1 S LMU DR BUILDING A 90045

Certificate Information: 1 S LMU DR BUILDING A 90045

Application / Permit
19010-10000-00095
Plan Check / Job No.
B19LA00431
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(11) Dormitory
Work Description
New construction of 4-story Type V-A dormitory with common amenity spaces, housing offices, co-living suites, shared bathrooms, and apartments for both faculty and students (Building A).
Permit Issued
Issued on 8/20/2019
Issuing Office
Metro
Current Status
CofO Issued on 12/4/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/14/2019 APPLICANT
Assigned to Plan Check Engineer 1/31/2019 HERNAN ARREOLA
Corrections Issued 2/15/2019 HERNAN ARREOLA
Quality Review Completed 2/25/2019 BILL STUTSMAN
Building Plans Picked Up 2/26/2019 APPLICANT
Applicant returned to address corrections 3/11/2019 HERNAN ARREOLA
Disabled Access Plans Picked Up 3/15/2019 APPLICANT
Applicant returned to address corrections 6/28/2019 HERNAN ARREOLA
Plan Check Approved 8/20/2019 HERNAN ARREOLA
Issued 8/20/2019 LADBS
TCO Issued (Expire Date: 05-05-2021) 11/6/2020 HENRY BAGHDASSARIAN
CofO in Progress 12/3/2020 NICK LAROCCA
Permit Finaled 12/4/2020 HENRY BAGHDASSARIAN
CofO Issued 12/4/2020 HENRY BAGHDASSARIAN
Permit Finaled 12/4/2020 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Hydrant and Access approval Cleared 6/7/2019 JOHN CONNEALLY
Sewer availability Cleared 7/8/2019 ELENA LOPEZ
Miscellaneous Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 7/9/2019 SOPHIE GABEL-SCHEINBAU
Prkng lot landscape/Water mgmt Cleared 7/15/2019 BRIDGETTE WOOTEN
Frnt yard landscape/Water mgmt Cleared 7/16/2019 BRIDGETTE WOOTEN
Site Plan review Cleared 7/16/2019 BRIDGETTE WOOTEN
Specific Plan Cleared 7/17/2019 DAVID TEHRANI
ZI Cleared 7/17/2019 DAVID TEHRANI
Low Impact Development Cleared 7/31/2019 MARTIN FRAGOSO
Specific Plan Cleared 7/31/2019 EDER ROMERO
Address approval Cleared 8/1/2019 KARAN PATEL
Eng Process Fee Ord 176,300 Cleared 8/1/2019 CHRISTOPHER LAW
Highway dedication Cleared 8/1/2019 CHRISTOPHER LAW
DAS Clearance Cleared 8/5/2019 EDDIE GARIN
Green Code Cleared 8/5/2019 KHEDER ALRAZAA
Fire Marshall Fire Life Safety Cleared 8/6/2019 PEJMAN NOORI
Roof/Waste drainage to street Cleared 8/7/2019 ADRIAN SANCHEZ
Permit Cleared 8/8/2019 MAHELET GEBEYHU
Building over 3-story or 36-ft Cleared 8/20/2019 CALOSHA APPROVED
GPI Written Notices Cleared 8/20/2019 HERNAN ARREOLA
Grading Pre-Inspection Cleared 8/20/2019 HERNAN ARREOLA

Contact Information

Architect Patten,, Kimberley; Lic. No.: C31986 817 LOMITA ST.      EL SEGUNDO, CA 90245
Contractor Bernards Bros Inc; Lic. No.: 302007-B 555 FIRST STREET      SAN FERNANDO, CA 91340
Engineer Kim,, Hyun Jin; Lic. No.: GE3106 6412 STANFORD AVENUE      GARDEN GROVE, CA 92845
Engineer Yu,, Philip Junior Davi; Lic. No.: S5854 3828 EARLE AVE      ROSEMEAD, CA 91770

Inspector Information

VASIL MIHALEV, (310) 914-3920 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 8/26/2019 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 8/27/2019 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 8/30/2019 Partial Approval NICK LAROCCA
METHANE-Barrier 8/30/2019 Partial Approval NICK LAROCCA
METHANE-Subgrade 8/30/2019 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 8/30/2019 Not Ready for Inspection NICK LAROCCA
Deputy Methane Barrier 9/5/2019 Approved NICK LAROCCA
Deputy Methane Barrier 9/6/2019 Approved NICK LAROCCA
Deputy Methane Barrier 9/12/2019 Approved NICK LAROCCA
Deputy Methane Barrier 9/13/2019 Approved NICK LAROCCA
Deputy Methane Barrier 9/16/2019 Approved NICK LAROCCA
Footing/Foundation/Slab 9/17/2019 Not Ready for Inspection NICK LAROCCA
METHANE-Barrier 9/17/2019 Approved NICK LAROCCA
METHANE-Subgrade 9/17/2019 Approved NICK LAROCCA
Footing/Foundation/Slab 9/19/2019 Partial Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/20/2019 Partial Approval NICK LAROCCA
Footing/Foundation/Slab 9/25/2019 Partial Inspection NICK LAROCCA
Deputy Reinf. Concrete 9/26/2019 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/27/2019 Approved NICK LAROCCA
