Piling/Pier/Caisson
|
5/18/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
6/15/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/16/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Piling/Pier/Caisson
|
6/29/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
8/1/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/9/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
8/19/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
12/14/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
12/15/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
12/20/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
12/20/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
12/23/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
2/14/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
3/14/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
4/3/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
4/3/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
4/3/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
4/3/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
4/3/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
5/3/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
5/3/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/4/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Grounding or Bonding
|
5/4/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/5/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/8/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/8/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/10/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
5/15/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/18/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/19/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
5/25/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
6/1/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Shotcrete
|
6/21/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
6/26/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/26/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/26/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
6/26/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
8/1/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/1/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
8/1/2023
|
Partial Inspection
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
8/3/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/4/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
8/23/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/23/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
8/23/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/25/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/29/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
PLUMBING-Rough
|
9/5/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
9/5/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
9/6/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/14/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Footing/Foundation/Slab
|
9/15/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/19/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/26/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Underground Mechanical
|
11/2/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
11/13/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
11/13/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
11/17/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
11/20/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
11/20/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
11/27/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
12/7/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
12/8/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Drilled-In Anchors
|
12/15/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
12/15/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/15/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/28/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/2/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
1/30/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
1/30/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
1/31/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
2/9/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Underground Mechanical
|
2/16/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
2/23/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
2/27/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/22/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/2/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
4/4/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
4/18/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
4/25/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
4/25/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
4/29/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
7/29/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/20/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/23/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/26/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/27/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
9/30/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
10/1/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
10/2/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Wood Construction
|
10/4/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
10/10/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
10/11/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Final
|
10/11/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
10/29/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
10/29/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
11/22/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
11/26/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/27/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
11/27/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
11/27/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/3/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/5/2024
|
Not Ready for Inspection
|
BOBBY KEY
|
|
BUILDING-Rough-Frame
|
12/13/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/14/2025
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
1/16/2025
|
Approved
|
CARLOS MATAMOROS
|
|
Special/Order Compliance
|
1/16/2025
|
Approved
|
DANIEL VERA
|
|
Special/Order Compliance
|
1/16/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Special/Order Compliance
|
1/16/2025
|
Partial Inspection
|
MEL KHACHATOURIAN
|
|
Special/Order Compliance
|
1/16/2025
|
Partial Inspection
|
MICHAEL PELHAM
|
|
Special/Order Compliance
|
1/16/2025
|
Partial Inspection
|
REGINA MENDEZ
|
|
Special/Order Compliance
|
1/16/2025
|
Partial Inspection
|
STEPHANIE SWANSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
1/31/2025
|
Conditional Approval
|
MICHAEL PELHAM
|
|
PLUMBING-Rough
|
2/14/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Pre-Inspection
|
2/14/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
3/21/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/1/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
4/1/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pool Piping
|
4/1/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
4/1/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
4/1/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
4/4/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
4/4/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
4/4/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
4/4/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
4/9/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/10/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/23/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/1/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
5/5/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/7/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/12/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
5/13/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
5/14/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
5/14/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
5/15/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
5/16/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
5/22/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Structural Steel Frame
|
5/22/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Deputy Steel/Welding
|
5/27/2025
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
5/28/2025
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Drilled-In Anchors
|
6/2/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
6/2/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
6/2/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
6/2/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
6/2/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
6/3/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
6/3/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
6/3/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
6/3/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/5/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/5/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
6/5/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
6/5/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
6/5/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
6/5/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
6/10/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/10/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/10/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
6/10/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
6/13/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
6/16/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/16/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
6/16/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
6/17/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/17/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
6/18/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/20/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
6/20/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
6/25/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
6/26/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
6/27/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
6/27/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/3/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
7/7/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/7/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
7/7/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
7/7/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/7/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
7/10/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
7/10/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/14/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
7/14/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/15/2025
|
Partial Approval
|
MEL KHACHATOURIAN
|
|
Drywall Nailing
|
7/16/2025
|
Not Ready for Inspection
|
HENRY KIM
|
|
Interior/Exterior Lathing
|
7/16/2025
|
Partial Approval
|
HENRY KIM
|
|
ELECTRICAL-Rough
|
7/17/2025
|
Partial Inspection
|
STEPHANIE SWANSON
|
|
Drywall Nailing
|
7/18/2025
|
Partial Approval
|
MICHAEL PELHAM
|
|
ELECTRICAL-Rough
|
7/22/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
7/22/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
7/24/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/28/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/28/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Insulation
|
7/28/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/29/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
7/30/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
7/31/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Insulation
|
8/1/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/1/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
8/4/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Insulation
|
8/4/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/4/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
8/7/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
8/7/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
8/11/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
8/11/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/12/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
8/12/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/18/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
8/20/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/20/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
8/20/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
8/29/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
8/29/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
9/3/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
Gas Test
|
9/22/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
9/22/2025
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Gas Test
|
10/2/2025
|
Not Ready for Inspection
|
JAYLIN GRAVITTE
|
|
Deputy Steel/Welding
|
10/3/2025
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Gas Test
|
10/17/2025
|
Approved
|
CARLOS MATAMOROS
|
|
Order to Comply
|
10/21/2025
|
Not Required
|
CARLOS MATAMOROS
|
|
Pre-Inspection
|
10/21/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Pre-Inspection
|
10/24/2025
|
Corrections Issued
|
SEAN HAUPT
|
|
ELECTRICAL-Final
|
11/6/2025
|
Approved
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Final
|
11/7/2025
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
11/19/2025
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Special/Order Compliance
|
11/19/2025
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Gas Test
|
12/3/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
12/3/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/5/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/9/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
12/11/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/11/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
12/11/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/12/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
12/12/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/15/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/17/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deck
|
12/18/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/18/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Enclosure/Fence
|
12/18/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/18/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/18/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/19/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/19/2025
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/22/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/23/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/23/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/23/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/24/2025
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Final
|
12/24/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
12/24/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/24/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/24/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
12/24/2025
|
SGSOV Not Ready
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
12/24/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/25/2025
|
Off-Hour Fees Due
|
|
|
HVAC-Final
|
12/25/2025
|
Off-Hour Fees Due
|
|
|
PLUMBING-Final
|
12/25/2025
|
Off-Hour Fees Due
|
|
|
ELECTRICAL-Final
|
12/26/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/26/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/26/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/29/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/29/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/30/2025
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/30/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/31/2025
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
1/2/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
1/2/2026
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
1/2/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
1/2/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
1/2/2026
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
1/2/2026
|
SGSOV Not Ready
|
CHRISTOPHER WILSON
|
|
Sewer
|
1/2/2026
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
1/2/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
1/3/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
1/6/2026
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
1/6/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
1/6/2026
|
SGSOV Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
1/7/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
1/14/2026
|
OK to Issue CofO
|
CHRISTOPHER WILSON
|