518 W 75TH ST 90044

Certificate Information: 518 W 75TH ST 90044

Application / Permit
18016-10000-38675
Plan Check / Job No.
B18LA25837
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT-STORY SEISMIC RETROFIT PER LAMC DIVISION 93. INSTALLATION OF 4 SPECIAL CANTILEVERED COLUMN SYSTEM (SCCS) & 1 ORDINARY MOMENT FRAME WITH CONCRETE GRADE BEAM. WORKS AT TUCK-UNDER PARKING AREAS, NOT ON TENANTS' UNITS.
Permit Issued
Issued on 10/7/2020
Issuing Office
Current Status
CofC Issued on 6/30/2021

Permit Application Status History

Submitted 12/3/2018 APPLICANT
Assigned to Plan Check Engineer 1/17/2019 ERWIN PASCUA
Corrections Issued 1/20/2019 ERWIN PASCUA
Quality Review Completed 1/23/2019 MARJAN SHENASI
Building Plans Picked Up 1/29/2019 APPLICANT
Applicant returned to address corrections 5/17/2019 ERWIN PASCUA
Plan Check Approved 6/26/2019 ERWIN PASCUA
Issued 10/7/2020 APPLICANT
OK for CofC 6/23/2021 MARK FERRARI
CofC Issued 6/30/2021 WINSTON DUNNING

Permit Application Clearance Information

Project located in CRA area Cleared 5/28/2019 JIM URQUHART
ZI Cleared 6/13/2019 ANNA VAN
ZI Cleared 6/13/2019 ANNA VAN
Housing rent stabilization Cleared 9/1/2020 MICHAEL SOTO

Contact Information

Contractor Misong Corporation; Lic. No.: 755122-B 936 S ALVARADO STREET      LOS ANGELES, CA 90006
Engineer Farmand,, Anthony E; Lic. No.: C62595 2372 MORSE AVE STE 137      IRVINE, CA 92614

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/26/2020 Approved DARRYL ARNOLD
Deputy Drilled-In Anchors 12/21/2020 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 1/6/2021 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 1/8/2021 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 1/8/2021 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 1/14/2021 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 1/15/2021 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 1/15/2021 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 1/19/2021 Approved JOEY BUCHANAN
Wood Frame 3/30/2021 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/9/2021 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 4/13/2021 Approved JOEY BUCHANAN
Footing/Foundation/Slab 4/13/2021 Approved JOEY BUCHANAN
Structural Steel Frame 4/13/2021 Partial Approval JOEY BUCHANAN
Wood Frame 4/13/2021 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/15/2021 Approved JOEY BUCHANAN
Floor/Roof Diaphrgm/Shear Wall 4/26/2021 Corrections Issued JOEY BUCHANAN
Floor/Roof Diaphrgm/Shear Wall 5/3/2021 Not Ready for Inspection DARRYL ARNOLD
Floor/Roof Diaphrgm/Shear Wall 5/4/2021 Approved JOEY BUCHANAN
Interior/Exterior Lathing 5/10/2021 Approved DARRYL ARNOLD
Final 5/26/2021 Conditional Approval DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 5/26/2021 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 5/26/2021 Conditional Approval DARRYL ARNOLD
Final 6/2/2021 Corrections Issued MARK FERRARI
SGSOV-Seismic Gas S/O Valve 6/2/2021 SGSOV Approved MARK FERRARI
Smoke Detectors 6/2/2021 Not Ready for Inspection MARK FERRARI
Final 6/23/2021 OK for CofC MARK FERRARI
Smoke Detectors 6/23/2021 Approved MARK FERRARI