2919 W WAVERLY DR 1-16 90039

Certificate Information: 2919 W WAVERLY DR 1-16 90039

Application / Permit
19010-10000-00627
Plan Check / Job No.
B19LA02951
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 3-STORY, 16 UNIT MULTI-FAMILY APARTMENT BUILDING AND BASEMENT PARKING BUILDING. TYPE V-A OVER TYPE 1-A
Permit Issued
Issued on 7/20/2021
Issuing Office
Metro
Current Status
CofO Issued on 1/5/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/12/2019 APPLICANT
Assigned to Plan Check Engineer 2/28/2019 TEODORO DIAZ RODRIGUEZ
Disabled Access Plans Picked Up 3/20/2019 APPLICANT
Corrections Issued 3/22/2019 TEODORO DIAZ RODRIGUEZ
Green Plans Picked Up 3/27/2019 APPLICANT
Quality Review Completed 3/29/2019 QUAN NGHIEM
Plan Check Approved 2/18/2021 TEODORO DIAZ RODRIGUEZ
Issued 7/20/2021 APPLICANT
Building Plans Picked Up 7/20/2021 APPLICANT
CofO in Progress 1/2/2026 DAVID BURKHEAD
Permit Finaled 1/5/2026 ERNESTO CORRAL
CofO Issued 1/5/2026 ERNESTO CORRAL
Permit Finaled 1/5/2026 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 4/1/2019 KARAN PATEL
ZA Case Cleared 4/1/2019 SOPHIE GABEL-SCHEINBAU
Trees in Parkway Cleared 4/3/2019 ADRIAN SANCHEZ
Green Code Cleared 7/17/2019 KHEDER ALRAZAA
GPI Written Notices Cleared 10/8/2019 TEODORO DIAZ RODRIGUEZ
Grading Pre-Inspection Cleared 10/8/2019 TEODORO DIAZ RODRIGUEZ
Highway dedication Cleared 10/9/2019 ELAINE LEI
Low Impact Development Cleared 10/30/2019 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 10/30/2019 THOMAS LANG
Excavation more than 5-ft deep Cleared 11/5/2019 CALOSHA APPROVED
DAS Clearance Cleared 11/13/2019 TEODORO DIAZ RODRIGUEZ
Eng Process Fee Ord 176,300 Cleared 11/14/2019 EMIL KYUPELYAN
Hydrant and Access approval Cleared 1/23/2020 ROBERT DUFF
Fire Marshall Fire Life Safety Cleared 1/29/2020 VIDAL GARCIA
Haul Route Cleared 9/4/2020 TEODORO DIAZ RODRIGUEZ
Sewer availability Cleared 1/12/2021 THOMAS LANG
Frnt yard landscape/Water mgmt Cleared 2/5/2021 TERRI OSBORNE
Landscape for retaining wall Cleared 2/5/2021 TERRI OSBORNE
Miscellaneous Cleared 2/5/2021 TERRI OSBORNE
Opn space landscape/Water mgmt Cleared 2/5/2021 TERRI OSBORNE
Tract Map conditions Cleared 2/5/2021 TERRI OSBORNE
ZA Case Cleared 2/5/2021 TERRI OSBORNE
ZI Cleared 2/5/2021 TERRI OSBORNE

Contact Information

Contractor La Rocca Design; Lic. No.: 779452-B 921 SOUTH SPAULDING AVENUE      LOS ANGELES, CA 90046

