Light Gage Steel Frame
|
11/6/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/6/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
11/9/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Pre-Inspection
|
11/9/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
11/12/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Pre-Inspection
|
11/12/2020
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
11/16/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
11/16/2020
|
Approved
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
11/19/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
11/24/2020
|
Not Ready for Inspection
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
12/1/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
12/1/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Drywall Nailing
|
12/2/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Drywall Nailing
|
12/9/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Drywall Nailing
|
12/11/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
12/11/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
12/11/2020
|
Approved
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
12/15/2020
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
12/16/2020
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
12/22/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Drywall Nailing
|
12/23/2020
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
12/23/2020
|
Not Ready for Inspection
|
ALBERT COMISARI
|
|
Pre-Inspection
|
12/23/2020
|
Conditional Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
12/28/2020
|
Partial Approval
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
1/4/2021
|
Corrections Issued
|
ALBERT COMISARI
|
|
Drywall Nailing
|
1/6/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/6/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/8/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/13/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Pre-Inspection
|
1/13/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Drywall Nailing
|
1/14/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/14/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/15/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Pre-Inspection
|
1/15/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/19/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/20/2021
|
Corrections Issued
|
ALBERT COMISARI
|
|
Pre-Inspection
|
1/20/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
1/21/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
1/21/2021
|
Approved
|
JONATHAN ALLEN
|
|
Drywall Nailing
|
1/26/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
1/28/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
1/28/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
1/29/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
1/29/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
2/4/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
2/9/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
2/9/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
2/11/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
2/11/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
2/17/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
2/17/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
2/17/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
2/19/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
2/19/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
2/24/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
2/24/2021
|
Approved
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
2/24/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
3/2/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
3/2/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Deputy Drilled-In Anchors
|
3/4/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Deputy Steel/Welding
|
3/4/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Deputy Drilled-In Anchors
|
3/5/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/5/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/8/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/8/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/9/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/9/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/10/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/10/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/11/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/11/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/12/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/12/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/16/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Deputy Steel/Welding
|
3/16/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Deputy Drilled-In Anchors
|
3/17/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/17/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
3/17/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
3/17/2021
|
Approved
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/18/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/18/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
3/18/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
3/18/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/19/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/19/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
3/19/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
3/19/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/22/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/22/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Insulation
|
3/23/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Interior/Exterior Lathing
|
3/23/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
3/23/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/24/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/24/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/25/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/25/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
3/26/2021
|
Approved
|
JONATHAN ALLEN
|
|
Deputy Steel/Welding
|
3/26/2021
|
Approved
|
JONATHAN ALLEN
|
|
Deputy Drilled-In Anchors
|
3/31/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Other (see comments)
|
3/31/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
3/31/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
3/31/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
3/31/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/1/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Other (see comments)
|
4/1/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/1/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/5/2021
|
Approved
|
JONATHAN ALLEN
|
|
Deputy Other (see comments)
|
4/5/2021
|
Approved
|
JONATHAN ALLEN
|
|
Deputy Steel/Welding
|
4/5/2021
|
Approved
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
4/5/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Pre-Inspection
|
4/5/2021
|
Partial Approval
|
JONATHAN ALLEN
|
|
Deputy Drilled-In Anchors
|
4/6/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Other (see comments)
|
4/6/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/6/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/6/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/7/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Other (see comments)
|
4/7/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/7/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/8/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/8/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/9/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/9/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/9/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
4/9/2021
|
Approved
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/12/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/12/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/12/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/12/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/13/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/13/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/15/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/15/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/16/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/16/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/19/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/19/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Deputy Steel/Welding
|
4/19/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/19/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Drywall Nailing
|
4/19/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/19/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/20/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/20/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/21/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/21/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/21/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
4/21/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/21/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/22/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/22/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
4/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
4/22/2021
|
Approved
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
4/23/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
4/23/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
4/28/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
4/28/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
5/4/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/4/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/7/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
5/7/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
5/10/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Insulation
|
5/10/2021
|
Conditional Approval
|
ALBERT COMISARI
|
|
Light Gage Steel Frame
|
5/10/2021
|
Partial Approval
|
ALBERT COMISARI
|
|
Drywall Nailing
|
5/12/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
5/12/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/12/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
5/14/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/14/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
5/18/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
5/18/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/18/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/21/2021
|
No Access for Inspection
|
ALAN NOVAK
|
|
Pre-Inspection
|
5/21/2021
|
No Access for Inspection
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/25/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
5/27/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
5/27/2021
|
Approved
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
6/14/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
6/14/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
6/15/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
6/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
6/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
6/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
6/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
6/16/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
6/16/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
6/16/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
6/16/2021
|
Approved
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
6/17/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
6/17/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
6/18/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
6/18/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
6/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
6/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
6/23/2021
|
Approved
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
6/25/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
6/25/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
6/29/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
6/29/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
7/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
7/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
7/12/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
7/14/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
7/14/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
7/15/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
7/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
7/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
7/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
7/28/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
7/28/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
7/29/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Interior/Exterior Lathing
|
7/29/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
7/29/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
8/3/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
8/4/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
8/10/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Interior/Exterior Lathing
|
8/10/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
8/10/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
8/10/2021
|
Approved
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
8/12/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
8/13/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Insulation
|
8/13/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
8/13/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Interior/Exterior Lathing
|
8/17/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
8/17/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
8/20/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Interior/Exterior Lathing
|
8/20/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
8/20/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
8/24/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
8/24/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
8/27/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
8/27/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
8/27/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
9/10/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
9/10/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
9/14/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
9/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
9/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
9/15/2021
|
Approved
|
ALAN NOVAK
|
|
Pre-Inspection
|
9/16/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
9/17/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
9/17/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
9/21/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
9/21/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
9/30/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
9/30/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
10/7/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
10/7/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
10/13/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
10/14/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
10/14/2021
|
Approved
|
ALAN NOVAK
|
|
Pre-Inspection
|
10/22/2021
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
10/25/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
10/25/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
11/2/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
11/2/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
11/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
11/8/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
11/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
11/15/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
11/16/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
11/16/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
11/23/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
11/23/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
11/30/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
11/30/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
12/10/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
12/10/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
12/14/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
12/21/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
12/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Interior/Exterior Lathing
|
12/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
12/22/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
1/5/2022
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
1/12/2022
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
1/12/2022
|
Approved
|
ALAN NOVAK
|
|
Pre-Inspection
|
1/14/2022
|
Approved
|
ALAN NOVAK
|
|
Drywall Nailing
|
1/19/2022
|
Partial Approval
|
JONATHAN ALLEN
|
|
Interior/Exterior Lathing
|
1/19/2022
|
Partial Approval
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
1/19/2022
|
Partial Approval
|
JONATHAN ALLEN
|
|
Drywall Nailing
|
1/20/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Interior/Exterior Lathing
|
1/20/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
1/20/2022
|
Partial Approval
|
JONATHAN ALLEN
|
|
Drywall Nailing
|
1/25/2022
|
Partial Approval
|
JONATHAN ALLEN
|
|
Light Gage Steel Frame
|
1/25/2022
|
Partial Approval
|
JONATHAN ALLEN
|