11681 W GORHAM AVE 90049

Certificate Information: 11681 W GORHAM AVE 90049

Application / Permit
18016-10000-32854
Plan Check / Job No.
B18LA21654
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
VERIFY EXISTING BLDG PREVIOUSLY RETROFITTED UNDER PERMIT NUMBER 13016-10000-06999 MEETS REQUIREMENTS FOR SOFT STORY RETROFIT AS PER LABC CH. 93. (N) WOOD SHEAR WALL AND FOUNDATION UPGRADE.
Permit Issued
Issued on 9/3/2020
Issuing Office
Metro
Current Status
CofC Issued on 9/26/2024

Permit Application Status History

Submitted 10/10/2018 APPLICANT
Assigned to Plan Check Engineer 11/20/2018 VARAND SARKISIAN
Corrections Issued 11/28/2018 VARAND SARKISIAN
Quality Review Completed 11/30/2018 HANS SANTIAGO
Building Plans Picked Up 12/4/2018 APPLICANT
Plan Check Approved 5/16/2019 VARAND SARKISIAN
Issued 9/3/2020 APPLICANT
OK for CofC 9/24/2024 GRANT WOODS
CofC Issued 9/26/2024 DAVID TSAU

Permit Application Clearance Information

Housing rent stabilization Cleared 7/20/2020 STEVEN HOFSTAD

Contact Information

Contractor Alpha Structural Inc; Lic. No.: 663409-B 8334 FOOTHILL BLVD      SUNLAND, CA 91040
Engineer Wong,, Kelly King-Chum; Lic. No.: S2114 1057 17TH ST      SANTA MONICA, CA 90403

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 9/14/2020 Not Ready for Inspection JOHN DODGE
Pre-Inspection 9/14/2020 Not Ready for Inspection JOHN DODGE
Excavation/Setback/Form/Re-Bar 9/15/2020 Not Ready for Inspection JOHN DODGE
Pre-Inspection 9/15/2020 Not Ready for Inspection JOHN DODGE
Wood Frame 9/15/2020 Not Ready for Inspection JOHN DODGE
Excavation/Setback/Form/Re-Bar 9/21/2020 Approved JOHN DODGE
Pre-Inspection 9/21/2020 Approved JOHN DODGE
Wood Frame 9/21/2020 Partial Approval JOHN DODGE
Deputy Reinf. Concrete 9/29/2020 Conditional Approval GRANT WOODS
Deputy Wood Construction 10/1/2020 Conditional Approval JOHN DODGE
Wood Frame 10/1/2020 Not Ready for Inspection JOHN DODGE
Deputy Wood Construction 10/2/2020 Conditional Approval GRANT WOODS
Interior/Exterior Lathing 11/20/2020 Approved RUSSELL BONVOULOIR
Final 5/31/2022 Partial Inspection GRANT WOODS
SGSOV-Seismic Gas S/O Valve 5/31/2022 SGSOV Not Ready GRANT WOODS
Smoke Detectors 5/31/2022 Approved GRANT WOODS
Final 9/24/2024 OK for CofC GRANT WOODS
METHANE-Final 9/24/2024 Approved GRANT WOODS
SGSOV-Seismic Gas S/O Valve 9/24/2024 SGSOV Approved GRANT WOODS