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/6/2021 Partial Approval DANIEL MC AULIFFE
Deputy Grading 8/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 8/10/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/10/2021 Approved DANIEL MC AULIFFE
Piling/Pier/Caisson 8/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 8/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 8/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 8/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 8/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 8/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 8/26/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/26/2021 Approved DANIEL MC AULIFFE
Piling/Pier/Caisson 8/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 8/31/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 9/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Grading 9/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 9/30/2021 Conditional Approval DANIEL MC AULIFFE
Piling/Pier/Caisson 9/30/2021 Partial Approval DANIEL MC AULIFFE
Deputy Grading 10/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 10/4/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 10/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 10/6/2021 Approved DANIEL MC AULIFFE
Piling/Pier/Caisson 10/6/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Grading 10/7/2021 Approved DANIEL MC AULIFFE
Deputy Grading 10/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/18/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/26/2022 Approved DANIEL MC AULIFFE
Piling/Pier/Caisson 1/26/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/1/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/1/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/3/2022 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 2/4/2022 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 2/11/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/14/2022 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 2/22/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/23/2022 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/25/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 2/28/2022 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 3/3/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/3/2022 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 3/4/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/4/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Shotcrete 3/7/2022 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/15/2022 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 3/16/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/5/2022 Conditional Approval DANIEL MC AULIFFE
Special/Order Compliance 4/6/2022 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 4/7/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/11/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/2/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 5/2/2022 Partial Inspection TED RIES
Piling/Pier/Caisson 5/2/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 5/3/2022 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 5/9/2022 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/11/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 5/23/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 5/24/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/3/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 6/6/2022 No Result Entered DANIEL MC AULIFFE
Footing/Foundation/Slab 6/17/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 6/21/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/24/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/11/2022 Partial Approval TED RIES
Green Building Rough 7/11/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/11/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/11/2022 Not Ready for Inspection TED RIES
Excavation/Setback/Form/Re-Bar 7/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/18/2022 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 7/25/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 7/29/2022 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 8/5/2022 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 9/1/2022 Partial Approval TED RIES
Deputy Reinf. Masonry 9/6/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 9/29/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 10/4/2022 Partial Approval TED RIES
Footing/Foundation/Slab 10/19/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 11/30/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/23/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/31/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/22/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/22/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 2/22/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/22/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 2/22/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 4/21/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 5/24/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 6/28/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/8/2023 Partial Approval GREGORY POMISH
Deputy Wood Construction 10/6/2023 Approved DAVID BURKHEAD
Green Building Rough 2/1/2024 Partial Inspection EDWIN GREGORYONA
Insulation 2/1/2024 Partial Approval EDWIN GREGORYONA
Insulation 2/21/2024 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 2/21/2024 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 2/21/2024 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/23/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/1/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 3/1/2024 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 3/1/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 3/5/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/5/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 3/5/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 3/5/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/5/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/5/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 3/6/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/6/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/11/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 3/11/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/11/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/11/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 3/13/2024 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 3/13/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/13/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/13/2024 Partial Inspection JEFFREY FULTON
Insulation 3/15/2024 Partial Approval DAVID BURKHEAD
Green Building Rough 3/19/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 3/19/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/19/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/19/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 3/22/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 3/22/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 3/22/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 3/22/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 4/5/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 4/5/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/5/2024 Partial Approval DAVID BURKHEAD
Insulation 4/22/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/26/2024 Partial Inspection EDWIN GREGORYONA
Insulation 4/26/2024 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 4/26/2024 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 4/30/2024 Partial Inspection JEFFREY FULTON
Insulation 4/30/2024 Partial Inspection JEFFREY FULTON
Deputy Wood Construction 5/6/2024 Conditional Approval RAFAEL CORTES
Insulation 5/6/2024 Partial Approval RAFAEL CORTES
Insulation 5/13/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/7/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/12/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/17/2024 Partial Approval LARRY ARNICK
Drywall Nailing 7/3/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/16/2024 Corrections Issued JEFFREY FULTON
Drywall Nailing 8/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 8/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 8/20/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 8/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 8/29/2024 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 9/3/2024 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 9/11/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/11/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 10/9/2024 Partial Approval DAVID BURKHEAD
Final 2/5/2025 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 2/5/2025 Not Ready for Inspection JEFFREY FULTON
Green Building Final 2/5/2025 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 2/5/2025 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 2/5/2025 Not Ready for Inspection JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 2/5/2025 SGSOV Not Ready JEFFREY FULTON
Smoke Detectors 2/5/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 2/5/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 2/5/2025 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 6/10/2025 Approved DAVID BURKHEAD
Footing/Foundation/Slab 9/25/2025 Not Ready for Inspection JOEY BUCHANAN
Green Building Final 9/25/2025 Approved JOEY BUCHANAN
Green Building Rough 9/25/2025 Approved JOEY BUCHANAN
Reinforced Concrete Frame 9/25/2025 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 9/25/2025 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 9/25/2025 Approved JOEY BUCHANAN
Verify Sprinkler Sign Off 9/25/2025 Approved JOEY BUCHANAN
Wood Frame 9/25/2025 Approved JOEY BUCHANAN
Final 9/26/2025 Partial Inspection EDWIN GREGORYONA
Final 10/16/2025 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/16/2025 Approved DAVID BURKHEAD
Final 10/21/2025 Corrections Issued DAVID BURKHEAD
Drywall Nailing 10/23/2025 Approved DAVID BURKHEAD
Final 10/29/2025 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 10/30/2025 Corrections Issued DAVID BURKHEAD
Final 11/19/2025 Partial Inspection JEFFREY FULTON
Final 11/26/2025 Not Ready for Inspection DAVID BURKHEAD
Final 12/9/2025 Partial Inspection DAVID BURKHEAD
Final 1/2/2026 OK to Issue CofO DAVID BURKHEAD