1546 S FAIRFAX AVE 90019

Certificate Information: 1546 S FAIRFAX AVE 90019

Application / Permit
18016-10000-41166
Plan Check / Job No.
B18LA27803
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH 93. INSTALL 1 (N) OMF.
Permit Issued
Issued on 8/24/2022
Issuing Office
Metro
Current Status
CofC Issued on 5/9/2024

Permit Application Status History

Submitted 12/27/2018 APPLICANT
Assigned to Plan Check Engineer 1/31/2019 CHUNG-WEN CHUANG
Corrections Issued 2/6/2019 CHUNG-WEN CHUANG
Quality Review Completed 2/11/2019 HANS SANTIAGO
Plan Check Approved 4/30/2019 CHUNG-WEN CHUANG
Issued 8/24/2022 APPLICANT
OK for CofC 2/6/2024 DARRYL ARNOLD
CofC Issued 5/9/2024 WINSTON DUNNING

Permit Application Clearance Information

Miscellaneous Cleared 4/10/2019 SOPHIE GABEL-SCHEINBAU
Housing rent stabilization Cleared 7/15/2022 RICARDO BOHORQUEZ

Contact Information

Contractor American Retrofitters Corp; Lic. No.: 1020382-B 15643 SHERMAN WAY STE 220      VAN NUYS, CA 91406
Engineer Ebrahimian, Dehaghani, Mahdi; Lic. No.: C86987 8730 COSTA VERDE BLVD APT 2348      SAN DIEGO, CA 92122

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/19/2022 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 10/12/2022 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 11/22/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 11/28/2022 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 11/28/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 12/6/2022 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 12/6/2022 Approved BRUCE CAMPBELL
Wood Frame 12/6/2022 Approved BRUCE CAMPBELL
Deputy Reinf. Concrete 12/9/2022 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 12/21/2022 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 12/23/2022 Approved VAHE KELEDJIAN
Final 6/2/2023 Not Ready for Inspection DARRYL ARNOLD
METHANE-Final 6/2/2023 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 6/2/2023 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 6/2/2023 Conditional Approval DARRYL ARNOLD
Final 2/6/2024 OK for CofC DARRYL ARNOLD
METHANE-Final 2/6/2024 Approved DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 2/6/2024 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 2/6/2024 Approved DARRYL ARNOLD