4159 N PALMERO DR 90065
Certificate Information: 4159 N PALMERO DR 90065
- Application / Permit
- 18030-10000-08447
- Plan Check / Job No.
- G18LA00300
- Group
- Building
- Type
- Grading
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (70) Grading - Hillside
- Work Description
- Slope repair-class 2 at rear of lot per Soils engineer's recomdations and Dept. Approval Letter, Log# 97350-01. Cut = 481 Cu. Yds., Fill = 480 Cu. Yds. See permit no. 18020-10000-03723 for Ret/Wall permit at toe of slope.
- Permit Issued
- Issued on 3/4/2020
- Issuing Office
- Metro
- Current Status
- Issued on 3/4/2020
Permit Application Status History
| Submitted | 12/11/2018 | APPLICANT |
| Assigned to Plan Check Engineer | 12/19/2018 | FREDERICK WONG |
| Corrections Issued | 12/19/2018 | FREDERICK WONG |
| Applicant returned to address corrections | 8/8/2019 | DAN RYAN EVANGELISTA |
| Plan Check Approved | 2/27/2020 | DAN RYAN EVANGELISTA |
| Issued | 3/4/2020 | LADBS |
Permit Application Clearance Information
| Eng Process Fee Ord 176,300 | Cleared | 10/8/2019 | EMIL KYUPELYAN |
| Roof/Waste drainage to street | Cleared | 10/8/2019 | EMIL KYUPELYAN |
| Excavation more than 5-ft deep | Cleared | 12/3/2019 | CALOSHA APPROVED |
| Grading Pre-Inspection | Cleared | 12/3/2019 | PATRICK MISCHLICH |
Contact Information
| Contractor | 8a General Construction; Lic. No.: 1020625-B | 11660 EL GRANADA AVE LYNWOOD, CA 90262 |
| Engineer | Hamilton,, John O; Lic. No.: C53284 | P O BOX 866 HAWTHORNE, CA 90251 |
| Engineer | Miller,, Karen Lynn; Lic. No.: GE2257 | 6634 VALJEAN AVE VAN NUYS, CA 91406 |
| Geologist | Van, Meter, James L.; Lic. No.: EG2031 | 6634 VALJEAN AVE VAN NUYS, CA 91406 |
Inspector Information
| JONATHAN HOM, (213) 482-7452 | Office Hours: 7:00-8:00 AM MON-FRI |
| ROBERT HUGHES, (213) 482-7452 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Initial Grading | 7/2/2020 | Corrections Issued | ROBERT HUGHES |
| Excavation | 8/11/2020 | Not Ready for Inspection | ROBERT HUGHES |
| Fill/Backfill | 8/31/2020 | Not Ready for Inspection | ROBERT HUGHES |
| Rough | 9/22/2020 | Not Ready for Inspection | ROBERT HUGHES |
| Sub-Drain | 10/21/2020 | Not Ready for Inspection | ROBERT HUGHES |
| Sub-Drain | 10/28/2020 | Partial Approval | ROBERT HUGHES |
| Approved Compaction Report | 3/23/2021 | Approved | ROBERT HUGHES |
| Bottom/Toe | 5/5/2021 | Approved | ROBERT HUGHES |
| Final | 5/5/2021 | Not Ready for Inspection | ROBERT HUGHES |
| Rough | 5/5/2021 | Not Ready for Inspection | ROBERT HUGHES |
| Drainage Devices/Catch Basin | 5/27/2021 | Partial Approval | ROBERT HUGHES |
| Drainage Devices/Catch Basin | 12/9/2022 | Not Ready for Inspection | ROBERT HUGHES |
| Final | 7/28/2023 | Not Ready for Inspection | ROBERT HUGHES |
| Rough | 7/28/2023 | Not Ready for Inspection | ROBERT HUGHES |
| Drainage Devices/Catch Basin | 5/5/2025 | Partial Approval | RAMAZANALI ALMASI |
| Fill/Backfill | 5/8/2025 | Partial Approval | RAMAZANALI ALMASI |