14061 W ROSCOE BLVD BUILDING B 91402

Certificate Information: 14061 W ROSCOE BLVD BUILDING B 91402

Application / Permit
19010-10000-00180
Plan Check / Job No.
B19LA00905
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(18) Auditorium (3000 seats max)
Work Description
New performing arts center building (BUILDING B) and associate site work including various landscaping. BUILDING B includes 300-seat theater, stage with fly tower, orchestra pit, theater support spaces, classrooms, and building support spaces.
Permit Issued
Issued on 5/4/2022
Issuing Office
Current Status
Issued on 5/4/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/29/2019 APPLICANT
Assigned to Plan Check Engineer 2/14/2019 MICHAEL PEREZ
Building Plans Picked Up 2/20/2019 APPLICANT
Corrections Issued 3/5/2019 MICHAEL PEREZ
Green Plans Picked Up 3/20/2019 APPLICANT
Quality Review Completed 3/21/2019 QUAN NGHIEM
Applicant returned to address corrections 4/6/2022 ARMEN JIVALAGIAN
Plan Check Approved 4/28/2022 ARMEN JIVALAGIAN
Issued 5/4/2022 APPLICANT

Permit Application Clearance Information

CPC Cleared 6/26/2019 ANNA VAN
Trees in Parkway Cleared 6/26/2019 JOHN KIM
ZA Case Cleared 6/26/2019 ANNA VAN
ZA Case Cleared 6/26/2019 ANNA VAN
ZA Case Cleared 6/26/2019 ANNA VAN
ZA Case Cleared 6/26/2019 ANNA VAN
Permit Cleared 9/10/2021 GABRIEL ROBLES
Site Plan review Cleared 9/14/2021 KENTON TRINH
Internal circulation Cleared 9/22/2021 DURRE SHAMSI
Sewer availability Cleared 9/27/2021 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 11/2/2021 CARLOS AGUILERA
Address approval Cleared 11/23/2021 DAGOVERTO GUERRERO
Hydrant and Access approval Cleared 11/23/2021 MATTHEW CRAIG
Building over 36-ft Cleared 12/29/2021 CALOSHA APPROVED
Highway dedication Cleared 1/19/2022 DAGOVERTO GUERRERO
Low Impact Development Cleared 3/3/2022 ANDRES COVARRUBIAS
DAS Clearance Cleared 3/11/2022 MICHAEL PEREZ
Roof/Waste drainage to street Cleared 3/18/2022 DAGOVERTO GUERRERO
Green Code Cleared 3/21/2022 AARON COSTA
Building over 3-story or 36-ft Cleared 4/6/2022 CALOSHA APPROVED
CPC Cleared 4/11/2022 KENTON TRINH
Certificate of Compliance Cleared 4/11/2022 KENTON TRINH
Frnt yard landscape/Water mgmt Cleared 4/11/2022 KENTON TRINH
Miscellaneous Cleared 4/11/2022 KENTON TRINH
Miscellaneous Cleared 4/11/2022 KENTON TRINH
Prkng lot landscape/Water mgmt Cleared 4/11/2022 KENTON TRINH
Prkng lot landscape/Water mgmt Cleared 4/11/2022 KENTON TRINH
Fire Marshall Fire Life Safety Cleared 4/12/2022 MENOA AGHAJANI

Contact Information

Contractor T G Construction Inc; Lic. No.: 528058-B 139 NEVADA ST      EL SEGUNDO, CA 90245
Engineer Ahmed,, Zafar; Lic. No.: GE2720 113 TOMATO SPRINGS      IRVINE, CA 92618
Engineer Aoanan,, Virgilio Cendana; Lic. No.: C36079 1041 S GARFIELD AVE STE #210      ALHAMBRA, CA 91801
Engineer Fitzgerald,, Shane Scott; Lic. No.: S4757 950 S GRAND AVE 4TH FL      LOS ANGELES, CA 90015

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/8/2022 Approved KENNETH ROBERTS
Footing/Foundation/Slab 6/16/2022 Not Ready for Inspection BRUCE CAMPBELL
Pre-Inspection 6/17/2022 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 6/22/2022 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 6/23/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 6/23/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 6/23/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/24/2022 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 7/11/2022 Partial Approval CAMERON CHABAN
Deputy Reinf. Concrete 7/12/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 7/15/2022 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 7/18/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/19/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/20/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 7/20/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 7/29/2022 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 8/3/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/5/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/8/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 8/15/2022 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 8/22/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/24/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/26/2022 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/30/2022 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 9/13/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 9/13/2022 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 9/14/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/15/2022 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 9/21/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/22/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 9/26/2022 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 10/1/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 10/4/2022 Approved DANNY RODRIGUEZ
Structural Steel Frame 10/4/2022 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 10/6/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/6/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 10/11/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/18/2022 Corrections Issued DANNY RODRIGUEZ
Deputy Steel/Welding 10/19/2022 Approved DANNY RODRIGUEZ
Pre-Inspection 10/19/2022 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/20/2022 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/21/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 10/28/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/28/2022 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/31/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 10/31/2022 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 11/2/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/3/2022 Conditional Approval DANNY RODRIGUEZ
Pre-Inspection 11/3/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/4/2022 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 11/7/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/9/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/10/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/10/2022 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 11/10/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 11/16/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 11/30/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 12/8/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 12/15/2022 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 12/16/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 12/21/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 12/27/2022 Partial Approval DANIEL VARNUM
