321 N CLIFFWOOD AVE 90049

Certificate Information: 321 N CLIFFWOOD AVE 90049

Application / Permit
18010-30000-02599
Plan Check / Job No.
B18WL03524
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW SINGLE FAMILY DWELLING WITH ATTACHEDS GARAGE AND BASEMENT.
Permit Issued
Issued on 1/16/2019
Issuing Office
West Los Angeles
Current Status
Issued on 1/16/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/1/2018 APPLICANT
Assigned to Plan Check Engineer 7/5/2018 KAMRAN GHOTBI RAVANDI
Corrections Issued 7/9/2018 KAMRAN GHOTBI RAVANDI
Quality Review Completed 7/11/2018 JASON HEALEY
Building Plans Picked Up 7/12/2018 APPLICANT
Applicant returned to address corrections 10/30/2018 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 11/13/2018 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 12/6/2018 KAMRAN GHOTBI RAVANDI
Plan Check Approved 1/16/2019 KAMRAN GHOTBI RAVANDI
Issued 1/16/2019 LADBS
Green Plans Picked Up 11/13/2019 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 7/12/2018 STEVEN JIN
Permit Cleared 7/12/2018 STEVEN JIN
Sewer availability Cleared 7/12/2018 STEVEN JIN
Hydrant and Access approval Cleared 11/2/2018 GEORGE SUCHAND
Encroachment in public way Cleared 11/16/2018 HISASHI KOBAYAKAWA
Excavation more than 5-ft deep Cleared 12/6/2018 CALOSHA APPROVED
Low Impact Development Cleared 12/7/2018 MITESH PATEL
Green Code Cleared 12/12/2018 RICHARD GARCIA
Roof/Waste drainage to street Cleared 12/12/2018 TAO YANG

