1402 S BENTLEY AVE 1-8 90025

Certificate Information: 1402 S BENTLEY AVE 1-8 90025

Application / Permit
18016-10000-29393
Plan Check / Job No.
B18LA19413
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH 93. USING SCCS + WOOD SHEAR WALL.
Permit Issued
Issued on 5/21/2020
Issuing Office
Metro
Current Status
CofC Issued on 2/17/2022

Permit Application Status History

Submitted 9/11/2018 APPLICANT
Assigned to Plan Check Engineer 10/4/2018 DEAN RYAN REYES
Corrections Issued 10/9/2018 DEAN RYAN REYES
Quality Review Completed 10/11/2018 CELESTE MORRIS
Building Plans Picked Up 10/24/2018 APPLICANT
Applicant returned to address corrections 12/11/2018 DEAN RYAN REYES
Plan Check Approved 1/2/2019 DEAN RYAN REYES
Issued 5/21/2020 LADBS
OK for CofC 2/15/2022 GRANT WOODS
CofC Issued 2/17/2022 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Housing rent stabilization Cleared 5/5/2020 PHILLIP MUNGUIA

Contact Information

Contractor Alpha Structural Inc; Lic. No.: 663409-B 8334 FOOTHILL BLVD      SUNLAND, CA 91040
Engineer Erich, J Axsom; Lic. No.: S4435       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/1/2021 Approved GRANT WOODS
Deputy Steel/Welding 11/3/2021 Conditional Approval GRANT WOODS
Excavation/Setback/Form/Re-Bar 11/12/2021 Approved PAUL DAVIDSON
Wood Frame 11/12/2021 Not Ready for Inspection PAUL DAVIDSON
Deputy Reinf. Concrete 11/15/2021 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 11/16/2021 Conditional Approval PAUL DAVIDSON
Deputy Wood Construction 11/17/2021 Conditional Approval GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 11/24/2021 Not Ready for Inspection PAUL DAVIDSON
Wood Frame 11/24/2021 Corrections Issued PAUL DAVIDSON
Wood Frame 11/29/2021 Approved GRANT WOODS
Deputy Wood Construction 12/3/2021 Approved GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 12/3/2021 Approved GRANT WOODS
Interior/Exterior Lathing 12/17/2021 Approved PAUL DAVIDSON
Final 1/28/2022 Not Ready for Inspection PAUL DAVIDSON
METHANE-Final 1/28/2022 Approved PAUL DAVIDSON
SGSOV-Seismic Gas S/O Valve 1/28/2022 SGSOV Not Ready PAUL DAVIDSON
Smoke Detectors 1/28/2022 Approved PAUL DAVIDSON
Final 2/9/2022 No Access for Inspection PAUL DAVIDSON
SGSOV-Seismic Gas S/O Valve 2/9/2022 SGSOV Approved PAUL DAVIDSON
Final 2/15/2022 OK for CofC GRANT WOODS