208 W 8TH ST 90014

Certificate Information: 208 W 8TH ST 90014

Application / Permit
18016-10000-03005
Plan Check / Job No.
B18LA01782
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(5) Apartment Hotel
Work Description
ADAPTIVE REUSE AND SEISMIC UPGRADE OF (E) 12 STORY BUILDING. RECONFIGURATION OF RETAIL AND RESTAURANT AT 1ST FLOOR AND MEZZANINE. CHANGE OF USE FROM OFFICE TO 110 TRANSIENT OCCUPANCY RESIDENTIAL DWELLING UNITS AT FLOORS 2 THROUGH 12. COMPLIANT WITH MANDATORY SEISMIC RETROFIT NDC ORD. 183893
Permit Issued
Issued on 1/6/2020
Issuing Office
Metro
Current Status
CofO Issued on 5/14/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/9/2018 APPLICANT
Assigned to Plan Check Engineer 3/8/2018 ALLEN MANALANSAN
Corrections Issued 3/16/2018 ALLEN MANALANSAN
Quality Review Completed 3/22/2018 CHARLES CHANG
Building Plans Picked Up 3/23/2018 APPLICANT
Applicant returned to address corrections 5/15/2018 ALLEN MANALANSAN
Applicant returned to address corrections 10/29/2018 ALLEN MANALANSAN
Applicant returned to address corrections 8/8/2019 ALLEN MANALANSAN
Applicant returned to address corrections 9/4/2019 ALLEN MANALANSAN
Plan Check Approved 12/11/2019 ALLEN MANALANSAN
Issued 1/6/2020 LADBS
TCO Issued (Expire Date: 02-26-2024) 8/30/2023 TED RIES
TCO Issued (Expire Date: 10-05-2024) 4/8/2024 ADAM BURGESS
CofO in Progress 5/8/2024 LUIS CCAMACHO
CofO in Progress 5/13/2024 ERNESTO CORRAL
CofO in Progress 5/13/2024 ERNESTO CORRAL
CofO Issued 5/14/2024 ERNESTO CORRAL
Permit Finaled 5/14/2024 ERNESTO CORRAL

Permit Application Clearance Information

"D" conditions Cleared 2/22/2019 ANNA VAN
Site Plan review Cleared 2/22/2019 ANNA VAN
ZA Case Cleared 2/22/2019 ANNA VAN
ZA Case Cleared 2/22/2019 ANNA VAN
ZA Case Cleared 2/22/2019 ANNA VAN
Eng Process Fee Ord 176,300 Cleared 3/14/2019 CELINA MORENO
Highway dedication Cleared 3/14/2019 CELINA MORENO
Construction near power lines Cleared 5/7/2019 OSCAR CASTRO
Building over 3-story or 36-ft Cleared 5/22/2019 CALOSHA APPROVED
City Hist. Cultural Monument Cleared 5/22/2019 LAMBERT GIESSINGER
Historic monument Cleared 5/22/2019 LAMBERT GIESSINGER
Project located in CRA area Cleared 6/6/2019 JIM URQUHART
Address approval Cleared 7/3/2019 JEANIE LAM
"D" conditions Cleared 7/12/2019 DIANA JIMENEZ
Project located in CRA area Cleared 7/12/2019 JIM URQUHART
Site Plan review Cleared 7/12/2019 DIANA JIMENEZ
Encroachment in public way Cleared 8/15/2019 ELENA LOPEZ
Encroachment in public way Cleared 8/15/2019 ELENA LOPEZ
Green Code Cleared 9/13/2019 DONALD CRICHLOW
Sewer availability Cleared 10/10/2019 JEANETTE VONG
Roof/Waste drainage to street Cleared 10/17/2019 EMIL KYUPELYAN
DAS Clearance Cleared 12/10/2019 ALLEN MANALANSAN
Fire Marshall Fire Life Safety Cleared 12/11/2019 MENOA AGHAJANI