Excavation/Setback/Form/Re-Bar 9/27/2019 Partial Approval NICK LAROCCA
Deputy Wood Construction 10/7/2019 Conditional Approval TONY HARTONO
Deputy Wood Construction 10/8/2019 Approved DERRICK SPENCER
Deputy Wood Construction 10/9/2019 Approved DERRICK SPENCER
Deputy Wood Construction 10/10/2019 Approved DERRICK SPENCER
Deputy Wood Construction 10/11/2019 Approved DERRICK SPENCER
Reinforced Concrete Frame 10/11/2019 Partial Approval DERRICK SPENCER
Deputy Wood Construction 10/16/2019 Approved DERRICK SPENCER
Deputy Wood Construction 10/17/2019 Approved DERRICK SPENCER
Deputy Wood Construction 10/18/2019 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 10/21/2019 Partial Approval TONY HARTONO
Deputy Wood Construction 10/22/2019 Approved NICK LAROCCA
Deputy Wood Construction 10/23/2019 Conditional Approval TONY HARTONO
Floor/Roof Diaphrgm/Shear Wall 10/23/2019 Partial Inspection NICK LAROCCA
Green Building Rough 10/23/2019 Approved NICK LAROCCA
METHANE-Rough 10/23/2019 Not Ready for Inspection NICK LAROCCA
Verify Sprinkler Sign Off 10/23/2019 Not Ready for Inspection NICK LAROCCA
Wood Frame 10/23/2019 Partial Inspection NICK LAROCCA
Deputy Wood Construction 10/24/2019 Approved NICK LAROCCA
Deputy Wood Construction 10/25/2019 Approved NICK LAROCCA
METHANE-Rough 10/25/2019 Not Ready for Inspection NICK LAROCCA
Verify Sprinkler Sign Off 10/25/2019 Not Ready for Inspection NICK LAROCCA
Wood Frame 10/25/2019 Partial Approval NICK LAROCCA
Deputy Wood Construction 10/28/2019 Approved NICK LAROCCA
Deputy Wood Construction 10/29/2019 Approved NICK LAROCCA
Insulation 10/29/2019 Partial Approval NICK LAROCCA
Deputy Wood Construction 10/30/2019 Approved NICK LAROCCA
Deputy Wood Construction 10/31/2019 Approved NICK LAROCCA
Deputy Wood Construction 11/1/2019 Approved NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 11/1/2019 Partial Approval NICK LAROCCA
Deputy Wood Construction 11/4/2019 Approved NICK LAROCCA
Deputy Wood Construction 11/5/2019 Approved NICK LAROCCA
Deputy Wood Construction 11/6/2019 Approved NICK LAROCCA
Deputy Wood Construction 11/7/2019 Approved NICK LAROCCA
METHANE-Rough 11/7/2019 Not Ready for Inspection NICK LAROCCA
Verify Sprinkler Sign Off 11/7/2019 Not Ready for Inspection NICK LAROCCA
Wood Frame 11/7/2019 Partial Approval NICK LAROCCA
Deputy Wood Construction 11/8/2019 Approved NICK LAROCCA
Drywall Nailing 11/8/2019 Partial Approval NICK LAROCCA
Structural Steel Frame 11/8/2019 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Partial Approval NICK LAROCCA
Insulation 11/13/2019 Partial Approval NICK LAROCCA
METHANE-Rough 11/13/2019 Not Ready for Inspection NICK LAROCCA
Structural Steel Frame 11/13/2019 Partial Inspection NICK LAROCCA
Verify Sprinkler Sign Off 11/13/2019 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 11/14/2019 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 11/15/2019 Partial Approval TED RIES
Deputy Wood Construction 11/22/2019 Approved NICK LAROCCA
Deputy Wood Construction 11/25/2019 Approved NICK LAROCCA
Special/Order Compliance 11/25/2019 Approved TED RIES
Deputy Wood Construction 11/26/2019 Approved NICK LAROCCA
Deputy Wood Construction 11/27/2019 Approved NICK LAROCCA
Wood Frame 11/27/2019 Not Ready for Inspection NICK LAROCCA
Deputy Wood Construction 12/2/2019 Approved NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Partial Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 12/7/2019 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 12/7/2019 Pending Review
Floor/Roof Diaphrgm/Shear Wall 12/9/2019 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 12/16/2019 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/18/2019 Approved NICK LAROCCA
Deputy Wood Construction 12/18/2019 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/19/2019 Approved NICK LAROCCA
Deputy Wood Construction 12/19/2019 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/20/2019 Approved NICK LAROCCA
Deputy Wood Construction 12/20/2019 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/23/2019 Approved NICK LAROCCA