Footing/Foundation/Slab 1/17/2023 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 1/24/2023 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 1/26/2023 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 1/26/2023 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 1/26/2023 Partial Inspection DEANDRE HOFFMAN
Footing/Foundation/Slab 2/1/2023 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 2/1/2023 Partial Approval STEVEN LEVITT
Deputy Wood Construction 2/3/2023 Conditional Approval DANNY RODRIGUEZ
Special/Order Compliance 2/3/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/6/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/6/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/7/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/7/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 2/7/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/8/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/8/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 2/8/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/9/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/9/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/10/2023 Conditional Approval DANIEL VARNUM
Deputy Reinf. Masonry 2/10/2023 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 2/13/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/13/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 2/13/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/14/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/14/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/15/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/15/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/16/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/16/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 2/16/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/17/2023 Conditional Approval DANIEL VARNUM
Deputy Reinf. Masonry 2/17/2023 Conditional Approval DANIEL VARNUM
Deputy Wood Construction 2/17/2023 Conditional Approval DANIEL VARNUM
Pre-Inspection 2/17/2023 Partial Approval DANIEL VARNUM
Deputy Reinf. Concrete 2/22/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/22/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/23/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 2/23/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 2/23/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/24/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Masonry 2/24/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Masonry 3/2/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 3/2/2023 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 3/2/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/3/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/6/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/6/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/7/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/7/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 3/7/2023 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 3/7/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 3/7/2023 Approved BRIAN KELLY
Deputy Reinf. Concrete 3/8/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/8/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 3/8/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/9/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/9/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 3/10/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/10/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 3/17/2023 Partial Approval CAMERON CHABAN
Reinforced Masonry Frame 3/20/2023 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 3/20/2023 Partial Approval STEVEN LEVITT
Footing/Foundation/Slab 3/28/2023 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 3/28/2023 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 4/3/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/4/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 4/5/2023 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/7/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/10/2023 Conditional Approval RICKEY JACKSON
Masonry Wall/Backfill 4/10/2023 Partial Inspection JEFFREY FULTON
Reinforced Masonry Frame 4/11/2023 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/18/2023 Partial Approval DANIEL VARNUM
Masonry Wall/Backfill 4/18/2023 Partial Approval DANIEL VARNUM
Reinforced Masonry Frame 4/21/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 4/24/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 4/25/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 4/25/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 4/26/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 4/26/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 4/27/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 4/28/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 5/3/2023 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 5/3/2023 Partial Approval STEVEN LEVITT
Pre-Inspection 5/5/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 5/24/2023 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 5/24/2023 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 5/25/2023 Conditional Approval ANDREW DORSO
Pre-Inspection 5/25/2023 Not Ready for Inspection ANDREW DORSO
Reinforced Masonry Frame 5/26/2023 Partial Inspection ANDREW DORSO
Footing/Foundation/Slab 5/31/2023 Partial Inspection ANDREW DORSO
Pre-Inspection 5/31/2023 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 6/1/2023 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 6/2/2023 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 6/13/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 6/13/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 6/15/2023 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/15/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/20/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/20/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/21/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/22/2023 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 6/23/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/26/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 6/27/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 7/6/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/6/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 7/7/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 7/7/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 7/7/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 7/13/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 7/17/2023 Approved DANNY RODRIGUEZ
