5022 N RIVERTON AVE 91601

Certificate Information: 5022 N RIVERTON AVE 91601

Application / Permit
18016-10000-37340
Plan Check / Job No.
B18LA24812
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH. 93 USING STEEL CANTILEVER COLUMNS AND WOOD SHEAR WALL .
Permit Issued
Issued on 8/5/2020
Issuing Office
Current Status
CofC Issued on 12/17/2020

Permit Application Status History

Submitted 11/16/2018 APPLICANT
Assigned to Plan Check Engineer 12/28/2018 HERNAN ARREOLA
Corrections Issued 1/8/2019 HERNAN ARREOLA
Quality Review Completed 1/14/2019 SAI KHUM
Building Plans Picked Up 1/24/2019 APPLICANT
Applicant returned to address corrections 5/8/2019 HERNAN ARREOLA
Plan Check Approved 6/24/2019 HERNAN ARREOLA
No Progress 3/7/2020 HERNAN ARREOLA
Plan Check Approved 7/6/2020 ANDREW SANTIAGO
Issued 8/5/2020 APPLICANT
OK for CofC 11/20/2020 JOE VELASQUEZ
CofC Issued 12/17/2020 JEFFREY DURAN

Permit Application Clearance Information

Project located in CRA area Cleared 6/6/2019 JIM URQUHART
Redevelopment Project Area Cleared 6/1/2020 DAVID URITA
Historic Resource Verification Cleared 6/24/2020 MICAELA TORRES-GIL
Housing rent stabilization Cleared 7/30/2020 PHILLIP MUNGUIA

Contact Information

Contractor Retrofitting360 Inc; Lic. No.: 1039226-B 19562 VENTURA BLVD# 230      TARZANA, CA 91356
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/3/2020 Not Ready for Inspection JOE VELASQUEZ
Deputy Drilled-In Anchors 9/10/2020 No Access for Inspection JOE VELASQUEZ
Deputy Wood Construction 9/16/2020 No Access for Inspection JOE VELASQUEZ
Reinforced Concrete Frame 9/16/2020 Not Ready for Inspection JOE VELASQUEZ
Structural Steel Frame 9/16/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 9/16/2020 Not Ready for Inspection JOE VELASQUEZ
Reinforced Concrete Frame 9/22/2020 Corrections Issued JOE VELASQUEZ
Structural Steel Frame 9/22/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 9/22/2020 Not Ready for Inspection JOE VELASQUEZ
Deputy Wood Construction 10/7/2020 No Access for Inspection JOE VELASQUEZ
Reinforced Concrete Frame 10/7/2020 Approved JOE VELASQUEZ
Structural Steel Frame 10/7/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 10/7/2020 Not Ready for Inspection JOE VELASQUEZ
Footing/Foundation/Slab 10/8/2020 Not Ready for Inspection JOE VELASQUEZ
Reinforced Concrete Frame 10/8/2020 Not Ready for Inspection JOE VELASQUEZ
Structural Steel Frame 10/8/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 10/8/2020 Partial Approval JOE VELASQUEZ
Structural Steel Frame 10/13/2020 Not Ready for Inspection RONALD PACHECO
Wood Frame 10/13/2020 Not Ready for Inspection RONALD PACHECO
Structural Steel Frame 10/14/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 10/14/2020 Partial Approval JOE VELASQUEZ
Reinforced Concrete Frame 10/16/2020 Not Ready for Inspection JOE VELASQUEZ
Structural Steel Frame 10/16/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 10/16/2020 Partial Approval JOE VELASQUEZ
Deputy Wood Construction 10/19/2020 Conditional Approval JONATHAN QUACH
Reinforced Concrete Frame 10/21/2020 Not Ready for Inspection JOE VELASQUEZ
Structural Steel Frame 10/21/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 10/21/2020 Partial Approval JOE VELASQUEZ
Wood Frame 10/26/2020 Approved JOE VELASQUEZ
Reinforced Concrete Frame 10/27/2020 No Access for Inspection EDWIN GREGORYONA
Structural Steel Frame 10/27/2020 No Access for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 11/2/2020 Not Ready for Inspection JOE VELASQUEZ
Interior/Exterior Lathing 11/5/2020 Approved JOE VELASQUEZ
Final 11/20/2020 OK for CofC JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 11/20/2020 SGSOV Approved JOE VELASQUEZ
Smoke Detectors 11/20/2020 Approved JOE VELASQUEZ