4533 W COCKERHAM DR 90027

Certificate Information: 4533 W COCKERHAM DR 90027

Application / Permit
18014-20000-06898
Plan Check / Job No.
B18VN20809
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION TO BASEMENT, 1ST & 2ND FLOORS TO (E) 2-STORY SFD W/ BASEMENT AND MAJOR REMODEL (NFPA-13D FIRE SPRINKLERS THROUGHOUT)
Permit Issued
Issued on 6/24/2019
Issuing Office
Valley
Current Status
CofO Issued on 7/29/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/4/2018 APPLICANT
Green Plans Picked Up 12/12/2018 APPLICANT
Assigned to Plan Check Engineer 12/13/2018 NILOOFAR MEHRAIN
Corrections Issued 12/18/2018 NILOOFAR MEHRAIN
Quality Review Completed 12/19/2018 CHON CHIO KUO
Building Plans Picked Up 12/19/2018 APPLICANT
Applicant returned to address corrections 3/20/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 4/12/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 4/30/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 5/28/2019 NILOOFAR MEHRAIN
Plan Check Approved 6/10/2019 NILOOFAR MEHRAIN
Issued 6/24/2019 LADBS
CofO in Progress 4/10/2024 ENRIQUE MIRELES
Permit Finaled 7/29/2024 DEROLD HAUFF
CofO Issued 7/29/2024 DEROLD HAUFF
Permit Finaled 7/29/2024 DEROLD HAUFF

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 1/22/2019 HISASHI KOBAYAKAWA
Eng Process Fee Ord 176,300 Cleared 1/22/2019 HISASHI KOBAYAKAWA
Sewer availability Cleared 1/22/2019 HISASHI KOBAYAKAWA
BHO/Hillside ordinance Cleared 2/1/2019 JEANETTE VONG
Hydrant and Access approval Cleared 2/1/2019 JOHN CONNEALLY
Permit Cleared 2/1/2019 JEANETTE VONG
Trees in Parkway Cleared 2/5/2019 JOHN KIM
BHO/Hillside ordinance Cleared 2/6/2019 JEANETTE VONG
Green Code Cleared 4/12/2019 MICHAEL AYERS
GPI Written Notices Cleared 4/30/2019 NILOOFAR MEHRAIN
Grading Pre-Inspection Cleared 4/30/2019 NILOOFAR MEHRAIN
Low Impact Development Cleared 5/28/2019 SARAH YOUSSEF
Excavation more than 5-ft deep Cleared 6/10/2019 CALOSHA APPROVED
Haul Route Cleared 6/10/2019 NILOOFAR MEHRAIN
Roof/Waste drainage to street Cleared 6/10/2019 GUILLERMO PETRA

Contact Information

Architect Hefner,, William Robert; Lic. No.: C17013 5820 WILSHIRE BLVD SUITE 500      LOS ANGELES, CA 90036
Contractor Building Inc Construction; Lic. No.: 908685-B 5820 WILSHIRE BLVD 400      LOS ANGELES, CA 90036
Engineer Galbreath,, Sean Martin; Lic. No.: S5653 1386 EAST WALNUT STREET SUITE 202      PASADENA, CA 91106
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Lieurance, Martin Ellis; Lic. No.: C54323 31129 VIA COLINAS 707      WESTLAKE VILLAGE, CA 91362
Geologist Hollingsworth, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Geologist Lieurance, Martin Ellis; Lic. No.: EG1810 GROVER-HOLLINGSWORTH & ASSOCIATE   31129 VIA COLINAS STE 707    WESTLAKE VILLAGE, CA 91362

