8233 N DE GARMO AVE 91352

Certificate Information: 8233 N DE GARMO AVE 91352

Application / Permit
18014-10000-01983
Plan Check / Job No.
B18LA07193
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Major remodeling: Reframe roof with new trusses, remove majority of interior and rebuild with additons of 28.25' x 19.83' for bedrooms, 6' x 11.83' attached porch and 20' x 22' attached carport. All works are per engineering.
Permit Issued
Issued on 8/15/2018
Issuing Office
Valley
Current Status
CofO Corrected on 1/30/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/13/2018 APPLICANT
Assigned to Plan Check Engineer 5/3/2018 ALDOUS CHIC
Corrections Issued 5/7/2018 ALDOUS CHIC
Quality Review Completed 5/7/2018 BINH PHAN
Green Plans Picked Up 5/11/2018 APPLICANT
Building Plans Picked Up 6/4/2018 APPLICANT
Applicant returned to address corrections 8/9/2018 ALDOUS CHIC
Plan Check Approved 8/15/2018 ALDOUS CHIC
Issued 8/15/2018 LADBS
CofO in Progress 9/9/2019 SEAN WIRCH
CofO Issued-Status Void 2/22/2020 MICHAEL SMITH
Permit Finaled-Status Void 2/22/2020 MICHAEL SMITH
Re-Activate Permit 1/23/2025 RUBEN SALAS
Permit Finaled 1/30/2025 RUBEN SALAS
CofO Corrected 1/30/2025 RUBEN SALAS
Permit Finaled 1/30/2025 RUBEN SALAS

Permit Application Clearance Information

Address approval Cleared 7/20/2018 MICHAEL CASTILLO
Eng Process Fee Ord 176,300 Cleared 7/20/2018 MICHAEL CASTILLO
Sewer availability Cleared 7/20/2018 MICHAEL CASTILLO
Low Impact Development Cleared 7/26/2018 RYAN HUDSON
Roof/Waste drainage to street Cleared 7/26/2018 NAZILA NOORIFAR
Green Code Cleared 8/7/2018 SARAH ABOULHOSN

Contact Information

Contractor Lnh Construction Company; Lic. No.: 908731-B 16425 AVENUE 352      VISALIA, CA 93292
Engineer Divina, Rafael Detablan; Lic. No.: C30011 624 GRANADA DRIVE      MADERA, CA 93637
Engineer Tangren, Russell Toupal; Lic. No.: C72160 1301 CHESTNUT LANE      DAVIS, CA 95616

Inspector Information

MATTHEW NELSON, (818) 374-1168 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/21/2018 Not Ready for Inspection LEE HELLINGER
Excavation/Setback/Form/Re-Bar 8/22/2018 Approved LEE HELLINGER
Footing/Foundation/Slab 8/22/2018 Approved LEE HELLINGER
Floor/Roof Diaphrgm/Shear Wall 10/3/2018 Not Ready for Inspection LEE HELLINGER
Wood Frame 10/3/2018 Not Ready for Inspection LEE HELLINGER
Floor/Roof Diaphrgm/Shear Wall 10/25/2018 Partial Approval JOHN HAYES
ELECTRICAL-Rough 11/1/2018 Not Ready for Inspection COREY HUPP
HVAC-Rough 11/1/2018 Not Ready for Inspection COREY HUPP
PLUMBING-Rough 11/1/2018 Partial Approval COREY HUPP
BUILDING-Rough-Frame 11/8/2018 Partial Inspection LEE HELLINGER
ELECTRICAL-Rough 11/8/2018 Approved LEE HELLINGER
Green Building Rough 11/8/2018 Partial Approval LEE HELLINGER
HVAC-Rough 11/8/2018 Approved LEE HELLINGER
MERV13>=Rough 11/8/2018 Approved LEE HELLINGER
PLUMBING-Rough 11/8/2018 Corrections Issued LEE HELLINGER
BUILDING-Rough-Frame 12/31/2018 Corrections Issued PIERRE VEGA
ELECTRICAL-Rough 12/31/2018 Corrections Issued PIERRE VEGA
Footing/Foundation/Slab 12/31/2018 Corrections Issued PIERRE VEGA
PLUMBING-Rough 12/31/2018 Corrections Issued PIERRE VEGA
BUILDING-Rough-Frame 1/9/2019 Not Ready for Inspection BEAU COLLINS
PLUMBING-Rough 1/9/2019 Not Ready for Inspection BEAU COLLINS
PLUMBING-Rough 1/11/2019 Partial Approval BEAU COLLINS
BUILDING-Rough-Frame 1/18/2019 Conditional Approval BEAU COLLINS
Floor/Roof Diaphrgm/Shear Wall 2/1/2019 Partial Approval MICHEL ABAJAN
Insulation 2/1/2019 Not Ready for Inspection MICHEL ABAJAN
Interior/Exterior Lathing 2/1/2019 Approved MICHEL ABAJAN
BUILDING-Rough-Frame 2/5/2019 Approved BEAU COLLINS
Green Building Rough 2/5/2019 Approved BEAU COLLINS
Drywall Nailing 2/13/2019 Approved BEAU COLLINS
Interior/Exterior Lathing 2/13/2019 Approved BEAU COLLINS
Gas Test 3/27/2019 Approved BEAU COLLINS
Service/Power Release 3/27/2019 Not Ready for Inspection BEAU COLLINS
Service/Power Release 4/29/2019 Approved BEAU COLLINS
Final 8/16/2019 Corrections Issued BEAU COLLINS
Final 8/28/2019 Corrections Issued BEAU COLLINS
ELECTRICAL-Final 9/6/2019 Approved SEAN WIRCH
Final 9/6/2019 OK to Issue CofO SEAN WIRCH
Footing/Foundation/Slab 9/6/2019 Approved SEAN WIRCH
Green Building Final 9/6/2019 Approved SEAN WIRCH
HVAC-Final 9/6/2019 Approved SEAN WIRCH
MERV13>=Final 9/6/2019 Approved SEAN WIRCH
PLUMBING-Final 9/6/2019 Approved SEAN WIRCH
SGSOV-Seismic Gas S/O Valve 9/6/2019 SGSOV Approved SEAN WIRCH
Smoke Detectors 9/6/2019 Approved SEAN WIRCH