4852 E SELDNER ST 90032

Certificate Information: 4852 E SELDNER ST 90032

Application / Permit
18010-20000-05444
Plan Check / Job No.
B18VN19395
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) 71..5' x 41'11" IRREGULAR SHAPE NFPA13-D SPRINKLER THROUGHOUT PILES SUPPORTED 2-STORY DWELLING WITH ATTACHED GARAGE AND BREEZEWAY PER DESIGN
Permit Issued
Issued on 6/10/2019
Issuing Office
Metro
Current Status
CofO Issued on 5/20/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/8/2018 APPLICANT
Assigned to Plan Check Engineer 11/15/2018 ALDOUS CHIC
Corrections Issued 11/19/2018 ALDOUS CHIC
Building Plans Picked Up 11/27/2018 APPLICANT
Green Plans Picked Up 11/27/2018 APPLICANT
Quality Review Completed 2/25/2019 BINH PHAN
Plan Check Approved 2/25/2019 ALDOUS CHIC
Issued 6/10/2019 LADBS
CofO in Progress 5/10/2021 OSVALDO PARAMO
CofO in Progress 5/10/2021 OSVALDO PARAMO
CofO in Progress 5/10/2021 OSVALDO PARAMO
Permit Finaled 5/20/2021 DEROLD HAUFF
CofO Issued 5/20/2021 DEROLD HAUFF
Permit Finaled 5/20/2021 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 8/10/2018 ALDOUS CHIC
GPI Written Notices Cleared 11/17/2018 ALDOUS CHIC
Disturb/Remove Protected Trees Cleared 12/12/2018 JOHN KIM
Trees in Parkway Cleared 12/12/2018 JOHN KIM
Hydrant and Access approval Cleared 12/14/2018 GEORGE SUCHAND
BHO/Hillside ordinance Cleared 12/17/2018 MICHAEL CASTILLO
BHO/Hillside ordinance Cleared 12/17/2018 MICHAEL CASTILLO
BHO/Hillside ordinance Cleared 12/17/2018 MICHAEL CASTILLO
Eng Process Fee Ord 176,300 Cleared 12/17/2018 MICHAEL CASTILLO
Highway dedication Cleared 12/17/2018 MICHAEL CASTILLO
Permit Cleared 12/17/2018 MICHAEL CASTILLO
Sewer availability Cleared 12/17/2018 MICHAEL CASTILLO
Miscellaneous Cleared 12/18/2018 DANIEL KOZUBAL
Miscellaneous Cleared 12/18/2018 DANIEL KOZUBAL
Green Code Cleared 1/23/2019 PARISA ZAHABI
Low Impact Development Cleared 1/25/2019 JORGE MEJIA LEMUS
Miscellaneous Cleared 1/25/2019 ZIXUAN CHEN
Roof/Waste drainage to street Cleared 1/25/2019 ZIXUAN CHEN
"D" conditions Cleared 2/11/2019 SANTOS SANCHEZ
"Q" conditions Cleared 2/11/2019 SANTOS SANCHEZ
Miscellaneous Cleared 2/11/2019 SANTOS SANCHEZ
ZI Cleared 2/11/2019 SANTOS SANCHEZ

Contact Information

Contractor Owner-Builder       ,
Engineer Bustillos, Portillo, Alejandro Ivan; Lic. No.: C87257 4749 W 169TH STREET      LAWNDALE, CA 90260
Engineer Mahn,, Jonathan Edward; Lic. No.: C60293 12848 FOOTHILL BLVD      SYLMAR, CA 91381
Engineer Obando,, Gaspar Eduardo; Lic. No.: C71382 1453 14TH ST STE A      SANTA MONICA, CA 90404
Geologist Kennedy,, Cameron L; Lic. No.: EG2631 25208 W DOLCE COURT      STEVENSON RANCH, CA 91381

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/12/2019 Approved ENRIQUE MIRELES
Deputy Grading 7/2/2019 Approved ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 7/17/2019 Partial Approval ENRIQUE MIRELES
Deputy Reinf. Concrete 7/18/2019 Approved ENRIQUE MIRELES
Deputy Grading 7/24/2019 Approved ENRIQUE MIRELES
Piling/Pier/Caisson 7/26/2019 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 7/29/2019 Approved ENRIQUE MIRELES
Footing/Foundation/Slab 10/7/2019 Partial Approval ENRIQUE MIRELES
Footing/Foundation/Slab 10/24/2019 Partial Approval ENRIQUE MIRELES
Footing/Foundation/Slab 12/20/2019 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 1/7/2020 Approved ENRIQUE MIRELES
PLUMBING-Rough 2/11/2020 Partial Approval ENRIQUE MIRELES
Floor/Roof Diaphrgm/Shear Wall 4/17/2020 Partial Approval ENRIQUE MIRELES
Green Building Rough 4/17/2020 Not Ready for Inspection ENRIQUE MIRELES
Verify Sprinkler Sign Off 4/17/2020 Not Ready for Inspection ENRIQUE MIRELES
Wood Frame 4/30/2020 Approved ENRIQUE MIRELES
ELECTRICAL-Rough 5/28/2020 Corrections Issued OSVALDO PARAMO
HVAC-Rough 5/28/2020 Corrections Issued OSVALDO PARAMO
PLUMBING-Rough 5/28/2020 Not Ready for Inspection OSVALDO PARAMO
ELECTRICAL-Rough 6/2/2020 Approved ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 6/2/2020 Approved ENRIQUE MIRELES
PLUMBING-Rough 6/2/2020 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 6/5/2020 Approved ENRIQUE MIRELES
Insulation 6/8/2020 Approved OSVALDO PARAMO
Interior/Exterior Lathing 6/8/2020 Partial Approval OSVALDO PARAMO
Sewer 6/8/2020 Approved OSVALDO PARAMO
Drywall Nailing 6/19/2020 Approved OSVALDO PARAMO
Green Building Rough 6/19/2020 Approved OSVALDO PARAMO
Interior/Exterior Lathing 7/14/2020 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 3/22/2021 Approved OSVALDO PARAMO
Final 3/22/2021 Corrections Issued OSVALDO PARAMO
Verify Sprinkler Sign Off 3/22/2021 Approved OSVALDO PARAMO
Gas Test 3/26/2021 Approved OSVALDO PARAMO
PLUMBING-Final 3/26/2021 Approved OSVALDO PARAMO
ELECTRICAL-Final 3/30/2021 Partial Approval OSVALDO PARAMO
ELECTRICAL-Final 4/1/2021 Approved OSVALDO PARAMO
HVAC-Final 4/1/2021 Approved OSVALDO PARAMO
Final 4/14/2021 Not Ready for Inspection OSVALDO PARAMO
Green Building Final 4/14/2021 Approved OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 4/14/2021 SGSOV Approved OSVALDO PARAMO
Smoke Detectors 4/14/2021 Approved OSVALDO PARAMO
Final 5/3/2021 OK to Issue CofO OSVALDO PARAMO
Service/Power Release 5/3/2021 Approved OSVALDO PARAMO