Inspector Information

ENRIQUE MIRELES, (213) 202-3438 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 11/4/2019 No Access for Inspection BRAD BESCOS
Deputy Steel/Welding 11/4/2019 No Access for Inspection BRAD BESCOS
Footing/Foundation/Slab 1/10/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 1/22/2020 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 3/11/2020 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 3/23/2020 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 4/16/2020 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 4/22/2020 Conditional Approval CHRISTOPHER DELLEFIELD
Footing/Foundation/Slab 4/24/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 5/1/2020 Conditional Approval CHRISTOPHER DELLEFIELD
Deputy Drilled-In Anchors 5/4/2020 Partial Approval JOSEPH MCGARRY
Underground Mechanical 5/18/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 5/26/2020 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 6/9/2020 Conditional Approval THOMAS LOGRASSO
Deputy Drilled-In Anchors 6/15/2020 Partial Approval JOSEPH MCGARRY
Wood Frame 6/22/2020 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 7/14/2020 Partial Approval ARTHUR SARGSYAN
Deputy Drilled-In Anchors 7/30/2020 Approved ARTHUR SARGSYAN
Deputy Steel/Welding 7/30/2020 Approved ARTHUR SARGSYAN
Deputy Drilled-In Anchors 8/3/2020 Partial Approval SCOTT FINNILA
Deputy Steel/Welding 8/3/2020 Partial Approval SCOTT FINNILA
Footing/Foundation/Slab 8/5/2020 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 8/10/2020 Conditional Approval CHRISTOPHER DELLEFIELD
Deputy Steel/Welding 8/10/2020 Conditional Approval CHRISTOPHER DELLEFIELD
Deputy Steel/Welding 8/12/2020 Conditional Approval THOMAS LOGRASSO
Floor/Roof Diaphrgm/Shear Wall 8/18/2020 Partial Approval CHRIS CHRISTENSEN
PLUMBING-Rough 9/4/2020 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 9/22/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 10/15/2020 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 10/16/2020 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 10/16/2020 Partial Approval JOSEPH MCGARRY
Wood Frame 10/16/2020 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 11/4/2020 Approved JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 11/4/2020 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 11/6/2020 Approved JOSEPH MCGARRY
Deputy Steel/Welding 11/23/2020 No Access for Inspection ELMER BLAND
Deputy Drilled-In Anchors 11/24/2020 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 12/8/2020 Approved JOSEPH MCGARRY
Footing/Foundation/Slab 12/8/2020 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 12/8/2020 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 12/15/2020 Partial Approval JOSEPH MCGARRY
Reinforced Concrete Frame 1/5/2021 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 1/13/2021 Conditional Approval THOMAS LOGRASSO
Footing/Foundation/Slab 1/21/2021 Approved HAMIK HARTOUNIAN
Deputy Steel/Welding 1/26/2021 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 1/27/2021 No Access for Inspection ELMER BLAND
Deputy Drilled-In Anchors 2/17/2021 Conditional Approval THOMAS LOGRASSO
Deputy Drilled-In Anchors 2/19/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 2/26/2021 Conditional Approval THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 3/1/2021 Partial Approval HAMIK HARTOUNIAN
PLUMBING-Rough 3/1/2021 Partial Approval HAMIK HARTOUNIAN
Footing/Foundation/Slab 3/17/2021 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 4/5/2021 Conditional Approval HAMIK HARTOUNIAN
PLUMBING-Rough 4/5/2021 Partial Approval HAMIK HARTOUNIAN
Deputy Drilled-In Anchors 4/12/2021 Conditional Approval THOMAS LOGRASSO
Deputy Drilled-In Anchors 4/16/2021 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 4/27/2021 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 5/26/2021 No Access for Inspection ELMER BLAND
Deputy Steel/Welding 5/26/2021 No Access for Inspection ELMER BLAND
Footing/Foundation/Slab 5/27/2021 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 6/9/2021 Partial Approval JOSEPH MCGARRY
