6701 W WARING AVE 90038

Certificate Information: 6701 W WARING AVE 90038

Application / Permit
18016-10000-34840
Plan Check / Job No.
B18LA23024
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LAMC DIVISION 93. RETROFIT CONSISTS OF INSTALLING (4) NEW ORDINARY MOMENT FRAME TO EXISTING 2-STORY APARTMENT BUILDING
Permit Issued
Issued on 12/17/2020
Issuing Office
Current Status
CofC Issued on 2/1/2023

Permit Application Status History

Submitted 10/26/2018 APPLICANT
Assigned to Plan Check Engineer 12/6/2018 EUGENE BARBEAU
Corrections Issued 12/11/2018 EUGENE BARBEAU
Quality Review Completed 12/14/2018 SAI KHUM
Building Plans Picked Up 12/27/2018 APPLICANT
Plan Check Approved 5/21/2019 EUGENE BARBEAU
Issued 12/17/2020 APPLICANT
OK for CofC 2/1/2023 VAHE KELEDJIAN
CofC Issued 2/1/2023 WINSTON DUNNING

Permit Application Clearance Information

Housing rent stabilization Cleared 4/15/2019 DAN HAECKER

Contact Information

Contractor Steve Construction; Lic. No.: 943272-B 15150 HIAWATHA ST      MISSION HILLS, CA 91345
Engineer Kim,, Hosang; Lic. No.: C67288 10632 BALCOM AVE      GRANADA HILLS, CA 91344

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/3/2021 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 3/9/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 3/10/2021 Conditional Approval JONATHAN QUACH
Pre-Inspection 3/10/2021 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 3/11/2021 Conditional Approval JONATHAN QUACH
Wood Frame 3/18/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Drilled-In Anchors 3/22/2021 Approved MARK FERRARI
Reinforced Concrete Frame 3/22/2021 Corrections Issued MARK FERRARI
Wood Frame 3/22/2021 Conditional Approval MARK FERRARI
Reinforced Concrete Frame 3/26/2021 Corrections Issued MARK FERRARI
Footing/Foundation/Slab 3/31/2021 Conditional Approval DARRYL ARNOLD
Wood Frame 4/6/2021 Partial Approval JONATHAN QUACH
Insulation 4/8/2021 Partial Approval JONATHAN QUACH
Interior/Exterior Lathing 4/8/2021 Partial Approval JONATHAN QUACH
Footing/Foundation/Slab 7/22/2022 Conditional Approval DARRYL ARNOLD
Pre-Inspection 7/22/2022 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 9/9/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 9/9/2022 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 9/9/2022 Approved BRUCE CAMPBELL
Wood Frame 10/26/2022 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 11/1/2022 Approved DARRYL ARNOLD
Final 11/4/2022 Not Ready for Inspection DARRYL ARNOLD
METHANE-Final 11/4/2022 Approved DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 11/4/2022 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 11/4/2022 Conditional Approval DARRYL ARNOLD
Final 12/7/2022 Not Ready for Inspection VAHE KELEDJIAN
Smoke Detectors 12/7/2022 Approved VAHE KELEDJIAN
Final 2/1/2023 OK for CofC VAHE KELEDJIAN