13944 W SHERMAN WAY 91405

Certificate Information: 13944 W SHERMAN WAY 91405

Application / Permit
18016-10000-20162
Plan Check / Job No.
B18LA12732
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Soft-story retrofit per LABC Chap 93. Install new (3) SCCS and shear walls.
Permit Issued
Issued on 11/30/2020
Issuing Office
Current Status
CofC Issued on 8/10/2021

Permit Application Status History

Submitted 6/22/2018 APPLICANT
Assigned to Plan Check Engineer 8/8/2018 TSE MING HUANG
Corrections Issued 8/15/2018 TSE MING HUANG
Quality Review Completed 8/17/2018 SAI KHUM
Building Plans Picked Up 8/28/2018 APPLICANT
Applicant returned to address corrections 9/20/2018 TSE MING HUANG
Applicant returned to address corrections 9/27/2018 TSE MING HUANG
Applicant returned to address corrections 10/12/2018 TSE MING HUANG
Plan Check Approved 11/14/2018 TSE MING HUANG
Issued 11/30/2020 APPLICANT
OK for CofC 4/26/2021 KENNETH ROBERTS
CofC Issued 8/10/2021 RICKEY JACKSON

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/12/2018 MARKOS PEREZ-BRAN
Miscellaneous Cleared 10/12/2018 MARKOS PEREZ-BRAN
Housing rent stabilization Cleared 10/21/2020 STEVEN HOFSTAD

Contact Information

Contractor J N N General Construction Inc; Lic. No.: 1030534-B 14751 ERWIN ST #17      VAN NUYS, CA 91411
Engineer Basma,, Ali J; Lic. No.: C53080 21500 WYANDOTTE ST 106      CANOGA PARK, CA 91303

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Wood Construction 12/23/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/23/2020 Not Ready for Inspection DANIEL VARNUM
Pre-Inspection 12/23/2020 Partial Approval DANIEL VARNUM
Wood Frame 12/23/2020 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 1/14/2021 Approved JOE VELASQUEZ
Structural Steel Frame 1/14/2021 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 1/14/2021 Not Ready for Inspection JOE VELASQUEZ
Floor/Roof Diaphrgm/Shear Wall 1/25/2021 Not Ready for Inspection JOE VELASQUEZ
Structural Steel Frame 1/25/2021 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 1/25/2021 Partial Approval JOE VELASQUEZ
Floor/Roof Diaphrgm/Shear Wall 1/26/2021 Approved JOE VELASQUEZ
Insulation 1/26/2021 Approved JOE VELASQUEZ
Structural Steel Frame 1/26/2021 Approved JOE VELASQUEZ
Wood Frame 1/26/2021 Approved JOE VELASQUEZ
Interior/Exterior Lathing 2/3/2021 Approved JOE VELASQUEZ
Final 4/14/2021 Not Ready for Inspection JOE VELASQUEZ
SGSOV-Seismic Gas S/O Valve 4/14/2021 SGSOV Not Ready JOE VELASQUEZ
Smoke Detectors 4/14/2021 Not Ready for Inspection JOE VELASQUEZ
Final 4/26/2021 OK for CofC KENNETH ROBERTS
SGSOV-Seismic Gas S/O Valve 4/26/2021 SGSOV Approved KENNETH ROBERTS
Smoke Detectors 4/26/2021 Approved KENNETH ROBERTS