301 S AVALON BLVD 90744

Certificate Information: 301 S AVALON BLVD 90744

Application / Permit
18030-10000-00680
Plan Check / Job No.
G18LA00022
Group
Building
Type
Grading
Sub-Type
Commercial
Primary Use
(60) Grading - Non-Hillside
Work Description
PROPOSED SITE GRADING FOR A NEW WATERFRONT DEVELOPMENT WHICH INCLUDES A PICNIC PIER, WATERFRONT TIDAL STEPSM, AN ELEVATED URBAN BLUFF AREA, A RESTROOM FACILITY, WALKWAYS, PARKING SPACES AND A ROADWAY. PORT OF LOS ANGELES PROPERTY. CUT = 572 CU. YDS., FILL = 42,500 CU. UYDS., IMPORT = 41,928 CU. YDS.
Permit Issued
Issued on 12/17/2020
Issuing Office
Metro
Current Status
Permit Finaled on 2/25/2025

Permit Application Status History

Submitted 1/31/2018 APPLICANT
Assigned to Plan Check Engineer 2/9/2018 FREDERICK WONG
Corrections Issued 2/9/2018 FREDERICK WONG
Plan Check Approved 4/26/2019 FREDERICK WONG
Issued 12/17/2020 APPLICANT
Permit Finaled 2/21/2025 AL GAMBLE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 5/9/2018 MICHAEL CASTILLO
Grading Pre-Inspection Cleared 5/9/2018 BARTON HOLMES
ZI Cleared 12/18/2018 MOTOUMI SASAKI
Permit Cleared 12/19/2018 NEIL TUANO
Roof/Waste drainage to street Cleared 12/19/2018 NEIL TUANO
Coastal Zone Cleared 4/9/2019 ANNA VAN
Excavation more than 5-ft deep Cleared 4/9/2019 CALOSHA APPROVED
Low Impact Development Cleared 4/15/2019 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 4/15/2019 AMMAR ELTAWIL

Contact Information

Contractor Sully - Miller Contracting Company; Lic. No.: 747612-A 135 SOUTH STATE COLLEGE BLVD   SUITE 400    BREA, CA 92821
Engineer Arulmoli,, Kandiah; Lic. No.: GE2090 27 RESERVE      IRVINE, CA 92603
Engineer Chrisco,, Zachary Philip; Lic. No.: C88497 64 PLEASANT ST      WATERTOWN, MA 02472

Inspector Information

JESUS RODRIGUEZ, (213) 216-1187 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Initial Grading 1/27/2021 Approved KIRK LINKLATER
Initial Grading 2/3/2021 Approved KIRK LINKLATER
Bottom/Toe 3/3/2021 Approved KIRK LINKLATER
Fill/Backfill 1/26/2022 Partial Inspection JONATHAN HOM
Excavation 2/2/2022 Approved VASIL MIHALEV
Excavation 3/9/2022 Partial Inspection JONATHAN HOM
Excavation 3/29/2022 Partial Approval JONATHAN HOM
Excavation 6/13/2022 Partial Inspection MATTHEW JENKINS
Final 12/16/2024 Partial Inspection MATTHEW JENKINS
Rough 12/16/2024 Partial Inspection MATTHEW JENKINS
Approved Compaction Report 2/6/2025 Approved VASIL MIHALEV
Final 2/21/2025 Permit Finaled AL GAMBLE
Rough 2/21/2025 Approved AL GAMBLE