Excavation/Setback/Form/Re-Bar
|
6/23/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2021
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
7/2/2021
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
7/14/2021
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
7/15/2021
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
7/20/2021
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2021
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
7/28/2021
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
7/28/2021
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
7/30/2021
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Pre-Inspection
|
3/8/2022
|
Approved
|
JOHN DODGE
|
|
Pre-Inspection
|
4/11/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
4/27/2022
|
Conditional Approval
|
JOHN DODGE
|
|
Excavation/Setback/Form/Re-Bar
|
5/5/2022
|
Corrections Issued
|
JOHN DODGE
|
|
Deputy Reinf. Concrete
|
5/10/2022
|
Conditional Approval
|
JOHN DODGE
|
|
Deputy Drilled-In Anchors
|
5/18/2022
|
Conditional Approval
|
JOHN DODGE
|
|
Excavation/Setback/Form/Re-Bar
|
5/19/2022
|
Partial Inspection
|
JOHN DODGE
|
|
Deputy Reinf. Concrete
|
5/26/2022
|
Conditional Approval
|
JOHN DODGE
|
|
Light Gage Steel Frame
|
5/26/2022
|
Partial Approval
|
DAVID TSAU
|
|
METHANE-Rough
|
5/26/2022
|
Not Ready for Inspection
|
DAVID TSAU
|
|
Wood Frame
|
5/26/2022
|
Partial Approval
|
DAVID TSAU
|
|
Deputy Drilled-In Anchors
|
6/10/2022
|
Approved
|
NICK LAROCCA
|
|
Light Gage Steel Frame
|
6/13/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
6/17/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
7/7/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
7/21/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
7/21/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
7/22/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Insulation
|
9/6/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
9/6/2022
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Final
|
10/21/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
METHANE-Final
|
10/21/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
METHANE-Rough
|
10/21/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
10/21/2022
|
SGSOV Not Ready
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
10/21/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
10/21/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Final
|
11/10/2022
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
METHANE-Final
|
11/10/2022
|
Approved
|
SORIN CIRSTOIU
|
|
METHANE-Rough
|
11/10/2022
|
Approved
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
11/10/2022
|
SGSOV Not Ready
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
11/10/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
11/10/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Final
|
11/22/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
11/22/2022
|
SGSOV Not Ready
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
11/22/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
11/22/2022
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Final
|
3/21/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
3/21/2023
|
SGSOV Not Ready
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
3/21/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
3/21/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Final
|
3/30/2023
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
3/30/2023
|
SGSOV Not Ready
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
3/30/2023
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
3/30/2023
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Final
|
5/1/2023
|
OK to Issue CofO
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
5/1/2023
|
SGSOV Approved
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
5/1/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Wood Frame
|
5/1/2023
|
Approved
|
SORIN CIRSTOIU
|