1317 1/2 W 59TH ST 90044

Certificate Information: 1317 1/2 W 59TH ST 90044

Application / Permit
18014-70000-06388
Plan Check / Job No.
B18SL01640
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED GARAGE TO SINGLE-STORY ACCESSORY DWELLING UNIT PER AB 494 AND SB 229, AND (16'6"x16'9" and 7'x11'3") ADDITION TO SAID STRUCTURE.
Permit Issued
Issued on 11/7/2019
Issuing Office
West Los Angeles
Current Status
CofO Issued on 8/20/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/7/2018 APPLICANT
Assigned to Plan Check Engineer 12/6/2018 LUIS RINCON
Corrections Issued 12/7/2018 LUIS RINCON
Quality Review Completed 12/10/2018 MOHAMMAD FIROUZBAKHT
Green Plans Picked Up 12/14/2018 APPLICANT
Building Plans Picked Up 1/30/2019 APPLICANT
Plan Check Approved 11/7/2019 LUIS RINCON
Issued 11/7/2019 LADBS
CofO in Progress 8/5/2022 ENRIQUE MIRELES
Permit Finaled 8/20/2022 DEROLD HAUFF
Permit Finaled 8/20/2022 DEROLD HAUFF
CofO Issued 8/20/2022 DEROLD HAUFF

Permit Application Clearance Information

Green Code Cleared 1/15/2019 LUIS RINCON
Address approval Cleared 1/23/2019 CELINA MORENO
Hydrant and Access approval Cleared 1/23/2019 JOHN CONNEALLY
Eng Process Fee Ord 176,300 Cleared 5/6/2019 ELENA LOPEZ
Sewer availability Cleared 5/6/2019 ELENA LOPEZ
Low Impact Development Cleared 5/8/2019 MITESH PATEL
Construction near power lines Cleared 8/23/2019 RIDWAN HARDY
Roof/Waste drainage to street Cleared 10/28/2019 GUILLERMO PETRA

Contact Information

Contractor Owner-Builder       ,
Engineer Espino,, Manuel A; Lic. No.: C55526 12109 WOODRUFF AVE      DOWNEY, CA 90241

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/15/2019 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 11/15/2019 Not Ready for Inspection FREDDIE RIVERA
Deputy Drilled-In Anchors 11/21/2019 Conditional Approval FREDDIE RIVERA
Footing/Foundation/Slab 11/21/2019 Not Ready for Inspection FREDDIE RIVERA
Footing/Foundation/Slab 12/23/2019 Conditional Approval FREDDIE RIVERA
BUILDING-Rough-Frame 2/18/2020 Not Ready for Inspection FREDDIE RIVERA
ELECTRICAL-Rough 2/18/2020 Not Ready for Inspection FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 2/18/2020 Partial Approval FREDDIE RIVERA
Green Building Rough 2/18/2020 Not Ready for Inspection FREDDIE RIVERA
PLUMBING-Rough 2/18/2020 Partial Approval FREDDIE RIVERA
ELECTRICAL-Rough 3/3/2020 No Access for Inspection FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 3/3/2020 No Access for Inspection FREDDIE RIVERA
PLUMBING-Rough 3/3/2020 Approved BOB DUNN
BUILDING-Rough-Frame 3/11/2020 Approved FREDDIE RIVERA
ELECTRICAL-Rough 3/11/2020 Approved FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 3/11/2020 Approved FREDDIE RIVERA
Green Building Rough 3/11/2020 Approved FREDDIE RIVERA
Drywall Nailing 3/20/2020 Approved FREDDIE RIVERA
Insulation 3/20/2020 Approved FREDDIE RIVERA
Interior/Exterior Lathing 3/20/2020 Partial Approval FREDDIE RIVERA
Interior/Exterior Lathing 4/28/2020 Approved FREDDIE RIVERA
Final 7/28/2020 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 7/28/2020 Approved FREDDIE RIVERA
Green Building Final 7/28/2020 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 7/28/2020 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 7/28/2020 Approved FREDDIE RIVERA
Final 6/8/2022 Corrections Issued ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 6/8/2022 SGSOV Approved ENRIQUE MIRELES
Final 8/4/2022 OK to Issue CofO ENRIQUE MIRELES
Service/Power Release 8/5/2022 Approved ENRIQUE MIRELES