Structural Steel Frame 7/17/2023 Corrections Issued DANNY RODRIGUEZ
Deputy Drilled-In Anchors 7/18/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 7/19/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 7/20/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/24/2023 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 7/25/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 7/25/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 7/25/2023 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 7/26/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/31/2023 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 7/31/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/1/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 8/3/2023 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 8/3/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/4/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 8/4/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 8/4/2023 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/7/2023 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/8/2023 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/10/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/16/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/28/2023 Approved JOHN KITCKO
Footing/Foundation/Slab 8/28/2023 Partial Approval JOHN KITCKO
Green Building Rough 8/28/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 8/28/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 8/28/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 8/29/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 8/30/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/30/2023 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 8/31/2023 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/1/2023 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/5/2023 Conditional Approval JOHN KITCKO
Masonry Wall/Backfill 9/5/2023 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/6/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/6/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 9/7/2023 Conditional Approval JEFFREY DURAN
Pre-Inspection 9/8/2023 Corrections Issued ANDREW DORSO
Deputy Steel/Welding 9/19/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 9/20/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 9/20/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 9/21/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 9/21/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 9/22/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 9/25/2023 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/25/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 9/26/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 9/28/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 9/29/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/2/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/3/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/3/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/3/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/4/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 10/4/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/5/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/5/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/5/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/6/2023 Approved JOHN KITCKO
Deputy Steel/Welding 10/6/2023 Approved JOHN KITCKO
Deputy Wood Construction 10/6/2023 Approved JOHN KITCKO
Pre-Inspection 10/6/2023 Partial Inspection JOHN KITCKO
Deputy Steel/Welding 10/10/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 10/10/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/11/2023 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 10/11/2023 Partial Approval DANNY RODRIGUEZ
Wall Anchors 10/11/2023 Corrections Issued DANNY RODRIGUEZ
Wood Frame 10/11/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/12/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/13/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/17/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 10/17/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 10/18/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 10/18/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 10/19/2023 Conditional Approval CAMERON CHABAN
Pre-Inspection 10/19/2023 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 10/20/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/23/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/24/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/24/2023 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 10/24/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 10/25/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/26/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/27/2023 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/30/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/30/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 10/31/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/1/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/2/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 11/2/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 11/3/2023 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 11/6/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/7/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/8/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/9/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/14/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/15/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/16/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/17/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Wood Construction 11/17/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 11/17/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 11/20/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/21/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/22/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/28/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/29/2023 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/1/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 12/1/2023 Approved DANNY RODRIGUEZ