Contact Information

Contractor Holz Richard Inc; Lic. No.: 294504-B 520 S SEPULVEDA BLVD #407      LOS ANGELES, CA 90049
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Kwan, Denny Chi-Ho; Lic. No.: S4887 5638 NEWFIELDS LN      DUBLIN, CA 94568
Geologist Hollingsworth, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 6/7/2019 Partial Approval RICHARD STEINBACH
Excavation/Setback/Form/Re-Bar 6/18/2019 Partial Approval RICHARD STEINBACH
Excavation/Setback/Form/Re-Bar 6/27/2019 Partial Approval TIM CHRISTENSEN
Footing/Foundation/Slab 8/16/2019 Partial Approval DAVID FEILER
Deputy Reinf. Concrete 8/21/2019 Approved TIM CHRISTENSEN
Underground Mechanical 8/21/2019 Partial Approval TIM CHRISTENSEN
Footing/Foundation/Slab 9/16/2019 Partial Approval TIM CHRISTENSEN
Footing/Foundation/Slab 9/25/2019 Partial Approval TIM CHRISTENSEN
Footing/Foundation/Slab 10/7/2019 Partial Approval TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 10/10/2019 Partial Approval TIM CHRISTENSEN
Grounding or Bonding 10/15/2019 Approved TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 10/22/2019 Partial Approval DAVID FEILER
Excavation/Setback/Form/Re-Bar 11/26/2019 Partial Approval TIM CHRISTENSEN
Special/Order Compliance 11/26/2019 Corrections Issued TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 12/18/2019 Partial Approval TIM CHRISTENSEN
Deputy Reinf. Concrete 12/20/2019 Approved TIM CHRISTENSEN
Footing/Foundation/Slab 1/22/2020 Partial Approval TIM CHRISTENSEN
Deputy Steel/Welding 2/11/2020 Conditional Approval TIM CHRISTENSEN
Footing/Foundation/Slab 3/3/2020 Not Ready for Inspection TIM CHRISTENSEN
Deputy Drilled-In Anchors 3/5/2020 Conditional Approval TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 3/5/2020 Partial Approval ROBERT SHELLY
Footing/Foundation/Slab 3/6/2020 Partial Approval TIM CHRISTENSEN
Deputy Reinf. Concrete 3/9/2020 Approved ROBERT SHELLY
Green Building Rough 3/18/2020 Not Ready for Inspection TIM CHRISTENSEN
Structural Steel Frame 3/18/2020 Partial Approval TIM CHRISTENSEN
Verify Sprinkler Sign Off 3/18/2020 Not Ready for Inspection TIM CHRISTENSEN
Footing/Foundation/Slab 4/3/2020 Partial Approval TIM CHRISTENSEN
Green Building Rough 4/28/2020 Not Ready for Inspection TIM CHRISTENSEN
Structural Steel Frame 4/28/2020 Partial Approval TIM CHRISTENSEN
Verify Sprinkler Sign Off 4/28/2020 Not Ready for Inspection TIM CHRISTENSEN
Footing/Foundation/Slab 5/4/2020 Partial Approval TIM CHRISTENSEN
Deputy Wood Construction 5/13/2020 No Access for Inspection ROBERT SHELLY
Excavation/Setback/Form/Re-Bar 5/14/2020 Partial Approval TIM CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 5/14/2020 Partial Approval TIM CHRISTENSEN
Green Building Rough 6/18/2020 Not Ready for Inspection TIM CHRISTENSEN
Structural Steel Frame 6/18/2020 Partial Approval TIM CHRISTENSEN
Verify Sprinkler Sign Off 6/18/2020 Not Ready for Inspection TIM CHRISTENSEN
Pre-Inspection 6/23/2020 Not Ready for Inspection MICHAEL PELHAM
Footing/Foundation/Slab 6/26/2020 Partial Approval TIM CHRISTENSEN
Deputy Wood Construction 6/30/2020 Approved ROBERT SHELLY
Floor/Roof Diaphrgm/Shear Wall 6/30/2020 Partial Approval TIM CHRISTENSEN
Deputy Wood Construction 8/12/2020 Corrections Issued ROBERT SHELLY
Floor/Roof Diaphrgm/Shear Wall 8/14/2020 Partial Approval JOHN KIDWELL
Deputy Steel/Welding 11/13/2020 Conditional Approval KEVIN SARGSYAN
Deputy Steel/Welding 11/19/2020 Partial Approval MATT KELLERMAN
Pre-Inspection 3/3/2021 Partial Inspection JUAN VALENZUELA
Pre-Inspection 1/12/2022 Partial Inspection JUAN VALENZUELA
Interior/Exterior Lathing 8/11/2022 Partial Approval ANDREW NAVE
Drywall Nailing 3/2/2023 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 4/6/2023 Partial Approval STEPHANIE SWANSON
Insulation 4/6/2023 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 4/19/2023 Partial Approval KEVIN SARGSYAN
Insulation 6/5/2023 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/9/2023 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 6/12/2023 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 6/30/2023 Partial Approval CARLOS MATAMOROS
Interior/Exterior Lathing 7/11/2023 Partial Approval HERBERT GIRON
Shower Pan 7/21/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 9/12/2023 Approved ARAM AVEDISIAN
Sewer 10/5/2023 Approved ARAM AVEDISIAN
Underground Mechanical 10/5/2023 Partial Approval ARAM AVEDISIAN
Interior/Exterior Lathing 10/18/2023 Partial Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 12/15/2023 Partial Approval CARLOS MATAMOROS
Insulation 12/15/2023 Not Ready for Inspection CARLOS MATAMOROS
Insulation 12/26/2023 Corrections Issued KEVIN SARGSYAN
Insulation 12/29/2023 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/10/2024 Not Ready for Inspection KEVIN SARGSYAN
Deputy Wood Construction 1/11/2024 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/11/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 2/2/2024 Partial Approval KEVIN SARGSYAN
HVAC-Rough 2/15/2024 Partial Approval ASHLEY THOMPSON
Interior/Exterior Lathing 2/27/2024 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 5/10/2024 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 5/10/2024 Not Ready for Inspection KEVIN SARGSYAN
Special/Order Compliance 6/26/2024 Partial Approval ARAM AVEDISIAN
BUILDING-Rough-Frame 9/11/2024 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 9/11/2024 Partial Approval KEVIN SARGSYAN
Green Building Rough 9/11/2024 Not Ready for Inspection KEVIN SARGSYAN
Verify Sprinkler Sign Off 9/11/2024 Approved KEVIN SARGSYAN
HVAC-Rough 10/29/2024 Partial Approval SEAN HAUPT
Interior/Exterior Lathing 11/1/2024 Partial Approval ARAM AVEDISIAN
Underground Mechanical 2/5/2025 Partial Approval KEVIN SARGSYAN
Underground Mechanical 5/19/2025 Corrections Issued TEMISTOCLES CAAL
Special/Order Compliance 6/4/2025 Corrections Issued HERBERT GIRON
Underground Mechanical 6/4/2025 Corrections Issued HERBERT GIRON
Underground Mechanical 6/10/2025 Partial Approval KEVIN SARGSYAN
Underground Mechanical 6/23/2025 Partial Approval MEL KHACHATOURIAN
ELECTRICAL-Rough 7/25/2025 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 8/1/2025 Partial Approval KEVIN SARGSYAN
Underground Mechanical 9/23/2025 Partial Inspection KEVIN SARGSYAN
Underground Mechanical 1/15/2026 Partial Approval KEVIN SARGSYAN
HVAC-Rough 1/16/2026 Partial Approval KEVIN SARGSYAN
HVAC-Rough 2/2/2026 Partial Approval MEL KHACHATOURIAN
HVAC-Rough 2/5/2026 Partial Approval KEVIN SARGSYAN
Underground Mechanical 2/5/2026 Corrections Issued KEVIN SARGSYAN
Interior/Exterior Lathing 2/11/2026 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 3/4/2026 Partial Approval KEVIN SARGSYAN
Pre-Inspection 6/9/2026 Partial Inspection KEVIN SARGSYAN