7021 W HOLLYWOOD BLVD 90028

Certificate Information: 7021 W HOLLYWOOD BLVD 90028

Application / Permit
18016-10000-38210
Plan Check / Job No.
B18LA25436
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(4) Health Club
Work Description
<<SHELL & CORE>>(1) MAJOR REMODEL TO EXISTING COMMERCIAL BLDG.(BOTH STRUCTURAL & ARCHTECTURAL) (2)NEW PKG LAYOUT, NEW STAIRS, ESCALATOR, NEW ELEVATORS,EXPANSION OF LOADING DOCK <<ANY CHANGE OF USE & TENANT IMPROVEMENT UNDER SEPARATED PERMIT>>
Permit Issued
Issued on 6/21/2019
Issuing Office
Metro
Current Status
CofO Issued on 8/20/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/27/2018 APPLICANT
Assigned to Plan Check Engineer 12/13/2018 DEAN LEE
Green Plans Picked Up 1/17/2019 APPLICANT
Corrections Issued 1/25/2019 DEAN LEE
Quality Review Completed 1/29/2019 BILL STUTSMAN
Building Plans Picked Up 1/30/2019 APPLICANT
Disabled Access Plans Picked Up 1/30/2019 APPLICANT
Applicant returned to address corrections 3/6/2019 DEAN LEE
Applicant returned to address corrections 3/20/2019 DEAN LEE
Applicant returned to address corrections 3/21/2019 DEAN LEE
Applicant returned to address corrections 4/9/2019 DEAN LEE
Applicant returned to address corrections 4/30/2019 DEAN LEE
Applicant returned to address corrections 5/17/2019 DEAN LEE
Plan Check Approved 6/17/2019 DEAN LEE
Issued 6/21/2019 LADBS
CofO in Progress 8/19/2020 EDWIN GREGORYONA
Permit Finaled 8/20/2020 ERNESTO CORRAL
CofO Issued 8/20/2020 ERNESTO CORRAL
Permit Finaled 8/20/2020 ERNESTO CORRAL

Permit Application Clearance Information

"D" conditions Cleared 3/6/2019 JOE LUCKEY
City Hist. Cultural Monument Cleared 3/6/2019 MELISSA JONES
Historic monument Cleared 3/6/2019 MELISSA JONES
ZA Case Cleared 3/6/2019 JOE LUCKEY
ZI Cleared 3/6/2019 JOE LUCKEY
ZI Cleared 3/6/2019 JOE LUCKEY
Project located in CRA area Cleared 3/8/2019 JIM URQUHART
DAS Clearance Cleared 4/8/2019 ELIZABETH TOMS
Green Code Cleared 4/8/2019 NEGAR NEJAD
Fire Marshall Fire Life Safety Cleared 5/1/2019 WILLIAM JOHNS
Miscellaneous Cleared 5/1/2019 WILLIAM JOHNS

Contact Information

Architect Malak,, Hany; Lic. No.: C27490 360 PINE TREE LANE      MONROVIA, CA 91016
Contractor Layton Construction Co Inc; Lic. No.: 795238-B 9090 SOUTH SANDY PARKWAY      SANDY, UT 84070
Engineer Jeon,, Eung Jin; Lic. No.: GE3096 209 MAYFAIR      IRVINE, CA 92620
Engineer Schroeder,, Mark Ernest; Lic. No.: S4110 16969 VON KARMAN AVE 240      IRVINE, CA 92606