Pre-Inspection 12/1/2023 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 12/4/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 12/4/2023 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/4/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/5/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 12/5/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/6/2023 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/6/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/7/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/8/2023 Approved DANNY RODRIGUEZ
Drywall Nailing 12/8/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/12/2023 Approved DANNY RODRIGUEZ
Drywall Nailing 12/12/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/13/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/14/2023 Approved DANNY RODRIGUEZ
Deputy Wood Construction 12/14/2023 Conditional Approval DANNY RODRIGUEZ
Wood Frame 12/14/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/15/2023 Approved DANNY RODRIGUEZ
Wood Frame 12/15/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 12/18/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/19/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/20/2023 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 12/20/2023 Partial Approval DANNY RODRIGUEZ
Wood Frame 12/20/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/21/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/27/2023 Approved DANNY RODRIGUEZ
Insulation 12/27/2023 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 12/28/2023 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/2/2024 Approved DANNY RODRIGUEZ
Drywall Nailing 1/2/2024 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/2/2024 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 1/2/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/3/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/4/2024 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 1/4/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/5/2024 Approved DANNY RODRIGUEZ
Deputy Wood Construction 1/5/2024 Conditional Approval DANNY RODRIGUEZ
Pre-Inspection 1/5/2024 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 1/8/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/9/2024 Conditional Approval KENNETH ROBERTS
Pre-Inspection 1/9/2024 Partial Approval KENNETH ROBERTS
Deputy Steel/Welding 1/10/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/11/2024 Approved DANNY RODRIGUEZ
Pre-Inspection 1/11/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 1/12/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/16/2024 Approved DANNY RODRIGUEZ
Drywall Nailing 1/16/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/17/2024 Approved DANNY RODRIGUEZ
Pre-Inspection 1/17/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 1/18/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/19/2024 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 1/19/2024 Partial Approval DANNY RODRIGUEZ
Wood Frame 1/19/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/23/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/24/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/25/2024 Approved DANNY RODRIGUEZ
Insulation 1/25/2024 Partial Approval DANNY RODRIGUEZ
Wood Frame 1/25/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/26/2024 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 1/26/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 1/29/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/30/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/31/2024 Approved DANNY RODRIGUEZ
Drywall Nailing 1/31/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 2/1/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/2/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/6/2024 Approved DANNY RODRIGUEZ
Drywall Nailing 2/6/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 2/7/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/8/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/9/2024 Conditional Approval KENNETH ROBERTS
Deputy Steel/Welding 2/13/2024 Approved DANNY RODRIGUEZ
Pre-Inspection 2/13/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 2/14/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/15/2024 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 2/15/2024 Corrections Issued DANNY RODRIGUEZ
Deputy Steel/Welding 2/16/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/21/2024 Conditional Approval KENNETH ROBERTS
Drywall Nailing 2/21/2024 Partial Inspection ANDREW DORSO
Wood Frame 2/21/2024 Partial Inspection ANDREW DORSO
Deputy Steel/Welding 2/22/2024 Approved JOHN KITCKO
Deputy Steel/Welding 2/23/2024 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 2/27/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 2/28/2024 Approved DANNY RODRIGUEZ
Pre-Inspection 2/28/2024 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 2/29/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 3/1/2024 Approved DANNY RODRIGUEZ
Deputy Wood Construction 3/1/2024 Conditional Approval DANNY RODRIGUEZ
Insulation 3/1/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 3/8/2024 Approved DANNY RODRIGUEZ
Drywall Nailing 3/8/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 3/12/2024 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 3/12/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 3/13/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 3/14/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 3/15/2024 Approved DANNY RODRIGUEZ
Insulation 3/15/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 3/18/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 3/19/2024 Approved DANNY RODRIGUEZ
Insulation 3/19/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 3/20/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 3/21/2024 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 3/21/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 3/26/2024 Approved DANNY RODRIGUEZ
Deputy Wood Construction 3/26/2024 Approved DANNY RODRIGUEZ
Drywall Nailing 3/26/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 3/27/2024 Approved DANNY RODRIGUEZ
Deputy Wood Construction 3/27/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 3/28/2024 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/29/2024 Partial Approval DANNY RODRIGUEZ
