128 E REEF MALL 90292

Certificate Information: 128 E REEF MALL 90292

Application / Permit
18014-10000-03915
Plan Check / Job No.
B18LA14020
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED 3RD FLR. ADDITION AT EXISTING 3RD LEVEL ROOF DECK. EXTEND (E) STAIR TO 3RD FLOOR. CREATE ENCLOSED ATRIUM IN THE (E) COURTYARD. TOTAL PROPOSED ADDITION OF 1,034 SF, TOTAL PROPOSED HEIGHT 37' KEEP (E) SIDE YARD SETBACK. REMODEL EXSITING SFD.
Permit Issued
Issued on 9/30/2019
Issuing Office
Valley
Current Status
CofO Issued on 6/7/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/11/2018 APPLICANT
Green Plans Picked Up 8/3/2018 APPLICANT
Assigned to Plan Check Engineer 8/9/2018 JOHN VASQUEZ
Corrections Issued 8/28/2018 JOHN VASQUEZ
Quality Review Completed 8/28/2018 CHARLES CHANG
Building Plans Picked Up 8/30/2018 APPLICANT
Applicant returned to address corrections 12/18/2018 JOHN VASQUEZ
Plan Check Approved 3/26/2019 JOHN VASQUEZ
Issued 9/30/2019 LADBS
CofO in Progress 6/2/2025 JESUS RODRIGUEZ
Permit Finaled 6/7/2025 RICHARD STEINBACH
CofO Issued 6/7/2025 RICHARD STEINBACH
Permit Finaled 6/7/2025 RICHARD STEINBACH

Permit Application Clearance Information

Hydrant and Access approval Cleared 8/31/2018 JOHN CONNEALLY
Sewer availability Cleared 8/31/2018 ADRIAN SANCHEZ
Specific Plan Cleared 8/31/2018 TAIMOUR TANAVOLI
Eng Process Fee Ord 176,300 Cleared 9/17/2018 STEVE MELGAR
Low Impact Development Cleared 11/14/2018 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 11/14/2018 ADRIAN SANCHEZ
Green Code Cleared 11/15/2018 KHEDER ALRAZAA
CPC Cleared 12/4/2018 EDBER MACEDO
CPC Cleared 12/4/2018 EDBER MACEDO
CPC Cleared 12/4/2018 EDBER MACEDO
Coastal Zone Cleared 12/4/2018 EDBER MACEDO
Frnt yard landscape/Water mgmt Cleared 12/4/2018 EDBER MACEDO
Specific Plan Cleared 12/4/2018 EDBER MACEDO
ZA Case Cleared 12/4/2018 EDBER MACEDO
ZA Case Cleared 12/4/2018 EDBER MACEDO
ZA Case Cleared 12/4/2018 EDBER MACEDO
ZA Case Cleared 12/4/2018 EDBER MACEDO
ZA Case Cleared 12/4/2018 EDBER MACEDO
ZI Cleared 12/4/2018 EDBER MACEDO

Contact Information

Architect Keller, Andrea Marie; Lic. No.: C28707 724 S SPRING STREET # 701      LOS ANGELES, CA 90014
Contractor Hanover Builders Inc; Lic. No.: 709353-B 141 DUESENBERG DRIVE STE 6      WESTLAKE VILLAGE, CA 91362
Engineer Nastarin, Hooman; Lic. No.: C62199 554 S SAN VICNETE BLVD 202      LOS ANGELES, CA 90048

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/17/2020 Partial Approval DAVID HEINE
Footing/Foundation/Slab 11/2/2020 Partial Approval DAVID HEINE
METHANE-Barrier 11/2/2020 Approved DAVID HEINE
METHANE-Subgrade 11/2/2020 Approved DAVID HEINE
Deputy Reinf. Concrete 1/5/2021 Partial Approval DAVID HEINE
Deputy Drilled-In Anchors 2/12/2021 Partial Approval DAVID HEINE
Underground Mechanical 4/22/2021 Partial Approval MATT KELLERMAN
Deputy Drilled-In Anchors 4/30/2021 Conditional Approval JOHNNY MIRANDA
Footing/Foundation/Slab 5/4/2021 Partial Approval JOHNNY MIRANDA
PLUMBING-Rough 6/11/2021 Partial Approval PIERRE VEGA
PLUMBING-Rough 7/14/2021 Approved JOHNNY MIRANDA
Floor/Roof Diaphrgm/Shear Wall 8/6/2021 Partial Approval JOHNNY MIRANDA
Insulation 8/23/2021 Partial Approval JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 9/23/2021 Approved JOHNNY MIRANDA
Green Building Rough 9/23/2021 Not Ready for Inspection JOHNNY MIRANDA
METHANE-Rough 9/23/2021 Approved JOHNNY MIRANDA
HVAC-Rough 12/1/2021 Approved ENRIQUE MIRELES
Wood Frame 1/11/2022 Partial Approval DAVID FEILER
Interior/Exterior Lathing 2/9/2022 Partial Approval DAVID FEILER
ELECTRICAL-Rough 3/10/2022 Approved BOBBY KEY
BUILDING-Rough-Frame 4/8/2022 Approved DAVID FEILER
Green Building Rough 4/8/2022 Approved DAVID FEILER
Verify Sprinkler Sign Off 4/8/2022 Approved DAVID FEILER
Insulation 5/19/2022 Conditional Approval JESUS RODRIGUEZ
Drywall Nailing 6/13/2022 Partial Approval JESUS RODRIGUEZ
Drywall Nailing 8/15/2022 Partial Approval STEPHANIE SWANSON
Interior/Exterior Lathing 1/6/2023 Corrections Issued EVAN COOPER
Shower Pan 1/9/2023 Order to Comply Issued EVAN COOPER
Drywall Nailing 12/20/2023 Partial Approval HERBERT GIRON
Gas Test 5/16/2024 Approved HERBERT GIRON
ELECTRICAL-Final 9/13/2024 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 9/16/2024 Corrections Issued HERBERT GIRON
PLUMBING-Final 9/16/2024 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 9/16/2024 SGSOV Approved HERBERT GIRON
HVAC-Final 9/25/2024 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 9/26/2024 Corrections Issued HERBERT GIRON
Final 9/26/2024 Corrections Issued HERBERT GIRON
Footing/Foundation/Slab 9/26/2024 Approved HERBERT GIRON
Green Building Final 9/26/2024 Approved HERBERT GIRON
HVAC-Final 9/26/2024 Approved HERBERT GIRON
Smoke Detectors 9/26/2024 Approved HERBERT GIRON
Final 12/17/2024 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 5/30/2025 Approved JESUS RODRIGUEZ
Final 5/30/2025 OK to Issue CofO JESUS RODRIGUEZ
Service/Power Release 5/30/2025 Approved JESUS RODRIGUEZ