8561 N DE SOTO AVE 91304

Certificate Information: 8561 N DE SOTO AVE 91304

Application / Permit
18016-10000-24947
Plan Check / Job No.
B18LA16207
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CHAPTER 93. INSTALL 7 IMF
Permit Issued
Issued on 1/7/2020
Issuing Office
Metro
Current Status
CofC Issued on 2/9/2021

Permit Application Status History

Submitted 8/3/2018 APPLICANT
Assigned to Plan Check Engineer 9/13/2018 MONICA RAMIREZ
Corrections Issued 9/17/2018 MONICA RAMIREZ
Quality Review Completed 9/20/2018 SAI KHUM
Building Plans Picked Up 10/19/2018 APPLICANT
Applicant returned to address corrections 1/22/2019 MONICA RAMIREZ
Plan Check Approved 1/31/2019 MONICA RAMIREZ
Issued 1/7/2020 LADBS
OK for CofC 2/9/2021 JONATHAN QUACH
CofC Issued 2/9/2021 ERNESTO CORRAL

Permit Application Clearance Information

Housing rent stabilization Cleared 1/6/2020 CHARLES GARCIA

Contact Information

Contractor American Retrofitters Corp; Lic. No.: 1020382-B 15643 SHERMAN WAY STE 220      VAN NUYS, CA 91406
Engineer Lau, David Harkwong; Lic. No.: C34961 12467 W WASHINGTON BLVD      LOS ANGELES, CA 90066

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/26/2020 Partial Inspection DANIEL VARNUM
Deputy Drilled-In Anchors 6/2/2020 Conditional Approval KENNETH ROBERTS
Deputy Steel/Welding 6/2/2020 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 6/4/2020 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 6/4/2020 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 6/5/2020 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 6/5/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 6/8/2020 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 6/8/2020 Conditional Approval KENNETH ROBERTS
Deputy Steel/Welding 6/9/2020 Conditional Approval KENNETH ROBERTS
Deputy Drilled-In Anchors 6/10/2020 Conditional Approval KENNETH ROBERTS
Deputy Drilled-In Anchors 6/15/2020 Conditional Approval VAHE KELEDJIAN
Deputy Reinf. Concrete 6/16/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 6/18/2020 Conditional Approval KENNETH ROBERTS
Footing/Foundation/Slab 6/19/2020 Not Ready for Inspection DANIEL VARNUM
Structural Steel Frame 6/19/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 6/19/2020 Not Ready for Inspection DANIEL VARNUM
Deputy Reinf. Concrete 6/25/2020 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 6/25/2020 Conditional Approval DANIEL VARNUM
Footing/Foundation/Slab 6/26/2020 Approved DANIEL VARNUM
Deputy Reinf. Concrete 6/29/2020 Conditional Approval KENNETH ROBERTS
Structural Steel Frame 6/30/2020 Approved DANIEL VARNUM
Wood Frame 6/30/2020 Approved DANIEL VARNUM
Interior/Exterior Lathing 7/16/2020 Approved VAHE KELEDJIAN
Final 9/2/2020 Not Ready for Inspection DANIEL VARNUM
SGSOV-Seismic Gas S/O Valve 9/2/2020 SGSOV Approved DANIEL VARNUM
Smoke Detectors 9/2/2020 Approved DANIEL VARNUM
Final 2/9/2021 OK for CofC JONATHAN QUACH