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/11/2019 Approved EDWIN GREGORYONA
Pre-Inspection 11/6/2019 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 11/7/2019 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/8/2019 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/12/2019 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/14/2019 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/14/2019 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/15/2019 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/19/2019 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/21/2019 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/22/2019 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/2/2019 Conditional Approval RONALD PACHECO
Deputy Steel/Welding 12/3/2019 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/6/2019 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/12/2019 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/30/2019 Conditional Approval GRANT WOODS
Deputy Drilled-In Anchors 1/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/13/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/15/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/15/2020 No Access for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/16/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/17/2020 Partial Inspection EDWIN GREGORYONA
Insulation 1/17/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/21/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/23/2020 Partial Inspection EDWIN GREGORYONA
Insulation 1/23/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 1/23/2020 Partial Inspection EDWIN GREGORYONA
Deputy Fireproofing 1/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/27/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/27/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/28/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/31/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/31/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/31/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/31/2020 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 1/31/2020 Not Ready for Inspection EDWIN GREGORYONA
Deputy Fireproofing 2/3/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/6/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/10/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/10/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/10/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/10/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/11/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/12/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/13/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/13/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 2/13/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 2/14/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/20/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/20/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/20/2020 Partial Inspection EDWIN GREGORYONA
Deputy Fireproofing 2/21/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/25/2020 Partial Approval EDWIN GREGORYONA
Pre-Inspection 2/25/2020 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 2/25/2020 Partial Inspection EDWIN GREGORYONA
Deputy Fireproofing 2/27/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/28/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/28/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/3/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/3/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/5/2020 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 3/5/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/5/2020 Partial Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/5/2020 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 3/5/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 3/5/2020 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/5/2020 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/6/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/9/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 3/10/2020 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 3/11/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/11/2020 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 3/12/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/12/2020 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 3/13/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/13/2020 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 3/16/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/18/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/18/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/18/2020 Partial Inspection EDWIN GREGORYONA
Green Building Rough 3/18/2020 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/18/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 3/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/20/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/23/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/23/2020 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/24/2020 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/24/2020 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/24/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 3/25/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/25/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/26/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/27/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/27/2020 Partial Approval EDWIN GREGORYONA
Structural Steel Frame 3/27/2020 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/28/2020 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 3/28/2020 Partial Approval DANIEL VARNUM
Footing/Foundation/Slab 3/28/2020 Off-Hour Fees Due
Footing/Foundation/Slab 3/28/2020 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 3/30/2020 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 3/30/2020 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 3/31/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/31/2020 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 3/31/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/1/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/1/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 4/1/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/2/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/3/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/3/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 4/6/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/6/2020 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 4/6/2020 Partial Inspection EDWIN GREGORYONA
Insulation 4/6/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 4/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/7/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/8/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/9/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/10/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/10/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/10/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/10/2020 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/10/2020 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/13/2020 Order to Comply Issued EDWIN GREGORYONA
Deputy Steel/Welding 4/13/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/13/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/14/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/15/2020 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 4/15/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/15/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/15/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 4/15/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 4/16/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/16/2020 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 4/16/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 4/16/2020 Partial Inspection EDWIN GREGORYONA
T-Bar Ceiling 4/16/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 4/17/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/20/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/20/2020 Partial Inspection EDWIN GREGORYONA
Deputy Other (see comments) 4/21/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/21/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/22/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/22/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/22/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/22/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/22/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/22/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/23/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/23/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/23/2020 Corrections Issued EDWIN GREGORYONA
Deputy Steel/Welding 4/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/27/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/28/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/28/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/28/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/29/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/29/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 4/30/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/1/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/1/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/1/2020 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/1/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/1/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 5/1/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/4/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/4/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/5/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/5/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/5/2020 Partial Inspection EDWIN GREGORYONA
Insulation 5/5/2020 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 5/5/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/5/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/6/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/6/2020 Partial Inspection EDWIN GREGORYONA
Green Building Rough 5/6/2020 Approved EDWIN GREGORYONA
Interior/Exterior Lathing 5/6/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/6/2020 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 5/6/2020 Partial Approval EDWIN GREGORYONA
Wall Anchors 5/6/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 5/7/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/7/2020 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/7/2020 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/8/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/8/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 5/8/2020 Partial Inspection EDWIN GREGORYONA
Deputy Fireproofing 5/11/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/11/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/12/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/12/2020 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 5/12/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 5/12/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/13/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/13/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/13/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 5/13/2020 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 5/14/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/14/2020 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/14/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/15/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/15/2020 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 5/15/2020 Partial Inspection EDWIN GREGORYONA
Final 5/18/2020 Not Ready for Inspection EDWIN GREGORYONA
Green Building Final 5/18/2020 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/18/2020 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 5/18/2020 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 5/18/2020 Not Ready for Inspection EDWIN GREGORYONA
Deputy Steel/Welding 5/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/20/2020 Partial Approval EDWIN GREGORYONA
Final 5/20/2020 Partial Inspection EDWIN GREGORYONA
Green Building Final 5/20/2020 Approved EDWIN GREGORYONA
Smoke Detectors 5/20/2020 Approved EDWIN GREGORYONA
Deputy Steel/Welding 5/21/2020 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/21/2020 Approved EDWIN GREGORYONA
Deputy Steel/Welding 5/22/2020 Partial Approval EDWIN GREGORYONA
Insulation 5/22/2020 Approved EDWIN GREGORYONA
Interior/Exterior Lathing 5/22/2020 Approved EDWIN GREGORYONA
Deputy Steel/Welding 5/26/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/27/2020 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 5/28/2020 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 5/29/2020 Conditional Approval LANNY MERRICK
Final 6/9/2020 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 6/11/2020 Partial Inspection EDWIN GREGORYONA
Pre-Inspection 6/15/2020 Partial Inspection EDWIN GREGORYONA
Pre-Inspection 7/8/2020 Approved EDWIN GREGORYONA
Final 7/31/2020 Conditional Approval EDWIN GREGORYONA