulation 6/8/2022 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/15/2022 Partial Approval JAMES POWERS
Insulation 6/15/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 6/21/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 7/6/2022 Partial Approval JAMES POWERS
Drywall Nailing 7/7/2022 Partial Approval JAMES POWERS
Drywall Nailing 7/11/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/11/2022 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/11/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 8/15/2022 Partial Approval JAMES POWERS
Insulation 8/19/2022 Partial Approval JAMES POWERS
Insulation 8/29/2022 Partial Approval JAMES POWERS
Deputy Wood Construction 9/1/2022 Partial Approval JAMES POWERS
Insulation 9/7/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 9/14/2022 Partial Approval JAMES POWERS
Insulation 9/15/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 9/19/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 10/12/2022 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/19/2022 Partial Approval JAMES POWERS
Insulation 11/1/2022 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 11/17/2022 Approved JAMES POWERS
Light Gage Steel Frame 11/17/2022 Partial Approval JAMES POWERS
T-Bar Ceiling 11/29/2022 Partial Approval JAMES POWERS
Final 1/23/2023 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 1/23/2023 Approved JAMES POWERS
Green Building Final 1/23/2023 Approved JAMES POWERS
Green Building Rough 1/23/2023 Approved JAMES POWERS
Pre-Inspection 1/23/2023 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 1/23/2023 SGSOV Not Ready JAMES POWERS
Smoke Detectors 1/23/2023 Approved JAMES POWERS
Special/Order Compliance 1/23/2023 Approved JAMES POWERS
Verify Sprinkler Sign Off 1/23/2023 Not Ready for Inspection JAMES POWERS
Wood Frame 1/23/2023 Partial Approval JAMES POWERS
SGSOV-Seismic Gas S/O Valve 5/16/2023 SGSOV Approved JAMES POWERS
Verify Sprinkler Sign Off 5/16/2023 Not Ready for Inspection JAMES POWERS
Final 10/20/2023 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 10/20/2023 Approved JAMES POWERS
Wood Frame 10/20/2023 Approved JAMES POWERS
Final 11/1/2023 OK to Issue CofO JAMES POWERS
Special/Order Compliance 11/1/2023 Approved JAMES POWERS