Contact Information

Architect Liljegren, Karin J; Lic. No.: C28158 727 W 7TH STREET # 610      LOS ANGELES, CA 90017
Contractor City Constructors Inc; Lic. No.: 834591-B 3125 N BROADWAY      LOS ANGELES, CA 90031
Engineer O'Connell,, Kevin Daniel; Lic. No.: S4707 23201 EVALYN AVE      TORRANCE, CA 90505
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/9/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 3/11/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/2/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/2/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 4/2/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/6/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/6/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/16/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/16/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/23/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/23/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 4/23/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 4/23/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/11/2020 Partial Approval LANNY MERRICK
Deputy Drilled-In Anchors 5/26/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/29/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/5/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 6/5/2020 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 6/5/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/10/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/9/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 7/9/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 7/9/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/10/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/22/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 7/22/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 7/22/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 7/24/2020 Partial Approval DANIEL COLLINS
Green Building Rough 7/24/2020 Approved DANIEL COLLINS
Deputy Drilled-In Anchors 7/27/2020 Partial Approval RONALD PACHECO
Deputy Drilled-In Anchors 8/5/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/5/2020 Conditional Approval DANIEL COLLINS
Light Gage Steel Frame 9/4/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/9/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 9/10/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 9/10/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 9/16/2020 Partial Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 9/16/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 9/21/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 9/21/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/30/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 10/6/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/14/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/20/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/20/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 10/20/2020 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/21/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/21/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 11/16/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 11/16/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 11/24/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/1/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/1/2020 Conditional Approval DANIEL COLLINS
Masonry Wall/Backfill 12/2/2020 Partial Approval DANIEL COLLINS
Masonry Wall/Backfill 12/8/2020 Partial Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 12/10/2020 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 12/11/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/16/2020 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 12/16/2020 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 1/7/2021 Partial Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/12/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/12/2021 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 1/20/2021 Partial Approval KATY RAMIREZ
Footing/Foundation/Slab 1/20/2021 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 1/25/2021 Conditional Approval RONALD PACHECO
Deputy Reinf. Concrete 1/25/2021 Conditional Approval RONALD PACHECO
Excavation/Setback/Form/Re-Bar 1/29/2021 No Access for Inspection KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 2/1/2021 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 2/8/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/8/2021 Conditional Approval KATY RAMIREZ
Footing/Foundation/Slab 2/12/2021 Partial Approval KATY RAMIREZ
Footing/Foundation/Slab 2/22/2021 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 2/25/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/25/2021 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 2/26/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 3/2/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 3/2/2021 Conditional Approval KATY RAMIREZ
Footing/Foundation/Slab 3/2/2021 Partial Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 3/9/2021 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 3/15/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/15/2021 Conditional Approval DANIEL COLLINS
Drywall Nailing 3/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 3/15/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/25/2021 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 3/25/2021 Conditional Approval LANNY MERRICK
Light Gage Steel Frame 4/1/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 4/6/2021 Partial Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 4/6/2021 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 4/6/2021 Not Ready for Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 4/9/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 4/9/2021 Conditional Approval KATY RAMIREZ
Drywall Nailing 4/9/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 4/9/2021 Partial Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 4/16/2021 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 4/23/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 4/23/2021 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 4/30/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/6/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 5/6/2021 Conditional Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 5/12/2021 Partial Inspection MARK FERRARI
Light Gage Steel Frame 5/12/2021 Corrections Issued KATY RAMIREZ