Insulation 3/29/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 4/2/2024 Conditional Approval DANNY RODRIGUEZ
Drywall Nailing 4/2/2024 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 4/2/2024 Partial Approval DANNY RODRIGUEZ
Green Building Rough 4/2/2024 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 4/2/2024 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 4/8/2024 Partial Approval DANNY RODRIGUEZ
Insulation 4/8/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/12/2024 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 4/16/2024 Partial Approval JOHN KITCKO
Insulation 4/22/2024 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 4/22/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/23/2024 Partial Approval DANNY RODRIGUEZ
Insulation 4/23/2024 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 4/23/2024 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 4/26/2024 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 4/26/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/2/2024 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 5/2/2024 Approved DANNY RODRIGUEZ
Interior/Exterior Lathing 5/9/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/10/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/14/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 6/5/2024 Partial Approval GREGORY POMISH
Green Building Rough 7/8/2024 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 7/8/2024 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 7/8/2024 Partial Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 7/8/2024 Partial Inspection DANNY RODRIGUEZ
Wood Frame 7/8/2024 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/11/2024 Approved DANNY RODRIGUEZ
Pre-Inspection 7/11/2024 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 7/17/2024 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 7/29/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/1/2024 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 8/1/2024 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 9/18/2024 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 10/18/2024 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 10/29/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 11/6/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/7/2024 Approved DANNY RODRIGUEZ
Pre-Inspection 11/13/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 11/14/2024 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 11/14/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 11/15/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 11/18/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/19/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 11/20/2024 Approved JOHN KITCKO
Deputy Grading 11/21/2024 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/22/2024 Conditional Approval JOHN KITCKO
Drywall Nailing 12/2/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 12/4/2024 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 12/13/2024 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 12/16/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/17/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/18/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/19/2024 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 12/19/2024 Partial Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 12/20/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/23/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/24/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/26/2024 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 12/27/2024 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 12/30/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/31/2024 Approved DANNY RODRIGUEZ
Structural Steel Frame 12/31/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/3/2025 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/8/2025 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/9/2025 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 1/10/2025 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/13/2025 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 1/14/2025 Approved DANNY RODRIGUEZ
Pre-Inspection 1/16/2025 Partial Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 1/22/2025 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 1/27/2025 Partial Approval DANNY RODRIGUEZ
Wood Frame 1/27/2025 Partial Approval DANNY RODRIGUEZ
Insulation 1/30/2025 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 1/30/2025 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/3/2025 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 2/10/2025 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 2/18/2025 Partial Approval DANNY RODRIGUEZ
Insulation 2/18/2025 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/19/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/21/2025 Conditional Approval DANNY RODRIGUEZ
Drywall Nailing 2/21/2025 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 3/3/2025 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 3/13/2025 Partial Approval GREGORY POMISH
Drywall Nailing 3/20/2025 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 3/24/2025 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 3/26/2025 Partial Approval GREGORY POMISH
Deputy Steel/Welding 4/2/2025 Approved DANNY RODRIGUEZ
Drywall Nailing 4/2/2025 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 4/3/2025 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 4/14/2025 Partial Approval GREGORY POMISH
Pre-Inspection 6/16/2025 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 8/20/2025 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/21/2025 Conditional Approval JEFFREY DURAN
T-Bar Ceiling 12/10/2025 Partial Inspection GREGORY POMISH
Final 5/14/2026 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 5/14/2026 Approved JOHN KITCKO
Green Building Final 5/14/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 5/14/2026 Approved JOHN KITCKO
Reinforced Masonry Frame 5/14/2026 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 5/14/2026 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 5/14/2026 Approved JOHN KITCKO
Verify Sprinkler Sign Off 5/14/2026 Approved JOHN KITCKO
Wood Frame 5/14/2026 Approved JOHN KITCKO
Final 7/13/2026 Not Ready for Inspection JOHN KITCKO
Green Building Final 7/13/2026 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 7/13/2026 SGSOV Approved JOHN KITCKO