6226 N CRANER AVE 91606

Certificate Information: 6226 N CRANER AVE 91606

Application / Permit
18016-10000-24110
Plan Check / Job No.
B18LA15598
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LABC CHAPTER 93. INSTALL 3 (N) SCCS.
Permit Issued
Issued on 8/11/2020
Issuing Office
Current Status
CofC Issued on 4/26/2021

Permit Application Status History

Submitted 7/27/2018 APPLICANT
Assigned to Plan Check Engineer 9/6/2018 GEORGE ALVAREZ
Corrections Issued 9/10/2018 GEORGE ALVAREZ
Quality Review Completed 9/13/2018 SAI KHUM
Building Plans Picked Up 9/21/2018 APPLICANT
Plan Check Approved 2/19/2020 GEORGE ALVAREZ
No Progress 2/19/2020 GEORGE ALVAREZ
Plan Check Approved 2/19/2020 GEORGE ALVAREZ
Issued 8/11/2020 APPLICANT
OK for CofC 3/22/2021 KENNETH ROBERTS
CofC Issued 4/26/2021 RICKEY JACKSON

Permit Application Clearance Information

Housing rent stabilization Cleared 6/4/2020 PHILLIP MUNGUIA

Contact Information

Contractor Biayna Corp; Lic. No.: 998853-B 9751 WHEATLAND AVE      SUNLAND, CA 91040
Engineer Biayna, Engineering & Construction; Lic. No.: S6232 9751 WHEATLAND AVE      LOS ANGELES, CA 91040

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/18/2020 Not Ready for Inspection JOE VELASQUEZ
Deputy Drilled-In Anchors 9/10/2020 No Access for Inspection JOE VELASQUEZ
Excavation/Setback/Form/Re-Bar 9/10/2020 Approved JOE VELASQUEZ
Structural Steel Frame 9/10/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 9/10/2020 Not Ready for Inspection JOE VELASQUEZ
Deputy Reinf. Concrete 9/16/2020 No Access for Inspection JOE VELASQUEZ
Structural Steel Frame 12/10/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 12/10/2020 Corrections Issued JOE VELASQUEZ
Structural Steel Frame 12/17/2020 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 12/17/2020 Corrections Issued JOE VELASQUEZ
Structural Steel Frame 12/23/2020 Approved DANIEL VARNUM
Wood Frame 12/23/2020 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 1/13/2021 Approved JOE VELASQUEZ
Final 2/24/2021 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 2/24/2021 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 2/24/2021 Not Ready for Inspection JOE VELASQUEZ
Final 3/22/2021 OK for CofC KENNETH ROBERTS
SGSOV-Seismic Gas S/O Valve 3/22/2021 SGSOV Approved KENNETH ROBERTS
Smoke Detectors 3/22/2021 Approved KENNETH ROBERTS