4248 N BARRETT ROAD 90032

Certificate Information: 4248 N BARRETT ROAD 90032

Application / Permit
18010-30000-06332
Plan Check / Job No.
B18WL08051
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 3-STORY TYPE VB SINGLE FAMILY DWELLING WITH ATTACHED GARAGE, EQUIPPED THROUGHOUT WITH NFPA 13D FIRE SPRINKLERS.
Permit Issued
Issued on 10/30/2023
Issuing Office
West Los Angeles
Current Status
Issued on 10/30/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/26/2018 APPLICANT
Assigned to Plan Check Engineer 1/9/2019 MANUEL GARCIA
Corrections Issued 1/14/2019 MANUEL GARCIA
Quality Review Completed 1/24/2019 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 5/9/2019 MANUEL GARCIA
Applicant returned to address corrections 6/14/2019 MANUEL GARCIA
Applicant returned to address corrections 8/1/2019 MANUEL GARCIA
Applicant returned to address corrections 12/5/2019 MANUEL GARCIA
Applicant returned to address corrections 1/14/2020 MANUEL GARCIA
Applicant returned to address corrections 2/26/2020 MANUEL GARCIA
Applicant returned to address corrections 3/24/2020 MANUEL GARCIA
Plan Check Approved 3/27/2020 MANUEL GARCIA
Building Plans Picked Up 9/8/2020 APPLICANT
Green Plans Picked Up 9/8/2020 APPLICANT
Issued 10/30/2023 APPLICANT

Permit Application Clearance Information

CPC Cleared 5/15/2019 TREVOR MARTIN
Miscellaneous Cleared 5/15/2019 TREVOR MARTIN
ZI Cleared 5/15/2019 TREVOR MARTIN
Construction near power lines Cleared 5/23/2019 RIDWAN HARDY
Trees in Parkway Cleared 6/3/2019 JOHN KIM
Hydrant and Access approval Cleared 6/11/2019 GEORGE SUCHAND
Address approval Cleared 6/19/2019 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 6/19/2019 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 6/19/2019 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 6/19/2019 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 6/19/2019 LEE GUILBEAUX
Permit Cleared 6/21/2019 LEE GUILBEAUX
Low Impact Development Cleared 7/29/2019 MITESH PATEL
"D" conditions Cleared 9/10/2019 DIANA JIMENEZ
"Q" conditions Cleared 9/10/2019 DIANA JIMENEZ
Disturb/Remove Protected Trees Cleared 9/10/2019 ADRIAN SANCHEZ
Landscape for retaining wall Cleared 9/10/2019 DIANA JIMENEZ
Miscellaneous Cleared 9/10/2019 DIANA JIMENEZ
Roof/Waste drainage to street Cleared 10/30/2019 MARKOS PEREZ-BRAN
Sewer availability Cleared 10/30/2019 MARKOS PEREZ-BRAN
Work Adjacent to Public Way Cleared 11/13/2019 ARMEN SARKISIAN
Encroachment in public way Cleared 11/25/2019 ELENA LOPEZ
Building over 3-story or 36-ft Cleared 2/26/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 2/26/2020 CALOSHA APPROVED
Grading Pre-Inspection Cleared 2/26/2020 MANUEL GARCIA
Green Code Cleared 3/5/2020 RICHARD GARCIA

Contact Information

Architect Heeb,, Derek M; Lic. No.: C32338 406 BROADWAY 222C      SANTA MONICA, CA 90401
Contractor Top Star Usa Construction Inc; Lic. No.: 1067089-B 4127 WALNUT GROVE APT A      ROSEMEAD, CA 91770
Engineer Manesh,, Behnam Abraham; Lic. No.: C38454 17337 VENTURA BLVD STE 112      ENCINO, CA 91316

