3878 S POTOMAC AVE 90008

Certificate Information: 3878 S POTOMAC AVE 90008

Application / Permit
18016-10000-19986
Plan Check / Job No.
B18LA12653
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT-STORY SEISMIC RETROFIT PER LAMC DIV. 93: INSTALL STEEL MOMENT FRAME AND PLYWOOD SHEARWALL
Permit Issued
Issued on 10/6/2020
Issuing Office
Current Status
CofC Issued on 1/13/2023

Permit Application Status History

Submitted 6/22/2018 APPLICANT
Assigned to Plan Check Engineer 7/26/2018 MANUEL MONTUFAR
Corrections Issued 8/7/2018 MANUEL MONTUFAR
Quality Review Completed 8/8/2018 CELESTE MORRIS
Plan Check Approved 9/26/2018 MANUEL MONTUFAR
Issued 10/6/2020 APPLICANT
OK for CofC 4/6/2021 DARRYL ARNOLD
CofC Issued 1/13/2023 WINSTON DUNNING

Permit Application Clearance Information

Housing rent stabilization Cleared 9/30/2020 STEVEN HOFSTAD

Contact Information

Architect Santillan,, Michael; Lic. No.: C23337 832 SANTIAGO ROAD      COSTA MESA, CA 92626
Contractor Cal - Quake Construction Inc; Lic. No.: 759817-B 636 NORTH FORMOSA AVENUE      LOS ANGELES, CA 90036

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/1/2020 Approved DARRYL ARNOLD
Deputy Drilled-In Anchors 12/23/2020 Conditional Approval JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 1/19/2021 Conditional Approval DARRYL ARNOLD
Deputy Wood Construction 1/20/2021 Conditional Approval DARRYL ARNOLD
Deputy Wood Construction 1/21/2021 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 1/26/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 1/27/2021 Conditional Approval MARK FERRARI
Deputy Steel/Welding 1/27/2021 Conditional Approval MARK FERRARI
Excavation/Setback/Form/Re-Bar 2/2/2021 Approved JONATHAN QUACH
Structural Steel Frame 2/2/2021 Not Ready for Inspection JONATHAN QUACH
Wood Frame 2/2/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Reinf. Concrete 2/4/2021 Conditional Approval MARK FERRARI
Floor/Roof Diaphrgm/Shear Wall 2/10/2021 Conditional Approval DARRYL ARNOLD
Wood Frame 2/10/2021 Conditional Approval DARRYL ARNOLD
Floor/Roof Diaphrgm/Shear Wall 2/17/2021 Approved DARRYL ARNOLD
Wood Frame 2/17/2021 Approved DARRYL ARNOLD
Interior/Exterior Lathing 3/18/2021 Approved DARRYL ARNOLD
Final 4/6/2021 OK for CofC DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 4/6/2021 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 4/6/2021 Approved DARRYL ARNOLD