802 S BROADWAY 90014

Certificate Information: 802 S BROADWAY 90014

Application / Permit
18016-10002-18358
Plan Check / Job No.
B18LA18943
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(21) Theater
Work Description
FOUNDATION ONLY PERMIT. SUPPLEMENTAL TO 18016-10000-18358. CHANGE OF USE FROM THEATER TO RETAIL. TENANT IMPROVMENT FOR A NEW RETAIL STORE AND VOLUNTARY SEISMIC STRENGTHENING OF PORTION OF THE (E) BUILDING.
Permit Issued
Issued on 11/5/2018
Issuing Office
Metro
Current Status
Permit Finaled on 3/19/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/17/2018 APPLICANT
Assigned to Plan Check Engineer 10/17/2018 LARRY LEE
Plan Check Approved 10/17/2018 LARRY LEE
Issued 11/5/2018 LADBS
Permit Finaled 3/18/2021 DANIEL COLLINS

Permit Application Clearance Information

ZA Case Cleared 9/10/2018 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 9/10/2018 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 9/10/2018 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 9/10/2018 SOPHIE GABEL-SCHEINBAU
Eng Process Fee Ord 176,300 Cleared 9/26/2018 JEANETTE VONG
Sewer availability Cleared 9/26/2018 JEANETTE VONG
"Q" conditions Cleared 10/9/2018 MICHAEL SIN
Encroachment in public way Cleared 10/9/2018 KAREN LE
Supp. Use District POD/CDO/TDO Cleared 10/9/2018 MICHAEL SIN
ZI Cleared 10/9/2018 MICHAEL SIN
Fire Marshall Fire Life Safety Cleared 10/11/2018 SUSIE ADAMIAN
City Hist. Cultural Monument Cleared 10/17/2018 LAMBERT GIESSINGER
Historical monument Cleared 10/17/2018 JIM URQUHART
Project located in CRA area Cleared 10/17/2018 JIM URQUHART

Contact Information

Contractor Matt Construction Corporation; Lic. No.: 631020-B 9814 NORWALK BLVD #100      SANTA FE SPRINGS, CA 90670
Engineer , ; Lic. No.: S4905       ,

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/18/2019 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 7/15/2019 Not Ready for Inspection KATY RAMIREZ
Footing/Foundation/Slab 7/16/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/18/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/18/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 7/18/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/19/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/23/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/24/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 7/24/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/26/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/26/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 8/1/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/1/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/6/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 8/6/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 8/7/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 8/7/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/8/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/8/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 8/12/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 8/12/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/13/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/14/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/16/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/16/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 8/22/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 8/22/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/28/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 8/28/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 8/28/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/30/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/4/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/4/2019 Conditional Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 9/5/2019 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 9/5/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/6/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/6/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 9/10/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 9/10/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/13/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/13/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/16/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/16/2019 Approved DANIEL MC AULIFFE
Deputy Shotcrete 9/16/2019 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/16/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/16/2019 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/17/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/17/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/17/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/19/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/19/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 9/19/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 9/19/2019 Conditional Approval DANIEL COLLINS
Piling/Pier/Caisson 9/19/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/20/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/20/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/25/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/25/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/25/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/3/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/3/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/7/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/7/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/7/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/8/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 10/8/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 10/8/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/9/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/11/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/16/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/16/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/16/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 10/16/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 10/16/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/18/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/22/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/31/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/1/2019 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 11/1/2019 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 11/1/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 11/4/2019 Conditional Approval RUSSELL BONVOULOIR
Deputy Shotcrete 11/4/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/4/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/5/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/7/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/7/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/7/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/8/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/8/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/8/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/13/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/13/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/14/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/14/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/15/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/15/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/21/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/22/2019 Conditional Approval RONALD PACHECO
Deputy Shotcrete 11/26/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/26/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/27/2019 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 12/3/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/5/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/6/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/11/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/12/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/13/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/13/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/16/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/19/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/20/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/23/2019 Approved RAFAEL ESPINOZA
Deputy Shotcrete 12/24/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/24/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/6/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/6/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/7/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/7/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/8/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/8/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/9/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/10/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/13/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/14/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/15/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/16/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/17/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/22/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/23/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 1/24/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 2/5/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/6/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/7/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/13/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/14/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 2/18/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/19/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/20/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 2/21/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/21/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/21/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/16/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 3/18/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/19/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/20/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/1/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/2/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/3/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 4/15/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/21/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/24/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/27/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 5/13/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/19/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 5/21/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 5/26/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/2/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/11/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/12/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/15/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/16/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/17/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/19/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/22/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 6/23/2020 Conditional Approval KATY RAMIREZ
Deputy Fireproofing 6/24/2020 Conditional Approval KATY RAMIREZ
Deputy Fireproofing 6/25/2020 Conditional Approval KATY RAMIREZ
Deputy Fireproofing 7/1/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 7/2/2020 Conditional Approval KATY RAMIREZ
Deputy Fireproofing 7/6/2020 Conditional Approval KATY RAMIREZ
Deputy Fireproofing 7/7/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 7/8/2020 Conditional Approval DANIEL COLLINS
Final 7/9/2020 Partial Inspection DANIEL COLLINS
Green Building Final 7/9/2020 Partial Inspection DANIEL COLLINS
Smoke Detectors 7/9/2020 Partial Inspection DANIEL COLLINS
Deputy Steel/Welding 9/30/2020 Conditional Approval DANIEL COLLINS
Final 3/18/2021 Permit Finaled DANIEL COLLINS
Green Building Final 3/18/2021 Approved DANIEL COLLINS
Smoke Detectors 3/18/2021 Approved DANIEL COLLINS