920 W BLOOM WALK 90089

Certificate Information: 920 W BLOOM WALK 90089

Application / Permit
18016-10000-35075
Plan Check / Job No.
B18LA23150
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(18) College
Work Description
PROPOSED TENANT IMPROVEMENT & CHANGE OF USE FROM LIBRARY TO CLASSROOMS/WORKSHOPS. THESE CLASSROOMS ARE PART OF THE USC CAMPUS, ADD CANOPIES OVER ENTRANCES. THE TRENCH SHORING ADJACENT TO THE EXISITNG BUILDING IS A DEFERRED SUBMITTAL/PERMIT (NO EXCAVATIONS PRIOR TO APPRVL OF SHORING)
Permit Issued
Issued on 5/22/2019
Issuing Office
Metro
Current Status
CofO Issued on 12/24/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/13/2018 APPLICANT
Assigned to Plan Check Engineer 11/20/2018 JOHN VASQUEZ
Green Plans Picked Up 11/28/2018 APPLICANT
Disabled Access Plans Picked Up 11/29/2018 APPLICANT
Corrections Issued 12/3/2018 JOHN VASQUEZ
Quality Review Completed 12/3/2018 CHARLES CHANG
Building Plans Picked Up 12/10/2018 APPLICANT
Applicant returned to address corrections 3/5/2019 JOHN VASQUEZ
Applicant returned to address corrections 3/19/2019 JOHN VASQUEZ
Applicant returned to address corrections 5/9/2019 JOHN VASQUEZ
Plan Check Approved 5/14/2019 JOHN VASQUEZ
Issued 5/22/2019 LADBS
TCO Issued (Expire Date: 02-24-2021) 8/28/2020 DAVID TSAU
CofO in Progress 12/14/2020 LEOPOLDO MENDOZA
CofO in Progress 12/14/2020 LEOPOLDO MENDOZA
CofO Issued 12/24/2020 ERNESTO CORRAL
Permit Finaled 12/24/2020 ERNESTO CORRAL

Permit Application Clearance Information

Sewer availability Cleared 1/8/2019 STEVE MELGAR
Historic monument Cleared 1/17/2019 LAMBERT GIESSINGER
Historical monument Cleared 1/18/2019 JIM URQUHART
Project located in CRA area Cleared 1/18/2019 JIM URQUHART
Specific Plan Cleared 1/18/2019 KYLE WINSTON
Metro Rail approval Cleared 1/22/2019 JOHN VASQUEZ
Hydrant and Access approval Cleared 2/6/2019 GEORGE SUCHAND
DAS Clearance Cleared 2/7/2019 SHINE LIN
Eng Process Fee Ord 176,300 Cleared 2/19/2019 ELAINE LEI
Green Code Cleared 2/20/2019 KHEDER ALRAZAA
Low Impact Development Cleared 5/9/2019 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 5/9/2019 ELAINE LEI

Contact Information

Architect Fisher,, Frederick Burt; Lic. No.: C10281 12248 SANTA MONICA BLVD      LOS ANGELES, CA 90025
Contractor Snyder Langston Llc; Lic. No.: 1019188-B 17962 COWAN      IRVINE, CA 92614
Engineer Eisenreich,, Stephan; Lic. No.: C77781 29163 VALLEY OAK PLACE      SANTA CLARITA, CA 91390
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205

Inspector Information

PAUL BAZERKANIAN, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
LUIS CCAMACHO, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
ALAN MORELOS, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 7/24/2019 Approved JOEY BUCHANAN
Footing/Foundation/Slab 7/24/2019 Approved JOEY BUCHANAN
Green Building Rough 8/7/2019 Approved JOEY BUCHANAN
METHANE-Rough 8/7/2019 Approved JOEY BUCHANAN
Reinforced Concrete Frame 8/7/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 9/11/2019 Corrections Issued JOEY BUCHANAN
Footing/Foundation/Slab 9/24/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 9/24/2019 Corrections Issued JOEY BUCHANAN
Deputy Steel/Welding 12/13/2019 Approved JOEY BUCHANAN
T-Bar Ceiling 1/3/2020 Approved JOEY BUCHANAN
Pre-Inspection 3/13/2020 Partial Inspection RUSSELL BONVOULOIR
Pre-Inspection 3/18/2020 Not Ready for Inspection LEOPOLDO MENDOZA
Light Gage Steel Frame 4/23/2020 Partial Approval LEOPOLDO MENDOZA
Final 8/21/2020 Not Ready for Inspection LEOPOLDO MENDOZA
Green Building Final 8/21/2020 Not Ready for Inspection LEOPOLDO MENDOZA
SGSOV-Seismic Gas S/O Valve 8/21/2020 SGSOV Approved LEOPOLDO MENDOZA
Smoke Detectors 8/21/2020 Approved LEOPOLDO MENDOZA
Final 11/9/2020 Not Ready for Inspection LEOPOLDO MENDOZA
Green Building Final 11/9/2020 Approved LEOPOLDO MENDOZA
Final 12/8/2020 OK to Issue CofO LEOPOLDO MENDOZA