4500 W WASHINGTON BLVD 90016

Certificate Information: 4500 W WASHINGTON BLVD 90016

Application / Permit
18016-10000-07643
Plan Check / Job No.
B18LA04808
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
interior/exterior structural work/remodel to (e) building to combine 3 separate tenant spaces into 1 space
Permit Issued
Issued on 8/24/2018
Issuing Office
Metro
Current Status
Permit Finaled on 3/28/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/13/2018 APPLICANT
Disabled Access Plans Picked Up 4/16/2018 APPLICANT
Assigned to Plan Check Engineer 4/20/2018 DEAN RYAN REYES
Corrections Issued 5/7/2018 DEAN RYAN REYES
Quality Review Completed 5/14/2018 BILL STUTSMAN
Building Plans Picked Up 5/16/2018 APPLICANT
Applicant returned to address corrections 6/29/2018 DEAN RYAN REYES
Plan Check Approved 7/19/2018 DEAN RYAN REYES
Issued 8/24/2018 LADBS
Permit Finaled-Status Void 2/22/2024 RICARDO ROBLES
Re-Activate Permit 3/28/2024 RICARDO ROBLES
Permit Finaled 3/28/2024 RAFAEL ESPINOZA

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 6/8/2018 NAZILA NOORIFAR
Roof/Waste drainage to street Cleared 6/8/2018 NAZILA NOORIFAR
ZI Cleared 6/8/2018 SEAN VEAL
Project located in CRA area Cleared 6/12/2018 JIM URQUHART
DAS Clearance Cleared 6/13/2018 ELIZABETH TOMS
ZI Cleared 6/22/2018 STACY FARFAN
ZI Cleared 6/29/2018 DIANA JIMENEZ

Contact Information

Architect Spano, Raymond Fortunato; Lic. No.: C6212 1163 RUBIO STREET      ALTADENA, CA 91001
Contractor Owner-Builder       ,
Engineer Liu, Joseph; Lic. No.: C60045 5331 N PECK RD A      EL MONTE, CA 91732

Inspector Information

IAN BLINN, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI
CHRISTOPHER BLACKWOOD, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/3/2018 Partial Approval GREGORY POMISH
Deputy Steel/Welding 11/9/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/14/2018 Not Ready for Inspection GREGORY POMISH
Structural Steel Frame 11/14/2018 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/19/2018 Approved DAVID BURKHEAD
Wood Frame 12/18/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 12/21/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 12/27/2018 Corrections Issued GREGORY POMISH
Interior/Exterior Lathing 1/11/2019 Approved GREGORY POMISH
Wood Frame 7/8/2019 Approved FELIX CEBALLOS
Wood Frame 12/3/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 2/25/2022 Conditional Approval KATY RAMIREZ
Insulation 3/18/2022 Approved KATY RAMIREZ
Drywall Nailing 3/22/2022 Conditional Approval DARRYL ARNOLD
Pre-Inspection 8/14/2023 Approved ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 8/14/2023 SGSOV Not Ready ALFREDO LOPEZ
Smoke Detectors 8/14/2023 Not Ready for Inspection ALFREDO LOPEZ
Final 2/22/2024 Conditional Approval RICARDO ROBLES
SGSOV-Seismic Gas S/O Valve 2/22/2024 SGSOV Approved RICARDO ROBLES
Smoke Detectors 2/22/2024 Approved RICARDO ROBLES