Deputy Wood Construction 12/23/2019 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/24/2019 Approved NICK LAROCCA
Deputy Wood Construction 12/24/2019 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/30/2019 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/30/2019 Approved NICK LAROCCA
Deputy Wood Construction 12/30/2019 Approved NICK LAROCCA
Deputy Drilled-In Anchors 12/31/2019 Approved NICK LAROCCA
Deputy Reinf. Concrete 12/31/2019 Approved NICK LAROCCA
Deputy Wood Construction 12/31/2019 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/2/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/2/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/2/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/3/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/3/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/3/2020 Approved NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 1/3/2020 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 1/6/2020 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/6/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/6/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/21/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/21/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/22/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/22/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/23/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/23/2020 Approved NICK LAROCCA
Deputy Drilled-In Anchors 1/24/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/24/2020 Approved NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 1/25/2020 Not Ready for Inspection NICK LAROCCA
Deputy Drilled-In Anchors 1/27/2020 Approved NICK LAROCCA
Deputy Wood Construction 1/27/2020 Approved NICK LAROCCA
METHANE-Rough 1/27/2020 Not Ready for Inspection NICK LAROCCA
Verify Sprinkler Sign Off 1/27/2020 Approved NICK LAROCCA
Wood Frame 1/27/2020 Not Ready for Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 1/29/2020 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 2/3/2020 Partial Approval NICK LAROCCA
METHANE-Rough 2/3/2020 Not Ready for Inspection NICK LAROCCA
Wood Frame 2/3/2020 Partial Approval NICK LAROCCA
Deputy Wood Construction 2/4/2020 Approved NICK LAROCCA
Deputy Wood Construction 2/5/2020 Approved NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Not Ready for Inspection NICK LAROCCA
Insulation 2/5/2020 Not Ready for Inspection NICK LAROCCA
Deputy Wood Construction 2/6/2020 Approved NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 2/6/2020 Partial Approval NICK LAROCCA
Insulation 2/6/2020 Partial Approval NICK LAROCCA
Deputy Wood Construction 2/7/2020 Approved NICK LAROCCA
Deputy Wood Construction 2/10/2020 Approved DERRICK SPENCER
Insulation 2/10/2020 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 2/13/2020 Partial Approval NICK LAROCCA
METHANE-Rough 2/13/2020 Not Ready for Inspection NICK LAROCCA
Wood Frame 2/13/2020 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 2/20/2020 Partial Approval NICK LAROCCA
METHANE-Rough 2/24/2020 Approved NICK LAROCCA
Wood Frame 2/24/2020 Partial Approval NICK LAROCCA
Deputy Other (see comments) 2/27/2020 Approved NICK LAROCCA
Deputy Wood Construction 2/27/2020 Approved NICK LAROCCA
Wood Frame 2/27/2020 Partial Approval NICK LAROCCA
Deputy Other (see comments) 2/28/2020 Approved NICK LAROCCA
Deputy Wood Construction 2/28/2020 Approved NICK LAROCCA
Deputy Other (see comments) 3/2/2020 Approved NICK LAROCCA
Deputy Wood Construction 3/2/2020 Approved NICK LAROCCA
Deputy Other (see comments) 3/3/2020 Approved NICK LAROCCA
Deputy Wood Construction 3/3/2020 Approved NICK LAROCCA
Deputy Other (see comments) 3/4/2020 Approved NICK LAROCCA
Deputy Wood Construction 3/4/2020 Approved NICK LAROCCA
Wood Frame 3/6/2020 Partial Approval NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 3/9/2020 Partial Approval NICK LAROCCA
Wood Frame 3/11/2020 Partial Approval NICK LAROCCA
Deputy Wood Construction 3/18/2020 Approved NICK LAROCCA
Deputy Wood Construction 3/19/2020 Approved NICK LAROCCA
Deputy Wood Construction 3/20/2020 Approved NICK LAROCCA