Underground Mechanical 6/9/2021 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 6/21/2021 Conditional Approval CALEB MEISTER
Deputy Drilled-In Anchors 6/21/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 6/21/2021 Conditional Approval CALEB MEISTER
Deputy Drilled-In Anchors 6/28/2021 Approved RONALD KIDWELL
Footing/Foundation/Slab 7/6/2021 Partial Approval JOSEPH MCGARRY
Underground Mechanical 7/6/2021 Approved JOSEPH MCGARRY
Footing/Foundation/Slab 7/19/2021 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 7/19/2021 Approved JOSEPH MCGARRY
Deputy Drilled-In Anchors 7/22/2021 No Access for Inspection ELMER BLAND
HVAC-Rough 8/20/2021 Partial Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 9/27/2021 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 9/30/2021 Partial Approval JOSEPH MCGARRY
Interior/Exterior Lathing 9/30/2021 Partial Approval JOSEPH MCGARRY
Interior/Exterior Lathing 10/15/2021 Partial Approval JOSEPH MCGARRY
Shower Pan 10/15/2021 Approved JOSEPH MCGARRY
HVAC-Rough 10/20/2021 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 11/23/2021 Partial Approval CHRIS CHRISTENSEN
ELECTRICAL-Rough 11/23/2021 Partial Approval CHRIS CHRISTENSEN
Green Building Rough 11/23/2021 Not Ready for Inspection CHRIS CHRISTENSEN
Underground Mechanical 11/23/2021 Partial Approval CHRIS CHRISTENSEN
Verify Sprinkler Sign Off 11/23/2021 Partial Approval CHRIS CHRISTENSEN
Drywall Nailing 12/23/2021 Partial Approval JOSEPH MCGARRY
Insulation 12/23/2021 Partial Approval JOSEPH MCGARRY
Interior/Exterior Lathing 12/23/2021 Partial Approval JOSEPH MCGARRY
Insulation 1/5/2022 Partial Approval JOSEPH MCGARRY
Drywall Nailing 1/14/2022 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 2/4/2022 Partial Approval JOSEPH MCGARRY
ELECTRICAL-Rough 2/4/2022 Partial Approval JOSEPH MCGARRY
Green Building Rough 2/4/2022 Partial Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 2/4/2022 Partial Approval JOSEPH MCGARRY
Insulation 3/1/2022 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 3/23/2022 Not Ready for Inspection SHAVONNE ESPINOZA
ELECTRICAL-Rough 3/23/2022 Corrections Issued SHAVONNE ESPINOZA
Green Building Rough 3/23/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Verify Sprinkler Sign Off 3/23/2022 Not Ready for Inspection SHAVONNE ESPINOZA
Drywall Nailing 3/31/2022 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 3/31/2022 Partial Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 3/31/2022 Approved JOSEPH MCGARRY
Pre-Inspection 5/11/2022 Approved JOSEPH MCGARRY
Shower Pan 9/14/2022 Approved JOSEPH MCGARRY
Special/Order Compliance 9/16/2022 Corrections Issued JOSEPH MCGARRY
Interior/Exterior Lathing 9/21/2022 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 10/19/2022 Partial Approval JOSEPH MCGARRY
Pre-Inspection 10/19/2022 Partial Inspection JOSEPH MCGARRY
Rough-Elec/Plmb/HVAC 10/19/2022 Partial Approval JOSEPH MCGARRY
Pre-Inspection 10/21/2022 Partial Approval JOSEPH MCGARRY
Rough-Elec/Plmb/HVAC 10/21/2022 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 11/16/2022 Approved JOSEPH MCGARRY
Green Building Rough 11/16/2022 Approved JOSEPH MCGARRY
Insulation 11/16/2022 Approved JOSEPH MCGARRY
Drywall Nailing 11/22/2022 Approved JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 11/22/2022 Not Ready for Inspection JOSEPH MCGARRY
Gas Test 11/22/2022 Approved JOSEPH MCGARRY
ELECTRICAL-Final 12/2/2022 Approved JOSEPH MCGARRY
HVAC-Final 12/6/2022 Partial Approval JEFFREY MEAD
PLUMBING-Final 12/6/2022 Approved JEFFREY MEAD
Pre-Inspection 4/20/2023 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 4/20/2023 SGSOV Approved JOSEPH MCGARRY
Footing/Foundation/Slab 6/30/2023 Approved JOSEPH MCGARRY
Green Building Final 6/30/2023 Not Ready for Inspection JOSEPH MCGARRY
HVAC-Final 6/30/2023 Approved JOSEPH MCGARRY
Smoke Detectors 6/30/2023 Approved JOSEPH MCGARRY
Structural Steel Frame 6/30/2023 Approved JOSEPH MCGARRY
Sewer 2/23/2024 Not Ready for Inspection RICHARD DOCKUS
Final 3/21/2024 Corrections Issued ENRIQUE MIRELES
Final 4/8/2024 OK to Issue CofO ENRIQUE MIRELES
Green Building Final 4/8/2024 Approved ENRIQUE MIRELES