Deputy Drilled-In Anchors
|
2/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/11/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
2/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
2/22/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/4/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
4/5/2019
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
4/5/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/5/2019
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
4/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Green Building Rough
|
4/18/2019
|
Approved
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
4/18/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
4/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
5/6/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
5/6/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
5/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
5/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/3/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
6/3/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/4/2019
|
Approved
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
6/18/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
7/1/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
7/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
7/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
7/12/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/19/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
7/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
8/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2019
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/15/2019
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
8/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
8/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
8/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
8/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
8/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2019
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/10/2019
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
9/10/2019
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
9/11/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
9/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
9/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
12/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
12/4/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
12/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
12/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
1/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/14/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/16/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/23/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
1/23/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
1/24/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
1/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/30/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/11/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/11/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/12/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/24/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/26/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
3/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
4/16/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/16/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/11/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
7/8/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
7/15/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/15/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/17/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
7/24/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
8/7/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
8/11/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
8/11/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
9/10/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
9/15/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
9/25/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
9/25/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
9/25/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
10/13/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
10/13/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Fireproofing
|
10/14/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Fireproofing
|
10/15/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Fireproofing
|
10/16/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Fireproofing
|
10/19/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Fireproofing
|
10/20/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
11/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
11/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
11/4/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
11/25/2020
|
Partial Inspection
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
11/25/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
12/1/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
12/8/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
12/8/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
12/8/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
12/18/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
1/19/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
1/19/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
1/25/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
1/27/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
1/27/2021
|
Corrections Issued
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/1/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/8/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
2/18/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/18/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Insulation
|
2/25/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/25/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
3/2/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/2/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
3/9/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/9/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
3/26/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
3/26/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
4/13/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
4/15/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Special/Order Compliance
|
5/20/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Final
|
9/17/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
9/17/2021
|
Approved
|
DANIEL COLLINS
|
|
Green Building Final
|
9/17/2021
|
Approved
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
9/17/2021
|
Approved
|
DANIEL COLLINS
|
|
SGSOV-Seismic Gas S/O Valve
|
9/17/2021
|
SGSOV Approved
|
DANIEL COLLINS
|
|
Smoke Detectors
|
9/17/2021
|
Approved
|
DANIEL COLLINS
|
|
Final
|
9/23/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Final
|
11/1/2021
|
Conditional Approval
|
DANIEL COLLINS
|