920 N EL CENTRO AVE 1-9 90038

Certificate Information: 920 N EL CENTRO AVE 1-9 90038

Application / Permit
18016-10000-38587
Plan Check / Job No.
B18LA25766
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH. 93 USING STEEL CANTILEVER COLUMN
Permit Issued
Issued on 3/4/2022
Issuing Office
Current Status
CofC Issued on 6/8/2022

Permit Application Status History

Submitted 11/30/2018 APPLICANT
Assigned to Plan Check Engineer 12/27/2018 HANS SANTIAGO
Corrections Issued 12/31/2018 HANS SANTIAGO
Quality Review Completed 1/2/2019 SAI KHUM
Building Plans Picked Up 1/4/2019 APPLICANT
Plan Check Approved 1/23/2019 Andrew Santiago
Issued 3/4/2022 APPLICANT
OK for CofC 6/7/2022 DARRYL ARNOLD
CofC Issued 6/8/2022 WINSTON DUNNING

Permit Application Clearance Information

Housing rent stabilization Cleared 2/18/2022 ISMAEL HERNANDEZ

Contact Information

Contractor R L G Construction; Lic. No.: 1023091-B 5730 LA MIRADA AVENUE      LOS ANGELES, CA 90038
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 1950 SAWTELLE BLVD STE 175      LOS ANGELES, CA 90025

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/24/2022 Approved BRUCE CAMPBELL
Deputy Drilled-In Anchors 3/30/2022 Conditional Approval BRUCE CAMPBELL
Excavation/Setback/Form/Re-Bar 4/5/2022 Approved BRUCE CAMPBELL
Wood Frame 4/5/2022 Approved BRUCE CAMPBELL
Interior/Exterior Lathing 4/8/2022 Corrections Issued BRUCE CAMPBELL
Final 4/21/2022 Not Ready for Inspection BRUCE CAMPBELL
METHANE-Final 4/21/2022 Approved BRUCE CAMPBELL
SGSOV-Seismic Gas S/O Valve 4/21/2022 SGSOV Not Ready BRUCE CAMPBELL
Smoke Detectors 4/21/2022 Approved BRUCE CAMPBELL
Final 6/7/2022 OK for CofC DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 6/7/2022 SGSOV Approved DARRYL ARNOLD