747 S CURSON AVE 90036
Certificate Information: 747 S CURSON AVE 90036
- Application / Permit
- 18016-10000-20974
- Plan Check / Job No.
- B18LA13345
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- SOFT STORY RETROFIT PER LABC CHAPTER 93. INSTALL 6 CANTILEVER COLUMNS. (Installation of four columns at south elevation and two columns at east elevation; all to be finished in stucco to match existing in color and texture. Any exterior alterations at the areas of retrofit work shall be replaced in-kind to match the existing exterior of the structure in material, color, and texture. There shall be no other alterations to existing structure(s), landscape, or hardscape.)
- Permit Issued
- Issued on 7/10/2020
- Issuing Office
- Current Status
- CofC Issued on 10/20/2020
Permit Application Status History
| Submitted | 6/29/2018 | APPLICANT |
| Assigned to Plan Check Engineer | 8/16/2018 | MONICA RAMIREZ |
| Corrections Issued | 8/21/2018 | MONICA RAMIREZ |
| Quality Review Completed | 8/23/2018 | SAI KHUM |
| Building Plans Picked Up | 9/7/2018 | APPLICANT |
| Applicant returned to address corrections | 1/15/2019 | MONICA RAMIREZ |
| Applicant returned to address corrections | 3/19/2019 | MONICA RAMIREZ |
| Plan Check Approved | 5/6/2019 | MONICA RAMIREZ |
| Issued | 7/10/2020 | APPLICANT |
| OK for CofC | 8/26/2020 | DARRYL ARNOLD |
| CofC Issued | 10/20/2020 | TERRY HERR |
Permit Application Clearance Information
| HPOZ | Cleared | 4/30/2019 | CHRISTINA PARK |
| Housing rent stabilization | Cleared | 6/18/2020 | MICHAEL SOTO |
Contact Information
| Contractor | Zebra Construction Inc; Lic. No.: 1055609-B | 145 S FAIRFAX STE 200/300 LOS ANGELES, CA 90036 |
| Engineer | Roberts, Jeffrey Allan; Lic. No.: C56881 | 9925 COMMERCE AVENUE SUITE B TUJUNGA, CA 91042 |
Inspector Information
| DARRYL ARNOLD, (213) 482-0341 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 7/16/2020 | Partial Approval | DARRYL ARNOLD |
| Deputy Other (see comments) | 8/4/2020 | Approved | DARRYL ARNOLD |
| Excavation/Setback/Form/Re-Bar | 8/6/2020 | Conditional Approval | DARRYL ARNOLD |
| Footing/Foundation/Slab | 8/6/2020 | Approved | DARRYL ARNOLD |
| Structural Steel Frame | 8/6/2020 | Approved | DARRYL ARNOLD |
| Wood Frame | 8/6/2020 | Conditional Approval | DARRYL ARNOLD |
| Deputy Reinf. Concrete | 8/7/2020 | Conditional Approval | DARRYL ARNOLD |
| Wood Frame | 8/7/2020 | Corrections Issued | VAHE KELEDJIAN |
| Floor/Roof Diaphrgm/Shear Wall | 8/11/2020 | Approved | DARRYL ARNOLD |
| Wood Frame | 8/11/2020 | Not Ready for Inspection | DARRYL ARNOLD |
| Interior/Exterior Lathing | 8/14/2020 | Approved | DARRYL ARNOLD |
| Final | 8/26/2020 | OK for CofC | DARRYL ARNOLD |
| METHANE-Final | 8/26/2020 | Approved | DARRYL ARNOLD |
| SGSOV-Seismic Gas S/O Valve | 8/26/2020 | SGSOV Approved | DARRYL ARNOLD |
| Smoke Detectors | 8/26/2020 | Approved | DARRYL ARNOLD |