11211 N SEPULVEDA BLVD lot #44 91345

Certificate Information: 11211 N SEPULVEDA BLVD lot #44 91345

Application / Permit
18010-20000-05743
Plan Check / Job No.
B18VN20450
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW SFD/GARAGE, PLAN 2A, Lot-44 "Small lot subdivision pursuant to Tentative Tract Maps No 77105-SL. A certificate of occupancy (temporary or final) shall not be issued until after th efinal map has been recorded"
Permit Issued
Issued on 6/28/2019
Issuing Office
Valley
Current Status
CofO Issued on 8/9/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/30/2018 APPLICANT
Assigned to Plan Check Engineer 12/13/2018 CHON CHIO KUO
Green Plans Picked Up 12/19/2018 APPLICANT
Corrections Issued 12/27/2018 CHON CHIO KUO
Quality Review Completed 12/28/2018 STEVEN KIM
Building Plans Picked Up 12/28/2018 APPLICANT
Applicant returned to address corrections 2/14/2019 CHON CHIO KUO
Applicant returned to address corrections 4/24/2019 CHON CHIO KUO
Applicant returned to address corrections 5/3/2019 CHON CHIO KUO
Applicant returned to address corrections 5/7/2019 CHON CHIO KUO
Applicant returned to address corrections 5/21/2019 CHON CHIO KUO
Applicant returned to address corrections 5/23/2019 CHON CHIO KUO
Applicant returned to address corrections 6/6/2019 CHON CHIO KUO
Applicant returned to address corrections 6/13/2019 CHON CHIO KUO
Applicant returned to address corrections 6/20/2019 CHON CHIO KUO
Applicant returned to address corrections 6/25/2019 CHON CHIO KUO
Plan Check Approved 6/27/2019 CHON CHIO KUO
Issued 6/28/2019 LADBS
CofO in Progress 8/5/2021 JOSEPH SAGEN
Permit Finaled 8/9/2021 MICHAEL SMITH
CofO Issued 8/9/2021 MICHAEL SMITH
Permit Finaled 8/9/2021 MICHAEL SMITH

Permit Application Clearance Information

Low Impact Development Cleared 2/21/2019 MARTIN FRAGOSO
Address approval Cleared 4/16/2019 HOWARD COOPER
Miscellaneous Cleared 5/7/2019 CHON CHIO KUO
Hydrant and Access approval Cleared 5/16/2019 GEORGE SUCHAND
Green Code Cleared 5/22/2019 MICHAEL AYERS
Eng Process Fee Ord 176,300 Cleared 6/4/2019 LEE GUILBEAUX
Highway dedication Cleared 6/4/2019 LEE GUILBEAUX
Miscellaneous Cleared 6/4/2019 LEE GUILBEAUX
Miscellaneous Cleared 6/4/2019 LEE GUILBEAUX
Permit Cleared 6/4/2019 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 6/4/2019 LEE GUILBEAUX
Sewer availability Cleared 6/4/2019 LEE GUILBEAUX
Work Adjacent to Public Way Cleared 6/4/2019 LEE GUILBEAUX
Building over 3-story or 36-ft Cleared 6/6/2019 CALOSHA APPROVED
Opn space landscape/Water mgmt Cleared 6/25/2019 SOPHIE GABEL-SCHEINBAU
Tract Map conditions Cleared 6/25/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/25/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/25/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/25/2019 SOPHIE GABEL-SCHEINBAU

Contact Information

Architect Cunningham,, Gary Lynn; Lic. No.: C29285 18162 LILLIAN WAY      TUSTIN, CA 92780
Contractor D R Horton America'S Builder; Lic. No.: 765023-B 2280 WARDLOW CIRCLE STE 100      CORONA, CA 92880
Engineer Deihimi,, Amir Hossein; Lic. No.: C78194 23172 PLAZA POINTE DR STE 145      LAGUNA HILLS, CA 92653
Engineer Toney,, Noelle Camille; Lic. No.: C84700 2085 HIGHPOINTE DRIVE UNIT 204      CORONA, CA 92879

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Sewer 8/5/2019 Approved BRUCE ROZAK
Underground Mechanical 8/5/2019 Approved BRUCE ROZAK
Excavation/Setback/Form/Re-Bar 8/13/2019 Approved BRUCE ROZAK
Footing/Foundation/Slab 8/13/2019 Approved BRUCE ROZAK
Floor/Roof Diaphrgm/Shear Wall 8/21/2019 Partial Approval BRUCE ROZAK
Floor/Roof Diaphrgm/Shear Wall 8/26/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 9/4/2019 Partial Approval JOSEPH SAGEN
BUILDING-Rough-Frame 10/4/2019 Not Ready for Inspection DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 10/4/2019 Not Ready for Inspection DONALD SUNSERI
Green Building Rough 10/4/2019 Not Ready for Inspection DONALD SUNSERI
MERV13>=Rough 10/4/2019 Not Ready for Inspection DONALD SUNSERI
Verify Sprinkler Sign Off 10/4/2019 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 10/7/2019 Partial Approval DONALD SUNSERI
BUILDING-Rough-Frame 10/10/2019 Approved JOSEPH SAGEN
ELECTRICAL-Rough 10/10/2019 Approved JOSEPH SAGEN
Green Building Rough 10/10/2019 Approved JOSEPH SAGEN
HVAC-Rough 10/10/2019 Approved JOSEPH SAGEN
MERV13>=Rough 10/10/2019 Approved JOSEPH SAGEN
PLUMBING-Rough 10/10/2019 Approved JOSEPH SAGEN
Insulation 10/15/2019 Approved JOSEPH SAGEN
Drywall Nailing 10/17/2019 Approved JOSEPH SAGEN
Interior/Exterior Lathing 10/17/2019 Approved JOSEPH SAGEN
SGSOV-Seismic Gas S/O Valve 2/24/2020 SGSOV Approved JOSEPH SAGEN
Gas Test 2/26/2020 Approved JOSEPH SAGEN
Service/Power Release 5/1/2020 Approved JOSEPH SAGEN
ELECTRICAL-Final 7/28/2021 Not Ready for Inspection JOSEPH SAGEN
Final 7/28/2021 Not Ready for Inspection JOSEPH SAGEN
Green Building Final 7/28/2021 Not Ready for Inspection JOSEPH SAGEN
HVAC-Final 7/28/2021 Not Ready for Inspection JOSEPH SAGEN
MERV13>=Final 7/28/2021 Not Ready for Inspection JOSEPH SAGEN
PLUMBING-Final 7/28/2021 Not Ready for Inspection JOSEPH SAGEN
Smoke Detectors 7/28/2021 Not Ready for Inspection JOSEPH SAGEN
ELECTRICAL-Final 8/4/2021 Approved JOSEPH SAGEN
Final 8/4/2021 OK to Issue CofO JOSEPH SAGEN
Green Building Final 8/4/2021 Approved JOSEPH SAGEN
HVAC-Final 8/4/2021 Approved JOSEPH SAGEN
MERV13>=Final 8/4/2021 Approved JOSEPH SAGEN
PLUMBING-Final 8/4/2021 Approved JOSEPH SAGEN
Smoke Detectors 8/4/2021 Approved JOSEPH SAGEN