Permit Issued
Issued on 11/12/2019
Issuing Office
Metro
Current Status
CofO Corrected on 2/7/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/4/2019 APPLICANT
Assigned to Plan Check Engineer 2/21/2019 SAM CHANG
Corrections Issued 2/26/2019 SAM CHANG
Quality Review Completed 3/14/2019 QUAN NGHIEM
Applicant returned to address corrections 4/10/2019 SAM CHANG
Applicant returned to address corrections 4/23/2019 SAM CHANG
Building Plans Picked Up 6/3/2019 APPLICANT
Applicant returned to address corrections 6/14/2019 SAM CHANG
Applicant returned to address corrections 7/25/2019 SAM CHANG
Applicant returned to address corrections 9/11/2019 SAM CHANG
Plan Check Approved 10/15/2019 SAM CHANG
Issued 11/12/2019 LADBS
TCO Issued (Expire Date: 03-29-2022) 9/30/2021 DAVID TSAU
CofO in Progress 12/10/2021 EDWIN GREGORYONA
CofO Issued-Status Void 12/15/2021 ERNESTO CORRAL
Permit Finaled-Status Void 12/15/2021 ERNESTO CORRAL
Re-Activate Permit 2/7/2022 ERNESTO CORRAL
CofO Corrected 2/7/2022 ERNESTO CORRAL
Permit Finaled 2/7/2022 ERNESTO CORRAL

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 6/12/2019 ERIK BEASLEY
Permit Cleared 6/12/2019 ERIK BEASLEY
CPC Cleared 6/14/2019 ANNA VAN
CPC Cleared 6/14/2019 ANNA VAN
CPC Cleared 6/14/2019 ANNA VAN
Community Plan Implem. Overlay Cleared 6/14/2019 EDUARDO HERMOSO
Encroachment in public way Cleared 6/14/2019 ADRIAN SANCHEZ
Hydrant and Access approval Cleared 6/14/2019 GEORGE SUCHAND
Project located in CRA area Cleared 6/14/2019 JIM URQUHART
Project located in CRA area Cleared 6/14/2019 JIM URQUHART
Eng Process Fee Ord 176,300 Cleared 6/20/2019 ELAINE LEI
Highway dedication Cleared 6/20/2019 ELAINE LEI
Prkng lot landscape/Water mgmt Cleared 6/20/2019 BLAYNE SUTTON-WILLS
Sewer availability Cleared 6/20/2019 ELAINE LEI
Trees in Parkway Cleared 6/20/2019 ADRIAN SANCHEZ
Address approval Cleared 9/19/2019 JEANIE LAM
Green Code Cleared 10/3/2019 SAM CHANG
Low Impact Development Cleared 10/4/2019 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 10/4/2019 JEANETTE VONG
"D" conditions Cleared 10/7/2019 KYLE WINSTON
Community Plan Implem. Overlay Cleared 10/7/2019 KYLE WINSTON
ZI Cleared 10/7/2019 KYLE WINSTON
DAS Clearance Cleared 10/8/2019 SAM CHANG
Mechanical Car Lift Cleared 10/8/2019 RONILO MULAWIN
Building over 3-story or 36-ft Cleared 10/10/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/10/2019 CALOSHA APPROVED

Contact Information

Architect Mulcahy,, Kevin Patrick; Lic. No.: C31272 3048 N. COOLIDGE AVENUE      LOS ANGELES, CA 90039
Contractor Kprs Construction Services Inc; Lic. No.: 751130-B 2850 SATURN STREET      BREA, CA 92821
Engineer Smith,, Chris Wayne; Lic. No.: S6106 35 CATAMARAN ST      MARINA DEL REY, CA 90292
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 2/6/2020 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 2/19/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 2/24/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/25/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/25/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 2/25/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 2/26/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 2/26/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/27/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/28/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/28/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 3/5/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 3/6/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/1/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/2/2020 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 4/3/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 4/6/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 4/7/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/5/2020 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/18/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/19/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/19/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/20/2020 Approved LARRY ARNICK
Deputy Reinf. Concrete 5/21/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/3/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 6/4/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/8/2020 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/25/2020 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/2/2020 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/6/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/7/2020 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/9/2020 Corrections Issued LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/4/2020 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/6/2020 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 8/7/2020 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 8/7/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 8/10/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/25/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/25/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/25/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/26/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/26/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/27/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/27/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 8/27/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 9/1/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/1/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 9/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/24/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/24/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 9/25/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/25/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/7/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/7/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/9/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/9/2020 Partial Approval LARRY ARNICK
Pre-Inspection 10/23/2020 Corrections Issued LARRY ARNICK
Deputy Other (see comments) 11/5/2020 Conditional Approval LARRY ARNICK
Wood Frame 11/5/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/10/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 11/10/2020 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 11/13/2020 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/16/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/25/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/30/2020 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/30/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/4/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/9/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/10/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/10/2020 Conditional Approval LARRY ARNICK
Special/Order Compliance 12/10/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/7/2021 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/7/2021 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/14/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/26/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/29/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/1/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/2/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/3/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/4/2021 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 2/4/2021 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/10/2021 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 2/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/17/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/2/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/2/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 3/2/2021 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 3/3/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 3/4/2021 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 3/5/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/12/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/22/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/22/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 3/22/2021 Partial Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/23/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/15/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/15/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/15/2021 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 4/15/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/15/2021 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 4/16/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/27/2021 Partial Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 4/27/2021 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/27/2021 Approved EDWIN GREGORYONA
Wood Frame 4/27/2021 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/6/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/8/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/8/2021 Partial Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/14/2021 Partial Approval EDWIN GREGORYONA
Final 9/17/2021 Not Ready for Inspection MARK FERRARI
Footing/Foundation/Slab 9/17/2021 Not Ready for Inspection MARK FERRARI
Green Building Final 9/17/2021 Not Ready for Inspection MARK FERRARI
Green Building Rough 9/17/2021 Not Ready for Inspection MARK FERRARI
Reinforced Masonry Frame 9/17/2021 Not Ready for Inspection MARK FERRARI
SGSOV-Seismic Gas S/O Valve 9/17/2021 SGSOV Not Ready MARK FERRARI
Smoke Detectors 9/17/2021 Not Ready for Inspection MARK FERRARI
Final 9/30/2021 OK for TCO EDWIN GREGORYONA
Footing/Foundation/Slab 9/30/2021 Approved EDWIN GREGORYONA
Green Building Final 9/30/2021 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 9/30/2021 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 9/30/2021 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 9/30/2021 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 9/30/2021 Approved EDWIN GREGORYONA
Final 11/8/2021 Conditional Approval EDWIN GREGORYONA
Green Building Final 11/8/2021 Approved EDWIN GREGORYONA