509 N LAS PALMAS AVE 90004

Certificate Information: 509 N LAS PALMAS AVE 90004

Application / Permit
18014-10000-06786
Plan Check / Job No.
B18LA25603
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1) NEW TWO-STORY ADDITION WITH A BASEMENT TO AN EXISTING TWO-STORY SINGLE FAMILY DWELLING. AND PARTIAL REMODEL OF EXISTING TWO-STORY SINGLE FAMILY DWELLING.
Permit Issued
Issued on 6/6/2019
Issuing Office
West Los Angeles
Current Status
CofO Issued on 4/1/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/29/2018 APPLICANT
Assigned to Plan Check Engineer 12/14/2018 RACHEL BEYENE
Corrections Issued 12/19/2018 RACHEL BEYENE
Quality Review Completed 12/26/2018 TEODORO DIAZ RODRIGUEZ
Building Plans Picked Up 12/27/2018 APPLICANT
Applicant returned to address corrections 1/8/2019 RACHEL BEYENE
Green Plans Picked Up 1/18/2019 APPLICANT
Applicant returned to address corrections 5/10/2019 RACHEL BEYENE
Applicant returned to address corrections 5/21/2019 RACHEL BEYENE
Plan Check Approved 5/30/2019 RAHEL BEYENE
Issued 6/6/2019 LADBS
CofO in Progress 3/16/2022 BRIAN SULLIVAN
Permit Finaled 4/1/2022 DEROLD HAUFF
CofO Issued 4/1/2022 DEROLD HAUFF
Permit Finaled 4/1/2022 DEROLD HAUFF

Permit Application Clearance Information

Certificate of Compliance Cleared 1/7/2019 MOTOUMI SASAKI
Eng Process Fee Ord 176,300 Cleared 1/7/2019 KAREN LE
Sewer availability Cleared 1/7/2019 KAREN LE
ZA Case Cleared 1/7/2019 SOPHIE GABEL-SCHEINBAU
Hydrant and Access approval Cleared 3/13/2019 GILBERT URREA
Green Code Cleared 4/2/2019 COLIN LOREDO
HPOZ Cleared 4/18/2019 SUKI GERSHENHORN
Hist. Property Cntrct Mgr Appr Cleared 4/18/2019 SUKI GERSHENHORN
GPI Written Notices Cleared 5/21/2019 RAHEL BEYENE
Grading Pre-Inspection Cleared 5/21/2019 RAHEL BEYENE
Low Impact Development Cleared 5/21/2019 RYAN HUDSON
Roof/Waste drainage to street Cleared 5/21/2019 VICTOR MENDOZA
ZI Cleared 5/21/2019 KIT AWAKUNI
Excavation more than 5-ft deep Cleared 5/30/2019 CALOSHA APPROVED

Contact Information

Contractor Valle/Reinis Builders Inc; Lic. No.: 839178-B 11661 SAN VICENTE BLVD STE 302      LOS ANGELES, CA 90049
Engineer Daugherty,, Daniel Thomas; Lic. No.: C76588 31129 VIA COLINAS STE 707      WESTLAKE VILLAGE, CA 91362
Engineer Peck,, Christopher Mount; Lic. No.: C58162 25 SOUTH EL MOLINO AVE      PASADENA, CA 911012023