Wood Frame 3/20/2020 Partial Approval NICK LAROCCA
Deputy Wood Construction 3/23/2020 Approved NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 3/23/2020 Partial Approval NICK LAROCCA
Deputy Wood Construction 3/24/2020 Approved NICK LAROCCA
Wood Frame 3/25/2020 Partial Inspection NICK LAROCCA
Floor/Roof Diaphrgm/Shear Wall 3/31/2020 Approved NICK LAROCCA
Wood Frame 3/31/2020 Partial Approval NICK LAROCCA
Wood Frame 4/7/2020 Corrections Issued NICK LAROCCA
Insulation 4/13/2020 Partial Approval NICK LAROCCA
Interior/Exterior Lathing 4/14/2020 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 4/22/2020 Corrections Issued NICK LAROCCA
Light Gage Steel Frame 4/27/2020 Partial Inspection NICK LAROCCA
Interior/Exterior Lathing 5/1/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 5/1/2020 Partial Approval NICK LAROCCA
Interior/Exterior Lathing 5/6/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 5/6/2020 Partial Approval NICK LAROCCA
Wood Frame 5/15/2020 Partial Approval NICK LAROCCA
Interior/Exterior Lathing 5/18/2020 Partial Approval NICK LAROCCA
Drywall Nailing 5/20/2020 Partial Approval NICK LAROCCA
Insulation 5/20/2020 Partial Approval NICK LAROCCA
Wood Frame 5/20/2020 Partial Approval NICK LAROCCA
Insulation 5/28/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 6/17/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 6/26/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 7/2/2020 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 7/7/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 7/7/2020 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/7/2020 Not Ready for Inspection NICK LAROCCA
Footing/Foundation/Slab 7/10/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 7/10/2020 Corrections Issued NICK LAROCCA
Reinforced Concrete Frame 7/10/2020 Approved NICK LAROCCA
Light Gage Steel Frame 7/14/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 7/17/2020 Partial Approval NICK LAROCCA
Reinforced Concrete Frame 7/17/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 7/24/2020 Partial Approval NICK LAROCCA
Wood Frame 7/28/2020 Partial Inspection NICK LAROCCA
Light Gage Steel Frame 7/29/2020 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 7/31/2020 Partial Approval NICK LAROCCA
Footing/Foundation/Slab 8/7/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 8/7/2020 Not Ready for Inspection DERRICK SPENCER
T-Bar Ceiling 8/7/2020 Partial Approval DERRICK SPENCER
T-Bar Ceiling 8/11/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 8/13/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 8/17/2020 Partial Approval NICK LAROCCA
Structural Steel Frame 8/18/2020 Not Ready for Inspection NICK LAROCCA
Light Gage Steel Frame 8/19/2020 Partial Approval DERRICK SPENCER
Special/Order Compliance 8/21/2020 Corrections Issued NICK LAROCCA
Light Gage Steel Frame 8/24/2020 Partial Approval NICK LAROCCA
Deputy Reinf. Concrete 8/25/2020 Approved NICK LAROCCA
Light Gage Steel Frame 8/26/2020 Partial Approval NICK LAROCCA
Light Gage Steel Frame 8/27/2020 Not Ready for Inspection NICK LAROCCA
Deputy Fireproofing 9/17/2020 Approved JOEY BUCHANAN
Deputy Fireproofing 9/18/2020 Approved JOEY BUCHANAN
Deputy Fireproofing 9/21/2020 Approved NICK LAROCCA
Deputy Fireproofing 9/22/2020 Approved NICK LAROCCA
Deputy Fireproofing 9/23/2020 Approved NICK LAROCCA
Drywall Nailing 9/25/2020 Approved NICK LAROCCA
Footing/Foundation/Slab 9/25/2020 Approved NICK LAROCCA
Green Building Final 9/25/2020 Approved NICK LAROCCA
SGSOV-Seismic Gas S/O Valve 9/25/2020 SGSOV Approved NICK LAROCCA
Smoke Detectors 9/25/2020 Approved NICK LAROCCA
T-Bar Ceiling 9/25/2020 Not Ready for Inspection JOEY BUCHANAN
Wood Frame 9/25/2020 Approved NICK LAROCCA
Final 10/1/2020 Not Ready for Inspection NICK LAROCCA
Final 10/6/2020 Corrections Issued NICK LAROCCA
T-Bar Ceiling 10/7/2020 Corrections Issued NICK LAROCCA
Final 10/8/2020 Not Ready for Inspection NICK LAROCCA
Final 10/15/2020 Partial Inspection NICK LAROCCA
T-Bar Ceiling 10/16/2020 Not Ready for Inspection NICK LAROCCA
Final 10/23/2020 OK to Issue CofO NICK LAROCCA