4937 W ELMWOOD AVE 90004

Certificate Information: 4937 W ELMWOOD AVE 90004

Application / Permit
18016-20000-30118
Plan Check / Job No.
B18VN16018
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT THE (E) DUPLEX INTO A (N) SFD. WORK INCLUDES INTERIOR REMODEL TO RECONFIGURE ROOM LAYOUT AND RESTUCCO. ALL WORK PER ENGINEERING
Permit Issued
Issued on 8/17/2021
Issuing Office
Current Status
CofO Issued on 7/26/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/18/2018 APPLICANT
Assigned to Plan Check Engineer 9/18/2018 VLADIMIR ARUTYUNYAN
Corrections Issued 9/18/2018 VLADIMIR ARUTYUNYAN
Applicant returned to address corrections 5/6/2021 OMAR GARNICA
Applicant returned to address corrections 7/6/2021 OMAR GARNICA
Plan Check Approved 7/6/2021 OMAR GARNICA
Building Plans Picked Up 7/9/2021 APPLICANT
Issued 8/17/2021 APPLICANT
CofO in Progress 5/21/2022 SHAVONNE ESPINOZA
Permit Finaled 7/26/2022 DEROLD HAUFF
CofO Issued 7/26/2022 DEROLD HAUFF
Permit Finaled 7/26/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 9/19/2018 EDUARDO PEDROZA
Eng Process Fee Ord 176,300 Cleared 9/19/2018 EDUARDO PEDROZA
Housing rent stabilization Cleared 5/6/2021 RICARDO BOHORQUEZ
Demo/Removal of Rental Units Cleared 6/18/2021 EDWARD JACOBS

Contact Information

Contractor Uppreciation Construction; Lic. No.: 1069986-B 5736 LAS VIRGENES RD #225      CALABASAS, CA 91302
Engineer Tabar,, Mehrdad; Lic. No.: C37433 14252 CULVER DR A349      IRVINE, CA 92604

Inspector Information

JEFFREY MEAD, (213) 202-3240 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 8/24/2021 Not Ready for Inspection ARTHUR SARGSYAN
ELECTRICAL-Rough 8/24/2021 Approved ARTHUR SARGSYAN
Grading Pre-Inspection 8/24/2021 Approved ARTHUR SARGSYAN
HVAC-Rough 8/24/2021 Approved ARTHUR SARGSYAN
Interior/Exterior Lathing 8/24/2021 Partial Approval ARTHUR SARGSYAN
PLUMBING-Rough 8/24/2021 Approved ARTHUR SARGSYAN
BUILDING-Rough-Frame 9/2/2021 Approved ARTHUR SARGSYAN
Insulation 9/2/2021 Approved ARTHUR SARGSYAN
Shower Pan 9/2/2021 Approved ARTHUR SARGSYAN
Wood Frame 9/2/2021 Approved ARTHUR SARGSYAN
Drywall Nailing 9/9/2021 Not Ready for Inspection CHRIS CHRISTENSEN
Interior/Exterior Lathing 9/9/2021 Partial Approval CHRIS CHRISTENSEN
Drywall Nailing 9/15/2021 Approved CHRIS CHRISTENSEN
Gas Test 10/25/2021 Approved JOSEPH MCGARRY
ELECTRICAL-Final 4/1/2022 Not Ready for Inspection CRAIG DAVIS
Final 4/1/2022 Not Ready for Inspection CRAIG DAVIS
HVAC-Final 4/1/2022 Not Ready for Inspection CRAIG DAVIS
PLUMBING-Final 4/1/2022 Not Ready for Inspection CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 4/1/2022 SGSOV Not Ready CRAIG DAVIS
Smoke Detectors 4/1/2022 Approved CRAIG DAVIS
ELECTRICAL-Final 5/4/2022 Corrections Issued SHAVONNE ESPINOZA
Final 5/4/2022 Corrections Issued SHAVONNE ESPINOZA
HVAC-Final 5/4/2022 Corrections Issued SHAVONNE ESPINOZA
PLUMBING-Final 5/4/2022 Corrections Issued SHAVONNE ESPINOZA
SGSOV-Seismic Gas S/O Valve 5/4/2022 SGSOV Approved SHAVONNE ESPINOZA
ELECTRICAL-Final 5/17/2022 Corrections Issued SHAVONNE ESPINOZA
Final 5/17/2022 Not Ready for Inspection SHAVONNE ESPINOZA
HVAC-Final 5/17/2022 Approved SHAVONNE ESPINOZA
PLUMBING-Final 5/17/2022 Approved SHAVONNE ESPINOZA
ELECTRICAL-Final 5/20/2022 Approved SHAVONNE ESPINOZA
Final 5/20/2022 OK to Issue CofO SHAVONNE ESPINOZA