2580 W VENICE BLVD 90019

Certificate Information: 2580 W VENICE BLVD 90019

Application / Permit
18010-20000-06158
Plan Check / Job No.
B18VN21741
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
NEW 109'-6 1/2" X 54'-10", MAX HEIGHT 21'-4" RETAIL BUILDING - (CORE & SHELL ONLY)
Permit Issued
Issued on 6/8/2020
Issuing Office
Current Status
CofO Issued on 2/16/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/19/2018 APPLICANT
Assigned to Plan Check Engineer 1/17/2019 MOHAMMAD FIROUZBAKHT
Corrections Issued 1/22/2019 MOHAMMAD FIROUZBAKHT
Quality Review Completed 1/23/2019 FELIX FIGUEROA
Green Plans Picked Up 1/24/2019 APPLICANT
Building Plans Picked Up 1/31/2019 APPLICANT
Disabled Access Plans Picked Up 1/31/2019 APPLICANT
Applicant returned to address corrections 6/26/2019 JOHNNY WU
Applicant returned to address corrections 6/27/2019 JOHNNY WU
Applicant returned to address corrections 7/2/2019 JOHNNY WU
Applicant returned to address corrections 7/9/2019 JOHNNY WU
Applicant returned to address corrections 7/10/2019 JOHNNY WU
Applicant returned to address corrections 7/30/2019 JOHNNY WU
Applicant returned to address corrections 8/1/2019 JOHNNY WU
Applicant returned to address corrections 9/13/2019 JOHNNY WU
Plan Check Approved 9/27/2019 JOHNNY WU
Issued 6/8/2020 APPLICANT
TCO Issued (Expire Date: 06-21-2022) 12/23/2021 ERNESTO CORRAL
TCO Revoked (Expire Date: 06-21-2022) 12/23/2021 ERNESTO CORRAL
CofO in Progress 2/16/2022 ERNESTO CORRAL
Permit Finaled 2/16/2022 ERNESTO CORRAL
CofO Issued 2/16/2022 ERNESTO CORRAL
Permit Finaled 2/16/2022 ERNESTO CORRAL

Permit Application Clearance Information

Permit Cleared 3/14/2019 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 3/21/2019 ELAINE LEI
Highway dedication Cleared 3/21/2019 ELAINE LEI
Green Code Cleared 6/11/2019 DAVID MATSON
Sewer availability Cleared 6/13/2019 ADRIAN SANCHEZ
Hydrant and Access approval Cleared 6/18/2019 GEORGE SUCHAND
ZI Cleared 6/18/2019 SOPHIE GABEL-SCHEINBAU
Comm Cor/Mini-Mall Cleared 9/6/2019 LATANYA ROUX
Comm Cor/Mini-Mall Cleared 9/6/2019 LATANYA ROUX
ZA Case Cleared 9/6/2019 LATANYA ROUX
Low Impact Development Cleared 9/11/2019 JORGE MEJIA LEMUS
DAS Clearance Cleared 9/16/2019 MOHAMMAD FIROUZBAKHT
Roof/Waste drainage to street Cleared 9/19/2019 EMIL KYUPELYAN

Contact Information

Architect Epstein,, Matthew D; Lic. No.: C29433 18100 BURBANK BLVD #22      TARZANA, CA 91356
Contractor Dynamic Design Build Inc; Lic. No.: 747205-B 11777 SAN VICENTE BLVD STE 800      LOS ANGELES, CA 90049
Engineer Arriola,, Kirby Norman; Lic. No.: C31416 PO BOX 5566      OXNARD, CA 93031
Engineer Peyton,, David E; Lic. No.: S3288 5722 E THE TOLEDO      LONG BEACH, CA 90803

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 9/21/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 9/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 9/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Methane Barrier 9/28/2020 Conditional Approval RAFAEL ESPINOZA
METHANE-Rough 9/28/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Methane Barrier 9/29/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/7/2020 Approved RAFAEL ESPINOZA
Footing/Foundation/Slab 10/7/2020 Approved RAFAEL ESPINOZA
METHANE-Barrier 10/7/2020 Approved RAFAEL ESPINOZA
METHANE-Subgrade 10/7/2020 Approved RAFAEL ESPINOZA
Masonry Wall/Backfill 10/16/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/19/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/21/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 10/26/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 10/27/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/30/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 11/20/2020 Approved RAFAEL ESPINOZA
METHANE-Rough 11/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 11/20/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 12/15/2020 Partial Approval RAFAEL ESPINOZA
Insulation 12/17/2020 Corrections Issued RAFAEL ESPINOZA
Insulation 12/18/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 12/18/2020 Approved RAFAEL ESPINOZA
Insulation 12/28/2020 Partial Approval RAFAEL ESPINOZA
Insulation 1/7/2021 Approved RAFAEL ESPINOZA
Drywall Nailing 1/14/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 1/19/2021 Approved RAFAEL ESPINOZA
Final 8/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 8/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Final 8/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 8/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 8/18/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 8/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 8/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 8/20/2021 Partial Approval RAFAEL ESPINOZA
Final 9/30/2021 Partial Inspection RAFAEL ESPINOZA
Green Building Final 9/30/2021 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Final 9/30/2021 Approved RAFAEL ESPINOZA
METHANE-Rough 9/30/2021 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 9/30/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 9/30/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 9/30/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 9/30/2021 Partial Approval RAFAEL ESPINOZA
Final 10/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 10/12/2021 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 10/12/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 10/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 10/12/2021 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 12/21/2021 Approved TED RIES
Final 12/22/2021 Conditional Approval TED RIES
SGSOV-Seismic Gas S/O Valve 12/22/2021 SGSOV No Gas TED RIES
Smoke Detectors 12/22/2021 Approved TED RIES
Verify Sprinkler Sign Off 12/22/2021 Approved TED RIES
Wood Frame 12/22/2021 Approved TED RIES