Deputy Drilled-In Anchors 5/18/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 5/18/2021 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 5/26/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/2/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/2/2021 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 6/7/2021 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/11/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/11/2021 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 6/21/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 6/25/2021 No Access for Inspection KATY RAMIREZ
Drywall Nailing 6/28/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 6/28/2021 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/29/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 6/29/2021 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 7/9/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 7/14/2021 Partial Approval KATY RAMIREZ
Insulation 7/14/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 7/16/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 7/27/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 7/27/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 7/28/2021 Partial Approval KATY RAMIREZ
Insulation 7/30/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 8/3/2021 Partial Approval KATY RAMIREZ
Insulation 8/3/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 8/5/2021 Not Ready for Inspection KATY RAMIREZ
Insulation 8/5/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 8/5/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 8/16/2021 Partial Approval KATY RAMIREZ
Insulation 8/16/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 8/20/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 8/20/2021 Partial Approval KATY RAMIREZ
Insulation 8/26/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 8/30/2021 No Access for Inspection KATY RAMIREZ
Light Gage Steel Frame 8/31/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 9/2/2021 Partial Approval KATY RAMIREZ
Insulation 9/7/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 9/7/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 9/20/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 9/23/2021 Partial Approval KATY RAMIREZ
Insulation 9/27/2021 No Access for Inspection KATY RAMIREZ
Light Gage Steel Frame 10/1/2021 Partial Approval KATY RAMIREZ
Insulation 10/4/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 10/7/2021 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 10/8/2021 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 10/13/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 10/15/2021 Partial Approval KATY RAMIREZ
Insulation 10/19/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 10/20/2021 No Access for Inspection KATY RAMIREZ
Light Gage Steel Frame 10/21/2021 Not Ready for Inspection KATY RAMIREZ
Drywall Nailing 11/1/2021 Conditional Approval DARRYL ARNOLD
Light Gage Steel Frame 11/1/2021 Conditional Approval DARRYL ARNOLD
Insulation 11/3/2021 No Access for Inspection KATY RAMIREZ
Light Gage Steel Frame 11/4/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 11/8/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 11/8/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 11/10/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 11/15/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 11/15/2021 Partial Approval KATY RAMIREZ
Insulation 11/18/2021 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 12/7/2021 No Access for Inspection KATY RAMIREZ
Light Gage Steel Frame 12/8/2021 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 1/10/2022 Partial Approval NICK DANERI
Insulation 1/13/2022 Conditional Approval DARRYL ARNOLD
Insulation 1/14/2022 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 1/20/2022 Partial Approval TED RIES
Light Gage Steel Frame 2/7/2022 Corrections Issued KATY RAMIREZ
Light Gage Steel Frame 2/24/2022 Partial Approval KATY RAMIREZ
Drywall Nailing 3/1/2022 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 3/8/2022 Partial Approval KATY RAMIREZ
Drywall Nailing 3/10/2022 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 3/10/2022 Partial Approval KATY RAMIREZ
Drywall Nailing 3/16/2022 Partial Approval KATY RAMIREZ
Drywall Nailing 3/17/2022 Partial Approval KATY RAMIREZ
Special/Order Compliance 3/17/2022 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 4/4/2022 Not Ready for Inspection KATY RAMIREZ
Drywall Nailing 5/16/2022 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 5/16/2022 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 7/11/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/13/2022 Partial Approval GREGORY POMISH
Special/Order Compliance 10/20/2022 Corrections Issued KATY RAMIREZ
Special/Order Compliance 11/4/2022 Partial Inspection KATY RAMIREZ
Special/Order Compliance 11/9/2022 Not Ready for Inspection KATY RAMIREZ
Special/Order Compliance 11/15/2022 Partial Inspection KATY RAMIREZ
Special/Order Compliance 12/1/2022 Partial Inspection KATY RAMIREZ
Pre-Inspection 2/7/2023 Partial Inspection KATY RAMIREZ
Pre-Inspection 2/14/2023 Partial Inspection KATY RAMIREZ
Pre-Inspection 4/3/2023 Partial Inspection KATY RAMIREZ
Special/Order Compliance 5/19/2023 Partial Inspection KATY RAMIREZ
Final 7/24/2023 Not Ready for Inspection KATY RAMIREZ
Green Building Final 7/24/2023 Not Ready for Inspection KATY RAMIREZ
Reinforced Concrete Frame 7/24/2023 Not Ready for Inspection KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 7/24/2023 SGSOV Not Ready KATY RAMIREZ
Smoke Detectors 7/24/2023 Not Ready for Inspection KATY RAMIREZ
Final 8/7/2023 Partial Inspection KATY RAMIREZ
Green Building Final 8/7/2023 Not Ready for Inspection KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 8/7/2023 SGSOV Approved KATY RAMIREZ
Smoke Detectors 8/7/2023 Partial Inspection KATY RAMIREZ
Pre-Inspection 1/12/2024 Partial Inspection KATY RAMIREZ
Special/Order Compliance 1/30/2024 Not Ready for Inspection KATY RAMIREZ
Drywall Nailing 3/4/2024 Not Ready for Inspection LUIS CCAMACHO
Final 3/4/2024 Not Ready for Inspection LUIS CCAMACHO
Green Building Final 3/4/2024 Approved LUIS CCAMACHO
Reinforced Concrete Frame 3/4/2024 Not Ready for Inspection LUIS CCAMACHO
Smoke Detectors 3/4/2024 Approved LUIS CCAMACHO
Deputy Steel/Welding 3/22/2024 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 4/29/2024 Not Ready for Inspection LUIS CCAMACHO
Final 4/29/2024 Not Ready for Inspection LUIS CCAMACHO
Reinforced Concrete Frame 4/29/2024 Not Ready for Inspection LUIS CCAMACHO
Drywall Nailing 5/8/2024 Partial Approval LUIS CCAMACHO
Final 5/8/2024 OK to Issue CofO LUIS CCAMACHO
Reinforced Concrete Frame 5/8/2024 Partial Approval LUIS CCAMACHO