700 S MAIN ST 90014

Certificate Information: 700 S MAIN ST 90014

Application / Permit
18016-10000-20981
Plan Check / Job No.
B18LA13354
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
CHANGE OF USE FROM (E) RETAIL, ACCESSORY OFFICE/STORAGE TO RETAIL, ASSEMBLY, AND OFFICE. (CORE & SHELL) (E) 4 STORY WITH BASEMENT URM BUILDING.
Permit Issued
Issued on 8/12/2019
Issuing Office
Metro
Current Status
Issued on 8/12/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/9/2018 APPLICANT
Assigned to Plan Check Engineer 7/26/2018 LARRY LEE
Corrections Issued 7/31/2018 LARRY LEE
Quality Review Completed 8/2/2018 CHARLES CHANG
Building Plans Picked Up 8/13/2018 APPLICANT
Applicant returned to address corrections 8/29/2018 LARRY LEE
Applicant returned to address corrections 10/16/2018 LARRY LEE
Applicant returned to address corrections 3/14/2019 LARRY LEE
Plan Check Approved 8/8/2019 LARRY LEE
Issued 8/12/2019 LADBS

Permit Application Clearance Information

"D" conditions Cleared 1/4/2019 DIANA JIMENEZ
"Q" conditions Cleared 1/4/2019 DIANA JIMENEZ
Eng Process Fee Ord 176,300 Cleared 1/4/2019 JEANETTE VONG
City Hist. Cultural Monument Cleared 4/30/2019 LAMBERT GIESSINGER
Comm Cor/Mini-Mall Cleared 4/30/2019 SOPHIE GABEL-SCHEINBAU
DAS Clearance Cleared 4/30/2019 SHINE LIN
DAS Clearance Cleared 4/30/2019 SHINE LIN
Green Code Cleared 4/30/2019 DONALD CRICHLOW
Food Service Establishment Cleared 5/3/2019 RAMESHBHAIR PATEL
Building over 3-story or 36-ft Cleared 5/7/2019 CALOSHA APPROVED
Sewer availability Cleared 5/7/2019 ADRIAN SANCHEZ
Historical monument Cleared 6/13/2019 JIM URQUHART
Project located in CRA area Cleared 6/13/2019 JIM URQUHART
Fire Marshall Fire Life Safety Cleared 8/6/2019 WILLIAM JOHNS

Contact Information

Architect Liljegren,, Karin J; Lic. No.: C28158 600 CRANE BLVD      LOS ANGELES, CA 90065
Contractor Swinerton Builders; Lic. No.: 92-B 260 TOWNSEND ST 5TH FL LEGAL      SAN FRANCISCO, CA 94107
Engineer Esmaily-Radvar,, Shahrokh; Lic. No.: GE2742 5 HODGENVILLE      IRVINE, CA 92620
Engineer Fischer,, Kurt Mark; Lic. No.: S5432 PO BOX 809      POWAY, CA 92074