Inspector Information

CRAIG VAUGHAN, (213) 202-3250 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/1/2019 Partial Inspection ROBERT CORNELL
Excavation/Setback/Form/Re-Bar 8/12/2019 Partial Inspection ROBERT CORNELL
Excavation/Setback/Form/Re-Bar 8/27/2019 Partial Inspection ROBERT CORNELL
METHANE-Subgrade 10/21/2019 Corrections Issued ROBERT CORNELL
PLUMBING-Rough 10/21/2019 Partial Approval ROBERT CORNELL
METHANE-Barrier 10/31/2019 Approved ROBERT CORNELL
Deputy Methane Barrier 11/1/2019 Conditional Approval ROBERT CORNELL
Excavation/Setback/Form/Re-Bar 11/12/2019 Partial Approval ROBERT CORNELL
Footing/Foundation/Slab 11/12/2019 Partial Approval ROBERT CORNELL
METHANE-Subgrade 11/12/2019 Approved ROBERT CORNELL
Gas Test 11/27/2019 Approved ROBERT CORNELL
PLUMBING-Rough 11/27/2019 Approved ROBERT CORNELL
Sewer 11/27/2019 Corrections Issued ROBERT CORNELL
Excavation/Setback/Form/Re-Bar 12/5/2019 Partial Approval ROBERT CORNELL
BUILDING-Rough-Frame 1/6/2020 Partial Approval ROBERT CORNELL
Green Building Rough 1/6/2020 Not Ready for Inspection ROBERT CORNELL
METHANE-Rough 1/6/2020 Approved ROBERT CORNELL
Floor/Roof Diaphrgm/Shear Wall 1/22/2020 Partial Approval ROBERT CORNELL
Floor/Roof Diaphrgm/Shear Wall 2/19/2020 Partial Approval ROBERT CORNELL
Underground Mechanical 2/19/2020 Partial Approval ROBERT CORNELL
Excavation/Setback/Form/Re-Bar 2/21/2020 Approved ROBERT CORNELL
Shower Pan 3/19/2020 Approved ROBERT CORNELL
Excavation/Setback/Form/Re-Bar 7/16/2020 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 7/27/2020 Corrections Issued ENRIQUE MIRELES
Interior/Exterior Lathing 7/28/2020 Partial Approval ENRIQUE MIRELES
Interior/Exterior Lathing 8/19/2020 Partial Approval JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 8/28/2020 Partial Approval ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 9/29/2020 Partial Inspection BRIAN SULLIVAN
HVAC-Rough 10/14/2020 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 10/14/2020 Partial Approval BRIAN SULLIVAN
Underground Mechanical 10/14/2020 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 10/16/2020 Partial Approval RAUL BARAJAS
BUILDING-Rough-Frame 10/22/2020 Partial Approval JOSEPH MCGARRY
Green Building Rough 10/22/2020 Partial Approval JOSEPH MCGARRY
Insulation 10/22/2020 Partial Approval JOSEPH MCGARRY
Drywall Nailing 11/10/2020 Partial Approval DONALD CRICHLOW
Green Building Rough 11/10/2020 Not Ready for Inspection DONALD CRICHLOW
Underground Mechanical 11/10/2020 Partial Approval DONALD CRICHLOW
BUILDING-Rough-Frame 11/24/2020 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 11/24/2020 Approved BRIAN SULLIVAN
Insulation 12/2/2020 Not Ready for Inspection BRIAN SULLIVAN
Interior/Exterior Lathing 12/2/2020 Not Ready for Inspection BRIAN SULLIVAN
Insulation 12/8/2020 Approved BRIAN SULLIVAN
Drywall Nailing 12/24/2020 Partial Approval JOSEPH MCGARRY
Underground Mechanical 12/24/2020 Partial Approval JOSEPH MCGARRY
Drywall Nailing 1/8/2021 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 2/10/2021 Not Ready for Inspection RAUL BARAJAS
Drywall Nailing 2/22/2021 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 3/4/2021 Not Ready for Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 3/10/2021 Approved BRIAN SULLIVAN
Gas Test 4/5/2021 Approved BRIAN SULLIVAN
Service/Power Release 5/13/2021 Approved BRIAN SULLIVAN
HVAC-Final 7/6/2021 Approved BRIAN SULLIVAN
ELECTRICAL-Final 7/20/2021 Approved BRIAN SULLIVAN
PLUMBING-Final 7/20/2021 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 12/2/2021 Approved BRIAN SULLIVAN
Final 12/2/2021 Corrections Issued BRIAN SULLIVAN
Footing/Foundation/Slab 12/2/2021 Approved BRIAN SULLIVAN
Green Building Final 12/2/2021 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 12/2/2021 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 12/2/2021 Approved BRIAN SULLIVAN
Final 3/16/2022 OK to Issue CofO BRIAN SULLIVAN