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/11/2023 Partial Inspection AMY COLIN
Excavation/Setback/Form/Re-Bar 1/18/2024 Corrections Issued AMY COLIN
Footing/Foundation/Slab 1/18/2024 Not Ready for Inspection AMY COLIN
Protected Tree Letter 1/18/2024 Not Ready for Inspection AMY COLIN
Excavation/Setback/Form/Re-Bar 1/24/2024 Partial Approval AMY COLIN
Masonry Wall/Backfill 2/13/2024 Corrections Issued LILIANA PORTILLO
Deputy Reinf. Concrete 2/20/2024 No Access for Inspection LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 3/12/2024 Partial Approval LILIANA PORTILLO
Deputy Reinf. Concrete 8/14/2024 Conditional Approval LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 8/20/2024 Corrections Issued LILIANA PORTILLO
Piling/Pier/Caisson 8/20/2024 Corrections Issued LILIANA PORTILLO
Piling/Pier/Caisson 9/18/2024 Partial Inspection THOMAS LOGRASSO
Protected Tree Letter 9/18/2024 Corrections Issued THOMAS LOGRASSO
Footing/Foundation/Slab 12/3/2024 Corrections Issued LILIANA PORTILLO
Piling/Pier/Caisson 12/3/2024 Corrections Issued LILIANA PORTILLO
Protected Tree Letter 12/3/2024 Approved LILIANA PORTILLO
Deputy Reinf. Concrete 12/17/2024 Conditional Approval LILIANA PORTILLO
Reinforced Concrete Frame 1/17/2025 Corrections Issued LILIANA PORTILLO
Deputy Drilled-In Anchors 2/19/2025 Approved LILIANA PORTILLO
Footing/Foundation/Slab 2/19/2025 Partial Approval LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 2/24/2025 Approved LILIANA PORTILLO
PLUMBING-Rough 2/24/2025 Partial Approval LILIANA PORTILLO
Deputy Reinf. Concrete 4/10/2025 Conditional Approval LILIANA PORTILLO
BUILDING-Rough-Frame 4/14/2025 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 4/14/2025 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 4/21/2025 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 4/21/2025 Partial Approval LILIANA PORTILLO
Deputy Steel/Welding 4/29/2025 Conditional Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/27/2025 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 6/17/2025 Not Ready for Inspection LILIANA PORTILLO
Piling/Pier/Caisson 6/17/2025 Not Ready for Inspection LILIANA PORTILLO
Deputy Steel/Welding 6/23/2025 Conditional Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 7/1/2025 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 10/3/2025 Partial Approval LILIANA PORTILLO
BUILDING-Rough-Frame 10/20/2025 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Rough 10/20/2025 Corrections Issued LILIANA PORTILLO
HVAC-Rough 10/20/2025 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 10/20/2025 Corrections Issued LILIANA PORTILLO
Verify Sprinkler Sign Off 10/20/2025 Approved LILIANA PORTILLO
ELECTRICAL-Rough 10/23/2025 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Rough 10/23/2025 Not Ready for Inspection LILIANA PORTILLO
HVAC-Rough 10/24/2025 Corrections Issued LILIANA PORTILLO
Deputy Wood Construction 10/28/2025 Conditional Approval LILIANA PORTILLO
BUILDING-Rough-Frame 10/30/2025 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 10/30/2025 Approved LILIANA PORTILLO
HVAC-Rough 10/30/2025 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 11/20/2025 Corrections Issued LILIANA PORTILLO
Insulation 12/10/2025 Corrections Issued LILIANA PORTILLO
Interior/Exterior Lathing 12/10/2025 Not Ready for Inspection LILIANA PORTILLO
Interior/Exterior Lathing 12/18/2025 Partial Approval LILIANA PORTILLO
Insulation 1/13/2026 Partial Approval RONNIE MEDINA
Drywall Nailing 2/24/2026 Approved GEM DE OCAMPO
Shower Pan 3/10/2026 Approved LILIANA PORTILLO
Interior/Exterior Lathing 3/20/2026 Approved LILIANA PORTILLO