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 8/26/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/31/2019 Conditional Approval DANIEL COLLINS
Pre-Inspection 11/13/2019 Partial Inspection DANIEL COLLINS
Deputy Reinf. Concrete 12/2/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/3/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/5/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/6/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/16/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/17/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/18/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/19/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/20/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 12/23/2019 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/8/2020 Partial Approval DANIEL COLLINS
Piling/Pier/Caisson 1/8/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 1/10/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/13/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/14/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/15/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/16/2020 Conditional Approval DANIEL COLLINS
Pre-Inspection 1/16/2020 Partial Inspection DANIEL COLLINS
Deputy Reinf. Concrete 1/17/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/17/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/21/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/21/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/22/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/23/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/24/2020 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 1/24/2020 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/28/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/29/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/30/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/31/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/4/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/5/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/6/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 2/6/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/7/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/12/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/13/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/14/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/19/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/20/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/21/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 2/21/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/25/2020 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 2/25/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/26/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/27/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/28/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 2/28/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/11/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/12/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 3/12/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/13/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/16/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 3/17/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/18/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/19/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/20/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/24/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 3/24/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/25/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/26/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/27/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 3/27/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/31/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/1/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/6/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/7/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 4/7/2020 Partial Approval DANIEL COLLINS
Deputy Shotcrete 4/15/2020 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 4/20/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 4/28/2020 Partial Approval DANIEL COLLINS
Special/Order Compliance 4/30/2020 Partial Inspection DANIEL COLLINS
Drywall Nailing 5/5/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 5/5/2020 Partial Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 5/5/2020 Approved DANIEL COLLINS
Light Gage Steel Frame 5/5/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 5/18/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 5/20/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 5/27/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 5/28/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 6/4/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 6/4/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 6/11/2020 Partial Approval DANIEL COLLINS
Wood Frame 6/11/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/17/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/17/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 6/17/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/18/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/18/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/19/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/19/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 6/22/2020 Partial Inspection DANIEL COLLINS
Deputy Wood Construction 6/23/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/24/2020 Conditional Approval JONATHAN QUACH
Deputy Wood Construction 6/24/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 6/25/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 6/26/2020 Conditional Approval KATY RAMIREZ
Drywall Nailing 6/29/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 6/29/2020 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 6/30/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/6/2020 Conditional Approval RUSSELL BONVOULOIR
Deputy Wood Construction 7/10/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 7/13/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 7/13/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 7/20/2020 Partial Approval DANIEL COLLINS
Deputy Wood Construction 7/21/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/28/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/29/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/30/2020 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/31/2020 Conditional Approval LANNY MERRICK
Wood Frame 7/31/2020 Not Ready for Inspection LANNY MERRICK
Light Gage Steel Frame 8/4/2020 Partial Approval DANIEL COLLINS
Wood Frame 8/4/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 8/5/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/7/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/7/2020 Conditional Approval DANIEL COLLINS
Wood Frame 8/7/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 8/10/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/11/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 8/11/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 8/11/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 8/12/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/13/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 8/14/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/8/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/15/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/18/2020 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 9/21/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 9/22/2020 Conditional Approval DANIEL COLLINS
Pre-Inspection 10/5/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/13/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 10/19/2020 Partial Approval KATY RAMIREZ
Drywall Nailing 10/23/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 10/23/2020 Partial Approval DANIEL COLLINS
Structural Steel Frame 10/23/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 10/26/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/28/2020 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/29/2020 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/30/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 11/5/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 11/5/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 11/13/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 11/13/2020 Partial Approval DANIEL COLLINS
Deputy Wood Construction 11/30/2020 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 12/1/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/2/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/4/2020 Conditional Approval LANNY MERRICK
Drywall Nailing 12/8/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 12/8/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 1/20/2021 Conditional Approval DANIEL COLLINS
Drywall Nailing 1/20/2021 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 1/20/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 1/20/2021 Partial Approval DANIEL COLLINS
Structural Steel Frame 1/20/2021 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 1/21/2021 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/26/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 2/4/2021 Partial Approval DANIEL COLLINS
Insulation 2/4/2021 Partial Approval DANIEL COLLINS
Wood Frame 2/4/2021 Partial Approval DANIEL COLLINS
Deputy Wood Construction 2/8/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/17/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 2/23/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/3/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/9/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/11/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/12/2021 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 3/18/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/19/2021 Conditional Approval DANIEL COLLINS
Interior/Exterior Lathing 3/22/2021 Partial Approval DANIEL COLLINS
Structural Steel Frame 3/22/2021 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 4/1/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 4/5/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/8/2021 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 4/8/2021 Partial Approval DANIEL COLLINS
Structural Steel Frame 4/8/2021 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 4/9/2021 Conditional Approval KATY RAMIREZ
Deputy Wood Construction 4/13/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/15/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/16/2021 Conditional Approval DANIEL COLLINS
Drywall Nailing 5/5/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 5/5/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 7/23/2021 Partial Approval DANIEL COLLINS
Pre-Inspection 2/7/2023 Partial Inspection KATY RAMIREZ
Final 1/23/2024 Not Ready for Inspection KATY RAMIREZ
Green Building Final 1/23/2024 Approved KATY RAMIREZ
Green Building Rough 1/23/2024 Approved KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 1/23/2024 SGSOV Not Ready KATY RAMIREZ
Smoke Detectors 1/23/2024 Approved KATY RAMIREZ
Special/Order Compliance 1/24/2024 Corrections Issued KATY RAMIREZ
Reinforced Masonry Frame 1/30/2024 Partial Approval KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 1/30/2024 SGSOV No Gas KATY RAMIREZ
Special/Order Compliance 1/30/2024 Partial Approval KATY RAMIREZ
Special/Order Compliance 2/1/2024 Partial Inspection KATY RAMIREZ
Special/Order Compliance 2/2/2024 Corrections Issued KATY RAMIREZ
Final 2/14/2024 Partial Inspection KATY RAMIREZ
Reinforced Masonry Frame 2/14/2024 Approved KATY RAMIREZ