3710 N GLENALBYN DR 90065

Certificate Information: 3710 N GLENALBYN DR 90065

Application / Permit
18014-10000-03977
Plan Check / Job No.
B18LA14266
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
LOWER LEVEL ADDITION TO (E) SINGLE FAMILY RESIDENCE.
Permit Issued
Issued on 6/23/2020
Issuing Office
Metro
Current Status
Issued on 6/23/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/13/2018 APPLICANT
Green Plans Picked Up 8/9/2018 APPLICANT
Assigned to Plan Check Engineer 8/23/2018 GEORGE ALVAREZ
Corrections Issued 10/30/2018 GEORGE ALVAREZ
Quality Review Completed 11/6/2018 TEODORO DIAZ RODRIGUEZ
Building Plans Picked Up 11/14/2018 APPLICANT
Applicant returned to address corrections 7/16/2019 GEORGE ALVAREZ
Plan Check Approved 1/28/2020 GEORGE ALVAREZ
Issued 6/23/2020 LADBS

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 11/27/2018 JEANETTE VONG
BHO/Hillside ordinance Cleared 11/27/2018 NAZILA NOORIFAR
Eng Process Fee Ord 176,300 Cleared 11/27/2018 NAZILA NOORIFAR
Roof/Waste drainage to street Cleared 11/27/2018 NAZILA NOORIFAR
ZA Case Cleared 11/27/2018 DIANA JIMENEZ
ZA Case Cleared 11/27/2018 DIANA JIMENEZ
BHO/Hillside ordinance Cleared 12/4/2018 NAZILA NOORIFAR
Specific Plan Cleared 1/22/2019 SANTOS SANCHEZ
Green Code Cleared 6/24/2019 GEORGE ALVAREZ
Hydrant and Access approval Cleared 6/24/2019 ROBERT DUFF
GPI Written Notices Cleared 7/16/2019 GEORGE ALVAREZ
Grading Pre-Inspection Cleared 7/16/2019 GEORGE ALVAREZ

Contact Information

Architect Fader, Steven Wayne; Lic. No.: C21080 541 N. GOWER STREET      LOS ANGELES, CA 90004
Contractor Omega Contractors Inc; Lic. No.: 1026633-A 8039 FULTON AVENUE      NORTH HOLLYWOOD, CA 91605
Engineer Craig, Phillips Engineering And Design; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/30/2020 Corrections Issued OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 9/18/2020 Corrections Issued RUBEN SALAS
Deputy Drilled-In Anchors 9/24/2020 No Access for Inspection ELMER BLAND
Excavation/Setback/Form/Re-Bar 9/28/2020 Partial Approval OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 10/5/2020 Partial Approval SCOTT FINNILA
Deputy Drilled-In Anchors 10/19/2020 Partial Approval OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 10/21/2020 Partial Approval OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 11/2/2020 Partial Approval OSVALDO PARAMO
Deputy Drilled-In Anchors 11/6/2020 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 11/6/2020 Partial Approval OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 11/12/2020 Partial Approval OSVALDO PARAMO
Footing/Foundation/Slab 11/19/2020 Partial Approval OSVALDO PARAMO
PLUMBING-Rough 11/25/2020 Partial Approval COREY HUPP
Deputy Drilled-In Anchors 12/9/2020 Partial Approval OSVALDO PARAMO
Footing/Foundation/Slab 12/11/2020 Partial Approval OSVALDO PARAMO
Deputy Drilled-In Anchors 12/18/2020 Partial Approval OSVALDO PARAMO
Footing/Foundation/Slab 12/22/2020 Approved OSVALDO PARAMO
PLUMBING-Rough 12/22/2020 Partial Approval OSVALDO PARAMO
PLUMBING-Rough 12/23/2020 Partial Approval OSVALDO PARAMO
Deputy Drilled-In Anchors 2/8/2021 Conditional Approval THOMAS LOGRASSO
PLUMBING-Rough 2/11/2021 Not Ready for Inspection OSVALDO PARAMO
BUILDING-Rough-Frame 2/16/2021 Approved OSVALDO PARAMO
ELECTRICAL-Rough 2/16/2021 Approved OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 2/16/2021 Approved OSVALDO PARAMO
Green Building Rough 2/16/2021 Approved OSVALDO PARAMO
HVAC-Rough 2/16/2021 Approved OSVALDO PARAMO
PLUMBING-Rough 2/16/2021 Approved OSVALDO PARAMO
Interior/Exterior Lathing 3/3/2021 Partial Approval OSVALDO PARAMO
Interior/Exterior Lathing 3/9/2021 Partial Approval OSVALDO PARAMO
Shower Pan 3/10/2021 Approved CRAIG VAUGHAN
Insulation 3/11/2021 Approved OSVALDO PARAMO
Drywall Nailing 3/15/2021 Approved OSVALDO PARAMO
Interior/Exterior Lathing 3/16/2021 Approved OSVALDO PARAMO
ELECTRICAL-Final 5/24/2021 Approved OSVALDO PARAMO
HVAC-Final 5/24/2021 Approved OSVALDO PARAMO
PLUMBING-Final 5/24/2021 Approved OSVALDO PARAMO
Final 10/18/2021 Corrections Issued OSVALDO PARAMO
Green Building Final 10/18/2021 Approved OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 10/18/2021 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 10/18/2021 Not Ready for Inspection OSVALDO PARAMO