915 S WESTLAKE AVE 90006

Certificate Information: 915 S WESTLAKE AVE 90006

Application / Permit
18016-10000-04900
Plan Check / Job No.
B18LA03034
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LAMC DIVISION 93. RETROFIT CONSISTS OF INSTALLING (1) ORDINARY MOMENT FRAME AND (5) SPECIAL STEEL CANTILEVER COLUMNS TO AN EXISTING 2-STORY APARTMENT BUILDING
Permit Issued
Issued on 3/9/2020
Issuing Office
Metro
Current Status
CofC Issued on 8/12/2021

Permit Application Status History

Submitted 2/20/2018 APPLICANT
Assigned to Plan Check Engineer 3/15/2018 RICARDO SUPAN
Corrections Issued 3/20/2018 RICARDO SUPAN
Quality Review Completed 3/21/2018 SAI KHUM
Building Plans Picked Up 4/9/2018 APPLICANT
Applicant returned to address corrections 6/17/2019 VARAND SARKISIAN
Applicant returned to address corrections 7/1/2019 VARAND SARKISIAN
Plan Check Approved 7/2/2019 VARAND SARKISIAN
Issued 3/9/2020 LADBS
OK for CofC 8/12/2021 MARK FERRARI
CofC Issued 8/12/2021 WINSTON DUNNING

Permit Application Clearance Information

Project located in CRA area Cleared 8/29/2018 JIM URQUHART
Housing rent stabilization Cleared 3/9/2020 ISMAEL HERNANDEZ

Contact Information

Contractor J Retrofit Construction Inc; Lic. No.: 1041138-B 8826 BARING CROSS ST      LOS ANGELES, CA 90044
Engineer Farmand, Anthony E; Lic. No.: C62595 4675 MACARTHUR COURT SUITE 800      NEWPORT BEACH, CA 92660

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/19/2020 Corrections Issued DARRYL ARNOLD
Pre-Inspection 12/21/2020 Corrections Issued DARRYL ARNOLD
Deputy Steel/Welding 2/16/2021 Conditional Approval DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 2/18/2021 Approved MARK FERRARI
Deputy Steel/Welding 4/16/2021 Conditional Approval DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 5/5/2021 Not Ready for Inspection JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 5/6/2021 Approved DARRYL ARNOLD
Deputy Reinf. Concrete 5/10/2021 Conditional Approval MARK FERRARI
Deputy Steel/Welding 6/2/2021 Conditional Approval MARK FERRARI
Structural Steel Frame 6/2/2021 Not Ready for Inspection MARK FERRARI
Wood Frame 6/2/2021 Not Ready for Inspection MARK FERRARI
Structural Steel Frame 6/4/2021 Conditional Approval DARRYL ARNOLD
Wood Frame 6/4/2021 Not Ready for Inspection DARRYL ARNOLD
Structural Steel Frame 6/16/2021 Approved JONATHAN QUACH
Wood Frame 6/16/2021 Approved JONATHAN QUACH
Interior/Exterior Lathing 6/28/2021 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 7/2/2021 Corrections Issued BRUCE CAMPBELL
Final 7/30/2021 Not Ready for Inspection MARK FERRARI
SGSOV-Seismic Gas S/O Valve 7/30/2021 SGSOV Approved MARK FERRARI
Smoke Detectors 7/30/2021 Approved MARK FERRARI
Final 8/12/2021 OK for CofC MARK FERRARI